# NI 43-101 Technical Report Little Deer 2024

Source Brief: https://evesgoldminers.com/research/source-briefs/firefly-metals-ltd-2024-11-29-ni-43-101-technical-report-little-deer-2024-fdd0861a
Original source: https://fireflymetals.com.au/wp-content/uploads/2026/04/20240626-FFM_Little_Deer_Tech_Report.pdf
Original published: 2024-11-29
EGM generated: 2026-09-04
Company: FIREFLY METALS LTD (FFM)

## Use Note

This is the Eve's Gold Miners normalized Markdown copy of an official or regulatory public source. It is provided for readability, search discovery, and research resilience. The original source remains authoritative for legal, regulatory, and investment decisions.

## Extracted Document Text

# NI 43-101 Technical Report Little Deer 2024

Source: https://fireflymetals.com.au/wp-content/uploads/2026/04/20240626-FFM_Little_Deer_Tech_Report.pdf
Published: 2024-11-29T00:00:00+00:00
Fetched: 2026-05-12T14:53:42.822+00:00
Source artifact: fdd0861a-6c5e-4235-a185-18c9c6ade9a7
Normalizer input: text

## Content

# NI 43-101 Technical Report Little Deer 2024
TECHNICAL REPORT
AND UPDATED MINERAL RESOURCE ESTIMATE
OF THE
LITTLE DEER COMPLEX COPPER DEPOSITS,
NEWFOUNDLAND, CANADA
LONGITUDE 56° 02’29” W AND LATITUDE 49° 33’55” N
UTM NAD83 ZONE 21N 569,330 m E AND 5,490,725 m N
FOR
FIREFLY METALS CANADA LIMITED
NI 43-101 & 43-101F1
TECHNICAL REPORT
FINAL
Eugene Puritch, P.Eng., FEC, CET, P&E Mining Consultants Inc.
Jarita Barry, P.Geo., P&E Mining Consultants Inc.
Timothy Froude, P.Geo., Independent Consultant
Prepared by:
P&E Mining Consultants Inc.
Report 459
Effective Date: June 26, 2024
Signing Date: November 29, 2024
TABLE OF CONTENTS
1.0 SUMMARY .........................................................................................................................1
1.1 Property Description and Land Tenure ....................................................................1
1.2 Access, Infrastructure, Physiography ......................................................................1
1.3 Historical Exploration, Development and Mining ...................................................2
1.4 Geology, Mineralization, Deposit Type...................................................................2
1.5 Exploration and Drilling ..........................................................................................3
1.6 Data Security and Verification.................................................................................3
1.7 Mineral Processing and Metallurgical Testing ........................................................4
1.8 Mineral Resources ...................................................................................................4
1.9 Environment, Permitting, and Community and Social Impacts ..............................6
1.10 Conclusions and Recommendations ........................................................................7
2.0 INTRODUCTION ...............................................................................................................9
2.1 Terms of Reference ..................................................................................................9
2.2 Sources of Information ............................................................................................9
2.3 Units and Currency ................................................................................................11
2.4 Glossary and Abbreviation of Terms .....................................................................12
3.0 RELIANCE ON OTHER EXPERTS ................................................................................17
4.0 PROPERTY DESCRIPTION AND LOCATION .............................................................18
4.1 Little Deer Complex Property Location ................................................................18
4.2 Property Description and Tenure ...........................................................................18
4.3 Property Acquisition Deal......................................................................................20
4.3.1 Background ............................................................................................... 21
4.3.2 Consideration ............................................................................................... 21
4.3.3 Conditions Precedent ................................................................................ 22
4.3.4 Completion................................................................................................ 23
4.4 Permits and Obligations .........................................................................................23
4.5 Other Significant Factors and Risks ......................................................................23
5.0 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND
PHYSIOGRAPHY .............................................................................................................24
5.1 Access ....................................................................................................................24
5.2 Climate ...................................................................................................................24
5.3 Local Resources .....................................................................................................25
5.4 Infrastructure ..........................................................................................................25
5.5 Physiography..........................................................................................................28
6.0 HISTORY ..........................................................................................................................29
6.1 Little Deer Property ...............................................................................................29
6.2 Whalesback Property .............................................................................................30
6.3 Rambler Property Ownership 2013-2023 ..............................................................31
6.4 Historical and Previous Mineral Resource Estimates ............................................31
6.4.1 Pre-2009 Mineral Resource Estimates ...................................................... 31
6.4.2 2009-2010 Mineral Resources – Little Deer ............................................. 32
