# ex 909308

Source Brief: https://evesgoldminers.com/research/source-briefs/novagold-resources-inc-2026-01-22-ex-909308-61c8e454
Original source: https://www.sec.gov/Archives/edgar/data/1173420/000117184326000374/ex_909308.htm
Original published: 2026-01-22
EGM generated: 2026-09-04
Company: NOVAGOLD Resources Inc. (NG)

## Use Note

This is the Eve's Gold Miners normalized Markdown copy of an official or regulatory public source. It is provided for readability, search discovery, and research resilience. The original source remains authoritative for legal, regulatory, and investment decisions.

## Extracted Document Text

# ex 909308

Source: https://www.sec.gov/Archives/edgar/data/1173420/000117184326000374/ex_909308.htm
Published: 2026-01-22T00:00:00+00:00
Fetched: 2026-05-12T12:33:14.886+00:00
Source artifact: 61c8e454-cee2-4c1c-a47c-0c0d7f5318cf
Normalizer input: text

## Content

# ex 909308
EX-96.1
13
ex_909308.htm
EXHIBIT 96.1
HTML Editor
Exhibit 96.1
Donlin Gold Project
Alaska, USA
S-K 1300 Technical Report Summary
Date and Signature Page
The technical report summary entitled &#8220;S-K 1300 Technical Report Summary on the Donlin Gold Project, Alaska, USA&#8221; dated 30 November 2025 was prepared by qualified persons employed by the following third-party firms comprising mining experts:
Date: 22 January 2026
&#8220;Signed &#8221;
On behalf of Wood Group USA Inc.
&#8220;Signed &#8221;
On behalf of Geosyntec Consultants International, Inc.
Project No.: 259219
Date and Signature Page
22 January 2026
Page 1
Donlin Gold Project
Alaska, USA
S-K 1300 Technical Report Summary
Contents
1.0
executive SUMMARY
1-1
1.1
Introduction
1-1
1.2
Terms of Reference
1-1
1.3
Principal Outcomes
1-2
1.4
Location, Climate, and Access
1-3
1.5
Mineral Tenure and Surface Rights
1-3
1.6
Royalties
1-5
1.7
Geology and Mineralization
1-6
1.8
Exploration
1-6
1.8.1
Exploration Potential
1-7
1.8.2
Drilling
1-7
1.9
Data Verification
1-8
1.10
Metallurgical Testwork
1-8
1.11
Mineral Resource Estimates
1-8
1.12
Mineral Reserve Estimates
1-11
1.13
Mine Methods
1-12
1.14
Processing and Recovery Methods
1-12
1.15
Infrastructure
1-12
1.16
Environment, Permitting and Agreements
1-13
1.17
Capital Costs
1-13
1.18
Operating Costs
1-15
1.19
Economic Analysis
1-15
1.20
Conclusions
1-16
1.21
Risks
1-16
1.22
Recommendations
1-16
2.0
Introduction
2-1
2.1
Terms of Reference
2-1
2.2
Qualified Persons
2-1
2.3
Site Visits
2-2
2.4
Information Sources
2-4
3.0
Property Description
3-1
3.1
Location
3-1
3.2
Origin of Native Title to the Lands
3-1
3.3
Mineral Tenure
3-4
3.3.1
Calista Lease
3-4
3.3.2
Lyman Lease
3-4
3.3.3
State Mining Claims
3-5
3.4
Surface Rights
3-5
3.5
Royalties and Encumbrances
3-6
3.6
Permits
3-7
Project No.: 259219
22 January 2026
TOC i
Donlin Gold Project
Alaska, USA
S-K 1300 Technical Report Summary
3.7
Environmental Liabilities
3-7
3.8
Significant Risk Factors
3-7
4.0
Accessibility, Climate, Local Resources, Infrastructure, and Physiography
4-1
4.1
Accessibility
4-1
4.2
Climate
4-1
4.3
Local Resources and Infrastructure
4-1
4.4
Physiography
4-2
4.5
Sufficiency of Surface Rights
4-2
5.0
History
5-1
5.1
Prior Ownership
5-1
5.2
Exploration History
5-1
6.0
