Eve Eve's Gold Miners Research Library
Monthly Source Brief Archive

May 2026 Gold and Silver Miner Source Briefs

Public Source Briefs published or generated for May 2026. These monthly archives are crawlable discovery pages that point into the individual source summaries and original evidence.

May 2026 Briefs

RPX GOLD PROVIDES CORPORATE UPDATE AND NEXT STEPS TO ADVANCE THE WAWA GOLD PROJECT TOWARDS A PRE-FEASIBILITY STUDYRPX Gold Inc. · 2026-05-20The PEA validated the Wawa Gold Project as a robust, capital-efficient project with a potential development opportunity with a low initial capital requirement and an exceptional return profile.&nbsp; Our focus now is to Silver One Commences an Airborne ZTEM Geophysical Survey at Its Candelaria Project, NevadaSilver One Resources Inc. · 2026-05-03To date, resources at Candelaria completed in accordance with National Instrument 43-101 (“NI 43-101”) constitute 108.18 million Measured and Indicated ounces of silver equivalent (“AgEq”) plus 29.46 million ounces of In Banyan Expands Indicated and Inferred Mineral Resource Estimate and Improves Grade at AurMac Deposit, Yukon, CanadaBanyan Gold Corp. · 2026-05-19With the updated Mineral Resource report completed, the focus now shifts to the forthcoming maiden PEA, which will showcase the economic potential of AurMac,” stated Tara Christie, President and CEO. “With reference to t Silver One Resources Announces Major 25,000 Metre Drill Program at CandelariaSilver One Resources Inc. · 2026-05-26The program, comprising up to 25,000 metres, marks the next phase of systematic resource growth and districtscale exploration following the Company’s earlier drilling and geophysical successes (See company’s news release Apollo Reports High-Grade Silver, Gold and Barite Results at Calico | Apollo SilverApollo Silver Corp. · 2026-05-11At Waterloo, sampling of the Lower Barstow-Pickhandle stratigraphic contact returned higher grade silver results, including 149 g/t Ag (J423538), 139 g/t Ag (J423588), and 80.7 g/t Ag (J423534), with one sample returning Argenta Silver Upsizes Drill Program to 25,000 m, Initiates Metallurgical and Key Technical Studies at El QuevarArgenta Silver Corp. · 2026-05-11The foundational Mineral Resource Estimate of the Yaxtché deposit boasts an indicated mineral resource of **45.3 million ounces of silver from 2.93 million tonnes grading 482 g/t Ag**, and an inferred resource of **4.1 m May 14, 2026Versamet Royalties Corp. · 2026-05-15We remain on track to achieve our 2026 production guidance of 20,000 to 23,000 GEOs for 2026, supported by several near-term catalysts that are expected to drive stronger GEO contributions in the second half of the year. Hecla Reports First Quarter 2026 ResultsHecla Mining Company · 2026-05-05Total cost of sales in first quarter 2026 of $82 million, with silver cash cost of ($11.94) per ounce and AISC of ($8.39) per ounce (both after by-product credits). AIFWest Red Lake Gold Mines Ltd · 2026-05-04The plant will process 33 t/h on average with a target grind size of approximately 80% passing 75 µm at an average LOM head grade of 8.16 g/t Au. VIEWMining Americas Inc. · 2026-05-25Darren Blasutti, CEO, commented, &nbsp;“We are very proud to have closed the US$75 million RCF with Scotiabank and National Bank, enabling us to make an initial drawdown to refinance our existing higher cost capital comm Impact Silver announces Q1 2026 financial results with revenue nearly tripling to $31.2 million and record net income of $11.3 millionIMPACT Silver Corp. · 2026-05-19IMPACT is in the strongest financial position in its history, with the resources to optimize Zacualpan, advance Plomosas, and pursue new opportunities in Mexico." Revenue from Zacualpan increased to $29.3 million in Q1 2 Heliostar Presents Record Q1 2026 Financial and Operating ResultsHeliostar Metals Ltd. · 2026-05-11This allows us to grow the business on two fronts - adding to our already substantial resource base and establishing the financial platform to build Ana Paula without equity dilution.&rdquo; &ldquo;Within the quarter, we ES Gold May12ESGold Corp · 2026-05-12Fully funded to commissioning and first gold production The Montauban project is driven by a large, well- defined tailings resource supported by modern 105% pre-tax IRR and <2-year payback from a drilling, QAQC and metal Quartz Mountain Gold Preliminary Economic Assessment NI 43-101 Technical ReportQ-Gold Resources Ltd. · 2026-05-25Table 1-4 LOM Operating Cost Summary US$/Tonne Mined US$/Tonne Processed Mining (OPEX) $3.57 $5.88 Mining (Equipment Finance) $0.53 $0.87 Processing & Support $5.60 $9.24 G&A $0.40 $0.66 Total $10.10 $16.64 Note: Variabl Miata Metals Corp. Condensed Interim Consolidated Financial Statements for the Three and Nine Months Ended March 31, 2026Miata Metals Corp. · 2026-05-29EXPLORATION PROPERTIES (continued) Exploration and evaluation expenditures Exploration and evaluation expenditures are costs incurred in the course of the initial search for mineral resources before the technical feasibi Brixton Metals H1 FY2026 Financial StatementsBrixton Metals Corporation · 2026-05-29The Company’s current policy is to keep larger cash balances invested in investment-grade short-term demand deposit certificates issued by its banking institutions. first mining commences 2026 drilling campaign and signs milestone drilling partnership with forage anicinape at the duparquet gold projectFirst Mining Gold · 2026-05-21Highlights from that program include drill hole DUP25-085 returning 3.74 g/t Au over 15.5 m and 7.18 g/t over 8.0 m, including 30.58 g/t over 1.65 m, and hole DUP25-090 returning 