# 2026 Hycroft Technical Report Summary with Updated MRE Download

Source Brief: https://evesgoldminers.com/research/source-briefs/hycroft-mining-2026-06-11-2026-hycroft-technical-report-summary-with-updated-mre-af752043
Original source: https://hycroftmining.com/_resources/reports/2026-Hycroft-Technical-Report-Updated-MRE.pdf?v=0.898
Original published: 2026-06-11
EGM generated: 2026-09-04
Company: Hycroft Mining (HYMC)

## Use Note

This is the Eve's Gold Miners normalized Markdown copy of an official or regulatory public source. It is provided for readability, search discovery, and research resilience. The original source remains authoritative for legal, regulatory, and investment decisions.

## Extracted Document Text

# 2026 Hycroft Technical Report Summary with Updated MRE Download

Source: https://hycroftmining.com/_resources/reports/2026-Hycroft-Technical-Report-Updated-MRE.pdf?v=0.898
Published: 2026-06-11T14:03:27+00:00
Fetched: 2026-06-11T14:17:48.21+00:00
Source artifact: af752043-e144-49e5-bac1-7f6ac60ed078
Normalizer input: text

## Content

HYCROFT MINE
Hycroft Technical Report Summary and
Initial Assessment
Nevada, USA
Effective Date: January 21, 2026
Prepared for
Hycroft Mining Holding Corporation
PO Box 3030
Winnemucca, NV 89446
Prepared by
Ausenco Engineering South USA
Contributing Authors:
Ausenco Engineering South USA Inc.
Hycroft Mining Holding Corporation
Independent Mining Consultants Inc.
WestLand Engineering & Environmental Services, Inc.
Date and Signature Page
This technical report summary (“TRS”), entitled “Initial Assessment and Technical Report Summary on the Hycroft Mine
Project, Nevada, US is current as of January 21, 2026, and has been prepared by:
Qualified Person or
Responsible for the following sections Signature Date
Consulting Firm
1.1, 1.2, 1.3, 1.8, 2.1-2.4.1, 2.5-2.7, 3.1-3.7, 3.10-3.12, 4,
Ausenco Engineering South
10, 12-19, 21, 22.1 22.2, 22.5, 22.7.1.3, 22.7.2.2, 23.3. “signed” January 21, 2026
USA, Inc.
23.5 and portions of sections 1.10, 1.11, 24, and 25
Hycroft Mining Holding
1.4, 3.9 and 5 “signed” January 21, 2026
Corporation
1.5, 1.6, 1.7, 1.9, 2.4.2, 6, 7, 8, 9, 11, 20, 22.3, 22.4,
Independent Mining 22.6, 22.7.1.1, 22.7.1.2, 22.7.1.4, 22.7.2.1, 22.7.2.3 23.1,
“signed” January 21, 2026
Consultants, Inc. 23.2, 23.4 and portions of sections 1.10, 1.11, 24, and
25
WestLand Engineering &
3.8 “signed” January 21, 2026
Environmental Services, Inc.
Table of Contents
1 Executive Summary ...................................................................................................................................................................................... 1
1.1 Introduction .......................................................................................................................................................................................................... 1
1.2 Terms of Reference ............................................................................................................................................................................................. 1
1.3 Mineral Tenure, Surface Rights, Water Rights, and Agreements..........................................................................................................2
1.4 History .....................................................................................................................................................................................................................2
1.5 Geology and Mineralization.............................................................................................................................................................................3
1.6 Exploration .............................................................................................................................................................................................................4
1.6.1 Exploration Targets .............................................................................................................................................................................4
1.7 Sampling ................................................................................................................................................................................................................4
1.8 Metallurgical Testwork .......................................................................................................................................................................................4
1.9 Mineral Resource Estimate ...............................................................................................................................................................................5
1.10 Conclusions ...........................................................................................................................................................................................................9
1.11 Recommendations ..............................................................................................................................................................................................9
2 Introduction ................................................................................................................................................................................................. 10
2.1 Introduction ........................................................................................................................................................................................................ 10
2.2 Terms of Reference ........................................................................................................................................................................................... 10
2.3 Qualified Persons ................................................................................................................................................................................................11
2.4 Site Visits and Scope of Personal Inspection .............................................................................................................................................11
2.4.1 Site inspection for Jonathan Cooper ............................................................................................................................................. 11
2.4.2 Site inspection for John Marek........................................................................................................................................................ 11
2.5 Effective Dates .....................................................................................................................................................................................................11
2.6 Information Sources and References ...........................................................................................................................................................11
2.6.1 General .................................................................................................................................................................................................. 11
2.6.2 Previous technical reports ................................................................................................................................................................ 11
2.7 Currency, Units, Abbreviations and Definitions ....................................................................................................................................... 12
3 Property Description .................................................................................................................................................................................. 16
3.1 Introduction ........................................................................................................................................................................................................ 16
3.2 Property and Title in Jurisdiction ................................................................................................................................................................. 16
3.3 Project Ownership ............................................................................................................................................................................................. 17
3.4 Property Agreements ....................................................................................................................................................................................... 19
3.5 Surface Rights .................................................................................................................................................................................................... 22
3.6 Water Rights ....................................................................................................................................................................................................... 22
3.7 Liabilities and Encumbrances ....................................................................................................................................................................... 22
3.8 Environmental Considerations ..................................................................................................................................................................... 22
3.9 Safety Considerations ..................................................................................................................................................................................... 23
HYCROFT MINE | Hycroft Technical Report Summary and Initial Assessment Page | i
3.10 Permitting Considerations ............................................................................................................................................................................. 23
3.10.1 Hycroft Expansion Permitting and Timelines ............................................................................................................................ 25
3.10.2 Crofoot Heap Leach Facility Closure ........................................................................................................................................... 27
3.11 Social License Considerations ...................................................................................................................................................................... 27
3.12 Project risks and uncertainties ..................................................................................................................................................................... 28
4 Accessibility, Climate, Local Resources, Infrastructure and Physiography ................................................................................... 29
4.1 Physiography ..................................................................................................................................................................................................... 29
4.2 Accessibility ........................................................................................................................................................................................................ 29
4.3 Climate ................................................................................................................................................................................................................. 29
4.4 Local Resources and Infrastructure ............................................................................................................................................................ 29
4.5 Seismicity ............................................................................................................................................................................................................ 32
5 History .......................................................................................................................................................................................................... 33
5.1 Regional History................................................................................................................................................................................................ 33
5.2 Property Exploration History ........................................................................................................................................................................ 33
5.3 Production ...

[Excerpt trimmed for readability. Open the original source for the complete filing or document.]