Geological Setting, Mineralization, and deposit
6-1
6.1
Regional Geology
6-1
6.2
Project Geology
6-2
6.2.1
Lithologies
6-3
6.2.2
Structure
6-4
6.3
Deposit Setting
6-4
6.4
Paragenesis
6-4
6.5
Deposit Geology
6-5
6.5.1
Sedimentary Rocks
6-5
6.5.2
Igneous Rocks
6-7
6.5.3
Structure
6-8
6.6
Deposits
6-10
6.7
Mineralization
6-11
6.7.1
Vein and Disseminated Mineralization
6-11
6.8
Alteration
6-13
6.9
Minor Elements
6-13
6.10
Deposit Types
6-14
7.0
Exploration
7-1
7.1
Grids and Surveys
7-1
7.2
Geological Mapping
7-1
7.3
Geochemical Sampling
7-2
7.4
Geophysics
7-5
7.5
Excavations and Trenches
7-7
7.5.1
Legacy Excavations and Trenches
7-9
7.5.2
Recent Excavations and Trenches
7-9
7.6
Exploration Potential
7-10
7.6.1
Far Side
7-11
7.6.2
Duqum
7-11
7.6.3
Snow / Quartz
7-12
7.6.4
Dome
7-12
7.6.5
Ophir
7-13
7.7
Drilling
7-13
Project No.: 259219
22 January 2026
TOC ii
Donlin Gold Project
Alaska, USA
S-K 1300 Technical Report Summary
7.8
Drill Methods
7-18
7.9
Geological Logging
7-18
7.10
Recovery
7-19
7.11
Collar Surveys
7-19
7.12
Down-hole Surveys
7-20
7.13
Geotechnical and Hydrogeological
7-20
7.13.1
Drilling
7-20
7.13.2
Hydrology and Hydrogeology
7-20
7.13.3
TSF Geotechnical Site Investigation
7-21
7.13.4
Laboratory Testing Program
7-22
7.14
Metallurgical Drilling
7-24
7.15
Condemnation Drilling
7-24
7.16
Twin Drilling
7-24
7.17
Summary of Drill Intercepts
7-24
8.0
Sample Preparation, Analyses, and Security
8-1
8.1
Sampling Methods
8-1
8.2
Metallurgical Sampling
8-1
8.3
Specific Gravity Determination
8-2
8.4
Analytical and Test Laboratories
8-2
8.5
Sample Preparation and Analysis
8-3
8.6
Quality Assurance and Quality Control
8-5
8.6.1
Standard Reference Materials
8-5
8.6.2
Blank Materials
8-6
8.6.3
1995-2002 Protocol
8-6
8.6.4
2005-2006 Protocol
8-7
8.6.5
2007-2010 Protocol
8-7
8.6.6
2017 Protocol
8-7
8.6.7
2020 Protocol
8-7
8.6.8
2021-2023 Protocol
8-8
8.6.9
2025 Protocol
8-8
8.7
Databases
8-8
8.8
Sample Security
8-8
8.9
QP Opinion on Sample Preparation, Security, and Analytical Procedures
8-9
9.0
Data Verification
9-1
9.1
Drill Hole Database
9-1
9.1.1
2002-2008
9-1
9.1.2
2009-2025
9-1
9.1.3
SRK Audit (2022)
9-2
9.2
Geology and Mineral Resource Data
9-2
9.2.1
Wood (2025)
9-2
9.3
Mining
9-3
9.4
Metallurgy and Mineral Processing
9-4
9.5
Infrastructure
9-4
9.5.1
Utilities, Onsite Buildings and Off-site Infrastructure
9-4
Project No.: 259219
22 January 2026
TOC iii
Donlin Gold Project
Alaska, USA
S-K 1300 Technical Report Summary
9.5.2
Tailings and Geotechnical
9-4
9.5.3
Water Management
9-5
9.6
Environmental
9-5
9.7
QP Opinion on Data Adequacy
9-6
9.7.1
Database, Geology and Mineral Resources
9-6
9.7.2
Mining
9-6
9.7.3
Metallurgy and Mineral Processing
9-6
9.7.4
Utilities, Onsite Buildings and Off-site Infrastructure
9-6
9.7.5
Tailings and Geotechnical
9-6
9.7.6
Water Management
9-7
9.7.7
Environmental
9-7
10.0
Mineral Processing and Metallurgical Testing
10-1
10.1
Geology and Mineralogy
10-1
10.1.1
Mineralization
10-2
10.1.2
Gold Deportment
10-3
10.1.3
Mercury, Chlorine, Carbonates and Organic Carbon Deportment
10-3
10.2
Metallurgical Testwork
10-4
10.2.1
Samples
10-4
10.2.2
Comminution
10-7
10.2.2.1
2002&#8211;2003 Testwork
10-7
10.2.2.2