4.08 g/t Au over 12.0 m, including 11.20 CK Gold Project S-K 1300 Technical Report Summary Feasibility StudyU.S. Gold Corp. · 2026-05-15CK Gold Project S-K 1300 Technical Report 309 May 2026 Table 19.9: Annual Production and Cash Flow Forecast Period End Date Unit LoM Total 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2 Idaho Strategic Resources Q1 2026 Operating and Financial PerformanceIdaho Strategic Resources, Inc. · 2026-05-14Ore tonnes processed, feed grade, recovery, exploration targets, reserves, and future plans must not be substituted for actual production. Americas Gold and Silver Provides Notice of First Quarter 2026 Results and Conference Call PresentationAmericas Gold & Silver · 2026-05-01In December 2025, Americas acquired the fully permitted, past-producing Crescent Silver Mine (9 miles from Galena) with the world’s 3rd highest-grade silver resource, creating significant potential future synergies throu B2Gold Reports Q1 2026 ResultsB2Gold Corp. · 2026-05-06The study assumes a mill with an annual processing rate of 6.0 million tonnes per annum, an initial open pit mine life of 11 years, and a processing life of 13 years. Allied Gold Results News Release Q1 2026 VfinalAllied Gold Corporation · 2026-05-14OPERATING RESULTS SUMMARY For three months ended March 31, 2026 2025 Gold ounces Production 96,016 84,040 Sales(3) 99,878 131,520 Per Gold Ounce Sold Total Cost of Sales(4) $ 2,235 $ 1,838 Cash Costs(1) $ 2,048 $ 1,656 A Download Press Release PDF Format (opens in new window) PDF 211 KBAlamos Gold · 2026-05-28Results of the Meeting TSX:AGI The Company is reporting the voting results of its Meeting held virtually on Thursday, May 28, 2026. Alamos Gold Announces Management AppointmentsAlamos Gold · 2026-05-21Prior to that, he held a number of technical roles with increasing responsibility at National Bank Financial, Coeur Mining, De Beers Group and Dynatec Mining Services. Wallbridge Reports Initial Results from 2026 Martiniere Drill Program Expanding Mineralization along Dragonfly CorridorWallbridge Mining Company Limited · 2026-05-10The Phase 1 campaign is focused on the Dragonfly zone which forms the core of the Bug Lake deformation corridor and hosts the majority of the Martiniere mineral resource. &ldquo;The initial results from our 2026 program First Majestic Announces Q1 2026 Financial Results and Increased Quarterly Dividend Payment; Provides Management UpdatesFirst Majestic Silver · 2026-05-12The Company reports certain non-GAAP measures which include cash costs per AgEq ounce produced, cash costs per Au ounce produced, AISC per AgEq ounce produced, all-in sustaining cost per Au ounce produced, total producti CONDENSED CONSOLIDATED INTERIM STATEMENTS OF FINANCIAL POSITION...................................... 2TOREX GOLD RESOURCES INC · 2026-05-05Accordingly, they are classified as financial instruments measured at fair value through profit and loss, with changes in fair value recognized in the Condensed Consolidated Interim Statements of Operations and Comprehen MANAGEMENT’S DISCUSSIONTOREX GOLD RESOURCES INC · 2026-05-05Los Reyes At Los Reyes, $18.0 million is planned to conduct a 20,000 m drill program to de-risk and expand the resource base across Guadalupe, Z-T, and Central, and initiate a prefeasibility study in the second half of t Andacollo Technical ReportGalantas Gold Corporation · 2026-05-04Inferred Mineral Resources must not be included in the economic analysis, production schedules, or estimated mine life in publicly disclosed Pre-Feasibility or Feasibility Studies, or in the Life of Mine plans and cash f Pybar awarded exploration decline contract for Sunday CreekSouthern Cross Gold Consolidated Ltd · 2026-05-05Sunday Creek is a significant gold and antimony drill discovery in a Tier 1 location, with high-grade drill results including 85 composite intersections exceeding 100 g/t Au from 119.6 km of drilling. ODV Investor PresentationOsisko Gold Group Inc. · 2026-05-01Head grade, production and AISC based on FY25 results; reserves consist of proven reserves 0.873 Moz (12.457 Mt grading 2.18 g/t Au) and probable reserves 2.109 Moz (29.727 Mt grading 2.21 g/t). Management's Discussion and AnalysisOsisko Gold Group Inc. · 2026-05-11Management's Discussion and Analysis For the three months ended March 31, 2026 Cariboo Gold Project 2025 FS – Project Operating and Financial Metrics Assumptions Units 2025 FS – Base Case1 Gold price US$/oz 2,400 Exchang corporate presentationFirst Mining Gold · 2026-05-04This corporate presentation from First Mining Gold (May 2026) provides an overview of the company's assets, project status, financial position, and recent technical and economic studies. The company highlights its two fl eld q1 2026 Conference Call Presentation presentation may 1Eldorado Gold · 2026-05-01This document is the Q1 2026 conference call presentation for Eldorado Gold, providing forward-looking statements, risk disclosures, and an overview of non-IFRS financial measures. It outlines expectations for project ti Alamos Gold Reports Fourth Quarter and Year-End 2025 ResultsAlamos Gold · 2026-05-01Alamos Gold Inc. reported its Q4 and full-year 2025 financial and operational results, highlighting record free cash flow, increased revenues, and a significant dividend increase despite lower-than-expected production an Alamos Gold Reports Second Quarter 2024 ResultsAlamos Gold · 2026-05-01Alamos Gold Inc. reported record gold production and financial results for Q2 2024, exceeding guidance and achieving lower costs. The company remains debt-free at quarter-end, completed the acquisition of Argonaut Gold (