Company Source Briefs
Osisko Development Corp.
Selected public source briefings connected to Osisko Development Corp.. Use these pages as entry points into original filings, announcements, videos, and the EGM miner profile.
Research alerts for Osisko Development Corp.
Search engines can see this public research page. Members use the live EGM product for alerts, watchlists, comparison tools, and database-backed miner profiles.
Briefs
OSISKO ANNOUNCES FILING OF THE TECHNICAL REPORT FOR THE SAN ANTONIO MINERAL RESOURCE ESTIMATE, SONORA STATE, MEXICOnews · 2022-07-22Under NI 43-101, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies or economic studies except for preliminary economic assessments.
factsheet cariboodocument · 2026-09-042025 FEASIBILITY: ROBUST FREE CASH FLOW PROFILE1,2 after-tax, C$ millions Gold payable production (koz) 223 207 207 199 176 181 183 177 171 +$163 112 Incremental Free Cash Flow US$3,300/oz Au +$141 +$244 +$138 +$121 +$13
OSISKO DEVELOPMENT ANNOUNCES FILING OF TECHNICAL REPORT FOR THE NEWLY-ACQUIRED TINTIC PROJECT AND PRODUCING UNDERGROUND TRIXIE MINEnews · 2022-06-10We believe that we have the potential to define the resource estimate and provide a basis for future production at a low capital cost.
OSISKO DEVELOPMENT ANNOUNCES PRELIMINARY ECONOMIC ASSESSMENT FOR THE CARIBOO GOLD PROJECT AND REFILING CERTAIN CONTINUOUS DISCLOSURE DOCUMENTSfiling · 2022-05-24These mineral resources have informed an 8,000 tonnes per day (“tpd") scenario over a 12-year operating mine life, which highlights the potential growth of the Cariboo Gold Project.
ODV Investor Presentationdocument · 2026-05-01Head grade, production and AISC based on FY25 results; reserves consist of proven reserves 0.873 Moz (12.457 Mt grading 2.18 g/t Au) and probable reserves 2.109 Moz (29.727 Mt grading 2.21 g/t).
MDAdocument · 2026-05-11Management's Discussion and Analysis For the three months ended March 31, 2026 Cariboo Gold Project 2025 FS – Project Operating and Financial Metrics Assumptions Units 2025 FS – Base Case1 Gold price US$/oz 2,400 Exchang
Cariboo Feasibility Study (April 2025)document · 2025-04-28ODV's estimate based on Cariboo Gold Project's LOM average annual gold production of 202 koz for the first 5 years of production, as described in the 2025 FS.
Osisko Development Provides Infill Drilling Update on Its 13,000-Meter Lowhee Program at Cariboo Gold Project; Intercepts Include 596.40 g/t Gold Over 2.0 Meters from 6.1 Meters Downhole, Including 2,293.56 g/t Gold Overnews · 2026-09-04The six drill hole fans reported herein comprise an additional ~5,043 meters (" m ") of underground infill drilling, bringing the total tally of drilling with full results to 11,025 m, or ~80% of the planned total.