2004&#8211;2005 Testwork
10-8
10.2.2.3
2006 HQ Core Testwork
10-9
10.2.2.4
2006 Whole PQ Core Testwork
10-9
10.2.2.5
2007 HQ Core Testwork
10-9
10.2.2.6
Effect of Grind Size on BWI
10-10
10.2.2.7
Comminution Circuit Selection
10-11
10.2.2.8
Geostatistical Assessment
10-12
10.2.2.9
MCF2 Grinding Circuit Design Method and Capacity Definition
10-13
10.2.3
Flotation
10-14
10.2.3.1
Summary
10-14
10.2.3.2
1995-2006 Testwork
10-15
10.2.3.3
Mineralogy Summary
10-16
10.2.3.4
2006 Pilot-Plant Testing
10-16
10.2.3.5
Bench Testing of MCF2 Flowsheet
10-17
10.2.3.6
2007 Pilot-Plant Testing
10-18
10.2.3.7
2007 Variability Testing
10-18
10.2.3.8
Effect of Geological Oxidation on Flotation Performance
10-20
10.2.3.9
Flotation Circuit Scale-up and Modeling
10-20
10.2.3.10
2018 Bench Flotation Testwork
10-20
10.2.4
Pressure Oxidation
10-22
10.2.4.1
Chemistry of Pressure Oxidation and Hot Cure
10-22
10.2.4.2
2004 Batch Autoclave Testing
10-22
10.2.4.3
2006 Batch Autoclave Testing
10-24
10.2.4.4
2006 Pilot-Plant Testing
10-25
Project No.: 259219
22 January 2026
TOC iv
Donlin Gold Project
Alaska, USA
S-K 1300 Technical Report Summary
10.2.4.5
2007 Phase 1 Pilot-Plant Testing
10-25
10.2.4.6
Phase 2 Pilot-Plant Testing
10-26
10.2.5
Neutralization
10-29
10.2.5.1
Summary
10-29
10.2.5.2
2004 Neutralization Testwork
10-30
10.2.5.3
2005 Neutralization Testwork
10-30
10.2.5.4
2006 Preliminary Batch Neutralization Testing
10-30
10.2.5.5
2006 Pilot Neutralization
10-30
10.2.5.6
2007 Neutralization Phase 1 Bench Testing
10-31
10.2.5.7
2007 Neutralization Phase 1 Pilot Testing
10-31
10.2.5.8
2007 Neutralization Phase 2 Pilot Testing
10-33
10.2.5.9
2007 Neutralization Variability Testing
10-35
10.2.6
Carbon-in-Leach
10-36
10.2.6.1
Summary
10-36
10.2.6.2
Key Metallurgical Aspects of Planned Donlin CIL Circuit
10-36
10.2.6.3
2006 CIL of Flotation Tails
10-37
10.2.6.4
2006 CIL Optimization Testwork
10-37
10.2.6.5
2007 CIL Pilot-Plant Testing
10-37
10.2.6.6
2007 CIL Optimization Testwork
10-39
10.2.6.7
Cyanide Detoxification Testwork
10-39
10.2.7
Thickening and Counter-Current Decantation Washing
10-40
10.2.8
Tailings Neutralization Capacity
10-40
10.3
Recovery Estimates
10-41
10.3.1
Flotation
10-41
10.3.2
Pressure Oxidation
10-44
10.3.3
Overall Plant Gold Recovery
10-44
10.4
Deleterious Elements
10-44
10.5
QP Opinion on Data Adequacy
10-45
11.0
Mineral Resource Estimates
11-1
11.1
Summary
11-1
11.2
Database
11-1
11.3
Geologic Models
11-1
11.4
Exploratory Data Analysis
11-3
11.5
Density Assignment
11-4
11.6
Grade Capping/Outlier Restrictions
11-4
11.7
Composites
11-5
11.8
Block Model Set Up
11-5
11.9
Indicator Estimation
11-6
11.10
Estimation Methods
11-6
11.11
Classification of Waste Rock Management Categories
11-7
11.12
Validation
11-9
11.13
Classification
11-15
11.13.1
Uncertainties Considered During Confidence Classification
11-16
11.14
Reasonable Prospects for Eventual Economic Extraction
11-16
Project No.: 259219
22 January 2026
TOC v
Donlin Gold Project
Alaska, USA
S-K 1300 Technical Report Summary
11.14.1
Cut-off Determination
11-17
11.15
Mineral Resource Statement
11-18
11.16
Factors that May Affect the Mineral Resource Estimate
11-18
12.0
