Briefing
The PEA will incorporate the 2026 updated Mineral Resource Estimate (“ MRE ”) (Effective date May 15, the technical report is available for review on SEDAR+ at www.sedarplus.ca . and the Company’s website) utilising the results from the 43,700 metres (“ m ”) drill program completed in 2025) focused on converting the higher grade zones to indicated, upgrading of un-drilled or un-estimated areas which were thus classif Key points: The PEA will incorporate the 2026 updated Mineral Resource Estimate (“ MRE ”) (Effective date May 15, the technical report is available for review on SEDAR+ at www.sedarplus.ca . and the Company’s website) utilising the. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.
Source Notes
The PEA will incorporate the 2026 updated Mineral Resource Estimate (“ MRE ”) (Effective date May 15, the technical report is available...
Extractive summary evidence · source
Extracted Document Text
This is the EGM normalized Markdown text available for this source. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.
# Banyan Gold Advances AurMac Toward a PEA with Engagement of Leading Mining Consultants, Yukon, Canada Source: https://banyangold.com/news-releases/banyan-gold-advances-aurmac-toward-a-pea-with-engagement-of-leading-mining-consultants-yukon-canada/ Published: 2026-07-07T07:00:00+00:00 Fetched: 2026-09-12T06:59:05.343+00:00 Source artifact: e43c49fc-521c-4b66-a76d-4cb050d5795b Normalizer input: text ## Content VANCOUVER, BC, July 7, 2026, – Banyan Gold Corp . (the “ Company ” or “ Banyan “) ( TSX-V: BYN ) ( OTCQB: BYAGF ) is pleased to announce the selection of consultants for the first Preliminary Economic Assessment (“ PEA ”) on the Company’s AurMac Project . Banyan has engaged AMC Mining Consultants (Canada) Ltd., Lycopodium (Americas) Ltd., BGC Engineering Inc. and other independent contractors to complete the PEA in Q4 2026. The PEA will incorporate the 2026 updated Mineral Resource Estimate (“ MRE ”) (Effective date May 15, the technical report is available for review on SEDAR+ at www.sedarplus.ca . and the Company’s website) utilising the results from the 43,700 metres (“ m ”) drill program completed in 2025) focused on converting the higher grade zones to indicated, upgrading of un-drilled or un-estimated areas which were thus classified as waste blocks to mineralized blocks, and to optimize the potential starter pits in support of maximizing the economics of the PEA, which is expected in Q4 2026. The study will highlight the economics for AurMac’s large gold endowment and benefits from strong local infrastructure, including existing highways, roads, hydro powerlines and cell phone service. Additionally, Banyan continues to undertake metallurgy studies to support the PEA to optimize the grind size and reagent consumption to maximize the Project economics.
