Bunker Hill Mining Corp. · BNKR document official

Bunker Hill is projected to generate approximately $25 million of annual average free cash flow over an initial 5-year mine life based on the current Probable reserves.

Briefing

Bunker Hill is projected to generate approximately $25 million of annual average free cash flow over an initial 5-year mine life based on the current Probable reserves. Key points: Bunker Hill is projected to generate approximately $25 million of annual average free cash flow over an initial 5-year mine life based on the current Probable reserves; Bunker Hill is projected to generate approximately $25 million of annual average free cash flow over an initial 5-year mine life based on the current Probable reserves; The primary objective of the test program is to complete metallurgical test work to improve met results over the Pre-feasibility Study (PFS) performed by Resource Development Inc. (RDi) for the Bunker Hill Project; Classification Pb % Zn % (x1,000) ($/Ton) Oz/Ton (x1,000) (x1,000) (x1,000) Measured (M) 2,374 $ 119.60 1.01 2,404 2.46 116,574 5.37 254,811 Indicated (I) 4,662 $ 119.81 1.00 4,657 2.37 221,295 5.48 510,964 Total M & I 7; Technical Report Effective August 29, 2022 Page 2 Table 1-2 Estimated Bunker Hill Production for Life of Mine Life of Mine (LOM) Totals/Average Metal Prices Zinc ($/lb) 1.5 Lead ($/lb) 0.95 Silver ($/oz) 22 Mine plan Tot; It will produce over 316 million pounds of zinc, 146 million pounds of lead, and 3 million ounces of silver at an all-in sustaining cost (“AISC”) of $0.77 per payable pound of zinc (net of by- products). This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.

Source Notes

Bunker Hill is projected to generate approximately $25 million of annual average free cash flow over an initial 5-year mine life based...

Extractive summary evidence · source

Bunker Hill is projected to generate approximately $25 million of annual average free cash flow over an initial 5-year mine life based...

Extractive summary evidence 2 · source

The primary objective of the test program is to complete metallurgical test work to improve met results over the Pre-feasibility Study (PFS)...

Extractive summary evidence 3 · source

Classification Pb % Zn % (x1,000) ($/Ton) Oz/Ton (x1,000) (x1,000) (x1,000) Measured (M) 2,374 $ 119.60 1.01 2,404 2.46 116,574 5.37 254,811...

Extractive summary evidence 4 · source

Extracted Document Text

This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.

# 43-101 Technical Report and Prefeasibility Study (PFS) September 30, 2022

Source: https://www.bunkerhillmining.com/_resources/reports/20221025-PFS-BNKR.pdf?v=091207
Fetched: 2026-09-12T07:01:09.133+00:00
Source artifact: 11632a4f-e052-4192-9fc1-1ce2c15bc099
Normalizer input: text