Mineral Reserve Estimates
12-1
12.1
Modifying Factors
12-1
12.1.1
Summary
12-1
12.1.2
Dilution and Mine Loss
12-2
12.1.3
Metallurgical Recovery
12-4
12.1.4
Gold Price Forecast
12-4
12.1.5
Pit Slopes
12-5
12.2
Cut-off Determination
12-8
12.3
Mineral Reserve Statement
12-9
12.4
Factors that May Affect the Mineral Reserve Estimate
12-10
13.0
Mining Methods
13-1
13.1
Throughput Considerations
13-1
13.2
Geotechnical Considerations
13-1
13.2.1
Site Investigations
13-1
13.2.2
Model Development
13-2
13.2.2.1
Geologic Model
13-2
13.2.2.2
Structural Model
13-2
13.2.2.3
Rock Mass and Geotechnical Properties
13-3
13.2.2.4
Slope Stability Analysis
13-4
13.2.2.5
Pit Slope Design Criteria
13-4
13.3
Pit Phases
13-5
13.4
Pit Design Parameters
13-6
13.5
Production Schedule
13-8
13.5.1
Planned Production Schedule
13-8
13.5.2
Pit-Phase Mining Rates
13-8
13.5.3
Mine Production Plan
13-9
13.5.4
Process Feed Plan
13-13
13.6
Ore Stockpiles
13-13
13.7
Waste Rock Facilities
13-14
13.8
Water Management
13-15
13.9
Blasting and Explosives
13-16
13.10
Mining Equipment
13-17
13.10.1
Drilling
13-18
13.10.2
Loading
13-18
13.10.3
Hauling
13-18
13.10.4
Secondary Fleet
13-18
13.10.5
Support Equipment
13-19
13.11
Work Schedule
13-20
13.11.1
Personnel Requirements
13-20
14.0
processing and recovery Methods
14-1
Project No.: 259219
22 January 2026
TOC vi
Donlin Gold Project
Alaska, USA
S-K 1300 Technical Report Summary
14.1
Plant Design
14-1
14.1.1
General
14-1
14.1.2
Crushing and Coarse Ore Stockpile
14-3
14.1.3
Grinding and Pebble Crushing
14-3
14.1.4
Flotation
14-4
14.1.5
Thickening, Concentrate Storage, Acidulation, and CCD Washing
14-5
14.1.6
Autoclave Plant
14-6
14.1.7
Counter Current Decantation Pressure Oxidization Thickening and Washing
14-8
14.1.8
Flotation Tailings Neutralization
14-8
14.1.9
Solids Carbon-in-Leach Neutralization
14-9
14.1.10
Carbon-in-Leach Cyanidation Circuit
14-9
14.1.11
Cyanide Destruction System
14-10
14.1.12
Carbon Elution, Electrowinning, Reactivation, and Gold Refining
14-10
14.1.13
Mercury Abatement Systems
14-11
14.2
Reagents
14-13
14.2.1
Lime
14-13
14.2.2
Sulfur Dioxide
14-14
14.3
Process Services
14-14
14.3.1
Air and Gaseous Oxygen
14-14
14.3.2
Plant Water Distribution
14-14
14.3.3
Power Requirements
14-16
14.4
Personnel Requirements
14-16
15.0
Infrastructure
15-1
15.1
Summary
15-1
15.2
Access and Logistics
15-1
15.2.1
Port-to-Mine Access Road
15-1
15.2.2
Road Construction
15-3
15.2.3
Airstrip
15-3
15.2.4
Cargoes
15-4
15.2.5
Fuel
15-4
15.3
Plant Site Facilities
15-4
15.4
Camps and Accommodation
15-6
15.5
Waste Rock Facilities
15-7
15.5.1
Location
15-7
15.5.2
Acid-base Accounting
15-7
15.5.3
Geotechnical Design
15-8
15.6
Tailings Storage Facilities
15-8
15.6.1
Site Geology
15-8
15.6.2
Seismicity
15-9
15.6.3
Geotechnical Site Investigation and Laboratory Testing
15-10
15.6.4
TSF Design
15-10
15.6.4.1
Design Criteria
15-10
15.6.4.2
Inflow Design Flood
15-10
15.6.4.3
Foundation Stability
15-10
Project No.: 259219
22 January 2026
TOC vii
Donlin Gold Project
Alaska, USA
S-K 1300 Technical Report Summary
15.6.4.4
Configuration
15-11
15.6.4.5
Seep

[Excerpt trimmed for readability. Open the original source for the complete filing or document.]
