Monthly Source Brief Archive
April 2025 Gold and Silver Miner Source Briefs
Public Source Briefs published or generated for April 2025. These monthly archives are crawlable discovery pages that point into the individual source summaries and original evidence.
April 2025 Briefs
Quarterly Report Q3 March FY25St Barbara Ltd · 2025-04-30Gold production for the month of March was 6,402 ounces at an AISC of A$2,760 per ounce, which reflects the first full month after commissioning of the Sizer crusher, the January reset of the SAG mill and the progression
Mar 2025Alkane Resources Ltd · 2025-04-29Site operating cash flow was A$29.0m for the quarter. FY2025 guidance for Tomingley of 70,000oz to 80,000oz production at an AISC of A$2,400/oz to $2,600/oz remains unchanged.
Cariboo Feasibility Study (April 2025)Osisko Development Corp. · 2025-04-28ODV's estimate based on Cariboo Gold Project's LOM average annual gold production of 202 koz for the first 5 years of production, as described in the 2025 FS.
2025 MRE Technical ReportG2 Goldfields Inc. · 2025-04-24Inferred Mineral Resources must not be included in the economic analysis, production schedules, or estimated mine life in publicly disclosed Pre-Feasibility or Feasibility Studies, or in the Life of Mine plans and cash f