## Content

# 43-101 Technical Report and Prefeasibility Study (PFS) September 30, 2022
TECHNICAL REPORT AND PRE-FEASIBILITY STUDY FOR
UNDERGROUND MINING, MILLING AND CONCENTRATION OF LEAD, SILVER AND
ZINC
AT THE BUNKER HILL MINE
COEUR D’ALENE MINING DISTRICT
SHOSHONE COUNTY, IDAHO, USA
REPORT DATE SEPTEMBER 30, 2022
EFFECTIVE DATE: AUGUST 29, 2022
PREPARED FOR:
BUNKER HILL MINING CORP.
BY
QUALIFIED PERSONS:
Scott Wilson, C.P.G. Robert Todd, P.E.
Resource Development Associates, Inc. Minetech, USA, LLC
10262 Willowbridge Way 129 Denali Ln
Highlands Ranch, CO 80126 Butte, MT 59701
303-717-3672 775-397-4862
Peter Kondos, Ph.D.
YaKum Consulting Inc.
910A Logan Ave., Toronto, Ontario M4K 3E4 Canada
+1 (416) 616-9669
DATE AND SIGNATURE PAGE
Bunker Hill Mining Corp.: Technical Report and Pre-Feasibility Study for Underground Mining, Milling and
Concentration of Lead, Silver and Zinc at the Bunker Hill Mine, Coeur d’Alene Mining District, Shoshone County,
Idaho, USA.
Technical Report Effective Date: August 29, 2022
September 30, 2022
(signed/sealed) Scott E. Wilson
Scott E. Wilson, SME-RM, CPG
Geologist
(signed/sealed) Robert “Chip” Todd
Robert Todd, P.E.
Mining Engineer
(signed/sealed) Peter Kondos
Peter Kondos, Ph.D.
Consulting Metallurgist
AUTHOR CERTIFICATE
Scott E. Wilson
I, Scott E. Wilson, CPG, SME-RM, of Highlands Ranch, Colorado, as the author of the technical report entitled “Technical
Report and Pre-Feasibility Study for Underground Mining, Milling and Concentration of Lead, Silver and Zinc at the Bunker
Hill Mine, Coeur d’Alene Mining District, Shoshone County, Idaho, USA” (the “Technical Report”) with an effective date of
August 29, 2022 prepared for Bunker Hill Mining Corp. (the “Issuer”), do hereby certify:
1. I am currently employed as President by Resource Development Associates, Inc., Highlands Ranch, Colorado USA
80126.
2. I graduated with a Bachelor of Arts degree in Geology from the California State University, Sacramento in 1989.
3. I am a Certified Professional Geologist and member of the American Institute of Professional Geologists (CPG
#10965) and a Registered Member (#4025107) of the Society for Mining, Metallurgy and Exploration, Inc.
4. I have been employed as both a geologist and a mining engineer continuously for a total of 33 years. My experience
included resource estimation, mine planning, geological modeling, geostatistical evaluations, project
development, and authorship of numerous technical reports and preliminary economic assessments of various
projects throughout North America, South America and Europe. I have employed and mentored mining engineers
and geologists continuously since 2003.
5. I have read the definition of “Qualified Person” set out in National Instrument 43-101 (“NI 43-101) and certify that
by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant
work experience, I fulfill the requirements to be a “Qualified Person” for the purposes of NI 43-101.
6. I have made several personal inspections of the Bunker Hill Project with the most recent visit September 22, 2021.
7. I am responsible for Sections 1 through 12, 14, 19 through 20 and 23 through 27 of the Technical Report.
8. I am independent of the Issuer as independence is described in Section 1.5 of NI 43-101.
9. Prior to being retained by the Issuer, I have not had prior involvement with the property that is the subject of the
Technical Report.
10. I have read NI 43-101 and Form 43-101F1, and this Technical Report was prepared in compliance with NI 43-101.
11. As of the effective date of this Technical Report, to the best of my knowledge, information and belief, the portions
of the Technical Report for which I am responsible contain all scientific and technical information that is required
to be disclosed to make the portions of the Technical Report for which I am responsible not misleading.
Dated: September 30, 2022
(signed/sealed) Scott Wilson
Scott E. Wilson, CPG, SME-RM
AUTHOR CERTIFICATE
Robert H. Todd
I, Robert H. Todd, P.E., of Butte, Montana, as the author of the technical report entitled “Technical Report and Pre-Feasibility
Study for Underground Mining, Milling and Concentration of Lead, Silver and Zinc at the Bunker Hill Mine, Coeur d’Alene
Mining District, Shoshone County, Idaho, USA” (the “Technical Report”) with an effective date of August 29, 2022 prepared
for Bunker Hill Mining Corp. (the “Issuer”), do hereby certify:
1. I am currently a principal and co-owner of Minetech, LLC, located in Butte Montana.
2. I graduated with a Bachelor of Science degree in Mining Engineering from the University of Idaho, School of Mines,
Idaho.
3. I am a Registered Professional Engineer in the States of Idaho (5327), Nevada (7779) and Montana (10095).
4. I have worked in mining operations, consulting engineering and engineering construction contracting for over 41
years. Prior to forming Minetech my consulting career included serving as General Manager of Engineering for
Cementation USA in Sandy Utah, Vice President and Area Manager for Knight-Piesold in Elko, Nevada, and
managing numerous independent engineering and construction projects. Mine operations and technical
experience include: Technical Services Manager and then General Manager of the Jerritt Canyon Operations in
Elko, Nevada, Supervising Engineer for Newmont Mining Corporation in Elko, Nevada, Project Engineer and Project
Administrator for Noranda Minerals in Libby, Missoula and Cooke City Montana and Production Supervisor, Chief
Engineer and Mine Manager for Echo Bay Minerals at Hawthorne Nevada. I worked for Sunshine Mining in Kellogg
Idaho as I was attending the University of Idaho and then after graduation as a mine and project engineer until
they closed in 1986.
5. I have read the definition of “Qualified Person” set out in National Instrument 43-101 (“NI 43-101) and certify that