6.4.3 2011 Mineral Resources – Little Deer ...................................................... 34
6.4.4 2012 Mineral Resources – Whalesback .................................................... 35
6.5 Preliminary Economic Assessment........................................................................35
6.6 Past Production .....................................................................................................35
P&E Mining Consultants Inc. Page i
Firefly Metals Canada Limited, Little Deer Complex Copper Deposits, Technical Report No. 459
7.0 GEOLOGICAL SETTING AND MINERALIZATION ...................................................38
7.1 Regional Geology ..................................................................................................38
7.2 Property Scale Geology .........................................................................................39
7.3 Structural Geology .................................................................................................42
7.4 Geology and Mineralization at the Little Deer Deposit .........................................42
7.5 Geology and Mineralization at the Whalesback Deposit .......................................44
8.0 DEPOSIT TYPES ..............................................................................................................47
8.1 Metallogenic Model – Cyprus VMS Deposits .......................................................47
8.2 Deformation at Whalesback Deposit .....................................................................48
8.3 Little Deer Deposit Model .....................................................................................50
9.0 EXPLORATION................................................................................................................52
10.0 DRILLING .........................................................................................................................53
10.1 Little Deer Property ...................................................................................................53
10.1.1 1960 TO 1972 BRINEX ............................................................................ 53
10.1.2 1998 to 2000 Mutapa Gold Corp . ............................................................. 54
10.1.3 2007 to 2011 Cornerstone and Thundermin Joint Venture........................ 55
10.1.4 Rambler and Thundermin 2014 ................................................................ 63
10.2 Whalesback Property .................................................................................................65
11.0 SAMPLE PREPARATION, ANALYSES AND SECURITY ..........................................75
11.1 Sample Preparation and Security ...........................................................................75
11.1.1 2007 to 2011 Drilling ................................................................................ 75
11.2 Sample Preparation and Analysis ..........................................................................76
11.2.1 2007 to 2011 Drilling ................................................................................ 76
11.3 Quality Assurance/Quality Control Review ..........................................................76
11.3.1 2007 to 2009 Drilling ................................................................................ 77
11.3.1.1 Performance of Certified Reference Materials ........................ 77
11.3.1.2 Performance of Blank Material ................................................ 77
11.3.1.3 Performance of Secondary Laboratory Checks ....................... 77
11.3.2 2010 to 2011 Drilling ................................................................................ 77
11.3.2.1 Performance of Certified Reference Materials ........................ 77
11.3.2.2 Performance of Blank Material ................................................ 78
11.3.2.3 Performance of Secondary Laboratory Checks ....................... 78
11.4 Conclusion .............................................................................................................78
12.0 DATA VERIFICATION ...................................................................................................80
12.1 2011 Data Verification ...........................................................................................80
12.2 2011 P&E Site Visit and Independent Sampling ...................................................80
12.3 2021 P&E Site Visit and Independent Sampling ...................................................81
13.0 MINERAL PROCESSING AND METALLURGICAL TESTING .................................84
14.0 MINERAL RESOURCE ESTIMATE ...............................................................................88
14.1 Previous Mineral Resource Estimate .....................................................................89
14.2 Data Supplied .........................................................................................................89
14.3 Economic Considerations ......................................................................................92
14.4 Mineralization Domains.........................................................................................92
14.5 Exploratory Data Analysis .....................................................................................93
14.6 Compositing ...........................................................................................................95
14.7 Treatment of Extreme Values ................................................................................97
P&E Mining Consultants Inc. Page ii
Firefly Metals Canada Limited, Little Deer Complex Copper Deposits, Technical Report No. 459
14.8 Continuity Analysis ...............................................................................................97
14.9 Block Model...........................................................................................................98
14.10 Grade Estimation and Mineral Resource Classification ........................................98
14.11 Mineral Resource Estimate ....................................................................................99
14.12 Validation............................................................................................................

[Excerpt trimmed for readability. Open the original source for the complete filing or document.]