by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant
work experience, I fulfill the requirements to be a “Qualified Person” for the purposes of NI 43-101.
6. I have made several personal inspections of the Bunker Hill Project with the most recent visit September 2022.
7. I am responsible for Sections 15, 16, 18, 21 and 22 of the Technical Report.
8. I am independent of the Issuer as independence is described in Section 1.5 of NI 43-101.
9. Prior to being retained by the Issuer, I have not had prior involvement with the property that is the subject of the
Technical Report.
10. I have read NI 43-101 and Form 43-101F1, and this Technical Report was prepared in compliance with NI 43-101.
11. As of the effective date of this Technical Report, to the best of my knowledge, information and belief, the portions
of the Technical Report for which I am responsible contain all scientific and technical information that is required
to be disclosed to make the portions of the Technical Report for which I am responsible not misleading.
Dated: September 30, 2022
(signed/sealed) Robert H. Todd
Robert H. Todd, P.E.
AUTHOR CERTIFICATE
Peter Kondos, Ph.D.
I, Peter Kondos, Ph.D.., of Toronto, Ontario Canada, as the author of the sections 13 and 17 in the technical report entitled
“Technical Report and Pre-Feasibility Study for Underground Mining, Milling and Concentration of Lead, Silver and Zinc at
the Bunker Hill Mine, Coeur d’Alene Mining District, Shoshone County, Idaho, USA” (the “Technical Report”) with an
effective date of August 29, 2021 prepared for Bunker Hill Mining Corp. (the “Issuer”), do hereby certify:
1. I am currently employed as CEO of YaKum Consulting Inc. with an office at 910A Logan Ave., Toronto, Ontario M4K
3E4 Canada.
2. I am a graduate of McGill University in Montreal, Canada (Master of Engineering in 1983 and Ph. D. in
Hydrometallurgical Engineering in 1989).
3. I am a Fellow Member (AusIMM #334726) of the Australian Institute of Mining and Metallurgy and Fellow (#94171)
of the Canadian Institute of Mining and Metallurgy.
4. I have 35 years of experience in the areas of metallurgy and mining. I have managed projects in research, process
development for new properties and expansions, led multidisciplinary teams and strategic teams, plant
troubleshooting, due diligence for acquisitions and overall business management. I have authored over 30
technical publications, 10 patents and several books, and I have been the recipient of three prestigious awards.
5. I have read the definition of “Qualified Person” set out in National Instrument 43-101 (“NI 43-101) and certify that
by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant
work experience, I fulfill the requirements to be a “Qualified Person” for the purposes of NI 43-101.
6. I have not visited the Bunker Hill Mine, however a site visit was not required for my role in this report.
7. I am responsible for Sections 13 and 17 of the Technical Report.
8. I am independent of the Issuer as independence is described in Section 1.5 of NI 43-101.
9. Prior to being retained by the Issuer, I have not had prior involvement with the property that is the subject of the
Technical Report.
10. I have read NI 43-101 and Form 43-101F1, and this Technical Report was prepared in compliance with NI 43-101.
11. As of the effective date of this Technical Report, to the best of my knowledge, information and belief, the portions
of the Technical Report for which I am responsible contain all scientific and technical information that is required
to be disclosed to make the portions of the Technical Report for which I am responsible not misleading.
Dated: September 30, 2022
(signed) Peter Kondos, Ph.D.
Peter Kondos, Ph.D.
TABLE OF CONTENTS
DATE AND SIGNATURE PAGE ............................................................................................................................................ 2
AUTHOR CERTIFICATE ....................................................................................................................................................... 3
AUTHOR CERTIFICATE ....................................................................................................................................................... 4
AUTHOR CERTIFICATE ....................................................................................................................................................... 5
1 SUMMARY ................................................................................................................................................................ 1
2 INTRODUCTION ........................................................................................................................................................ 9
3 RELIANCE ON OTHER EXPERTS ................................................................................................................................ 12
4 PROPERTY DESCRIPTION AND LOCATION ............................................................................................................... 13
5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY ......................................... 34
6 HISTORY ................................................................................................................................................................. 35
7 GEOLOGICAL SETTING AND MINERALIZATION ........................................................................................................ 42
8 DEPOSIT TYPES ....................................................................................................................................................... 60

[Excerpt trimmed for readability. Open the original source for the complete filing or document.]