# Quartz Mountain Gold Preliminary Economic Assessment NI 43-101 Technical Report

Source Brief: https://evesgoldminers.com/research/source-briefs/q-gold-resources-ltd-2026-05-25-quartz-mountain-gold-preliminary-economic-assessm-f827f57f
Original source: https://qgoldresources.com/Quartz_Mountain_Report_PEA_05_2026.pdf
Original published: 2026-05-25
EGM generated: 2026-09-04
Company: Q-Gold Resources Ltd. (QGR)

## Use Note

This is the Eve's Gold Miners normalized Markdown copy of an official or regulatory public source. It is provided for readability, search discovery, and research resilience. The original source remains authoritative for legal, regulatory, and investment decisions.

## Extracted Document Text

# Quartz Mountain Gold Preliminary Economic Assessment NI 43-101 Technical Report

Source: https://qgoldresources.com/Quartz_Mountain_Report_PEA_05_2026.pdf
Published: 2026-05-25T00:00:00+00:00
Fetched: 2026-08-02T23:10:03.092+00:00
Source artifact: f827f57f-f04e-4091-88fb-f673baf39880
Normalizer input: text

## Content

# Quartz Mountain Gold Preliminary Economic Assessment NI 43-101 Technical Report
Source: https://qgoldresources.com/Quartz_Mountain_Report_PEA_05_2026.pdf
Published: 2026-05-25
NI 43-101 Technical Report
Preliminary Economic Assessment
Quartz Mountain Gold Project
Lake County, Oregon, USA
Prepared for:
Prepared by:
Report Effective Date: 03 April 2026
Report Signed Date: May 22, 2026
Mineral Resource Effective Date: 28 February 2026
Authors:
Brian Arthur, Kappes Cassiday & Associates, RM, SME
Joanne Robinson, AGP Consultants Inc., P.Eng.
Fred H. Brown, FHB Consulting Services, PGeo
Jeremy Scott Collyard, SLR International Corporation, PMP, MMSA QP
IMPORTANT NOTICE
This report was prepared as National Instrument 43-101 Technical
Report for Q-Gold Resources (QGold) by Kappes, Cassiday &
Associates, AGP Mining Consultants Inc., SLR International
Corporation, and Fred Brown Consulting Services LLC. (collectively the
Report Authors). The quality of information, conclusions, and estimates
contained herein is consistent with the level of effort involved in the
Report Author’s services, based on i) information available at the time
of preparation, ii) data supplied by outside sources, and iii) the
assumptions, conditions, and qualifications set forth in this report. This
report is intended for use by QGold, subject to terms and conditions of
its contracts with each of the Report Authors. Except for the purposes
legislated under Canadian provincial and territorial securities law, any
other uses of this report by any third party is at that party’s sole risk.
Quartz Mountain Gold Preliminary Economic Assessment NI 43-101 Technical Report
CONTENTS
Introduction and Overview ........................................................................................ 1-1
Property Description and Ownership ......................................................................... 1-1
Geology and Mineralization....................................................................................... 1-2
Exploration and Drilling ............................................................................................. 1-2
Mineral Processing and Metallurgical Test Work ....................................................... 1-3
Mineral Resource Estimate ....................................................................................... 1-3
Mineral Reserve Estimate ......................................................................................... 1-5
Mining Methods ........................................................................................................ 1-5
Recovery Methods .................................................................................................... 1-6
Infrastructure............................................................................................................. 1-6
Environmental Studies, Permitting and Social or Community Impact ........................ 1-7
Capital and Operating Costs ..................................................................................... 1-8
Economic Analysis .................................................................................................... 1-9
1.13.1 Forward Looking Information ........................................................................... 1-12
1.13.2 Non-IFRS Measures ........................................................................................ 1-13
Interpretations and Recommendations.................................................................... 1-13
1.14.1 Recommendations ........................................................................................... 1-14
1.14.2 Risks and Opportunities ................................................................................... 1-16
Introduction and Overview ........................................................................................ 2-1
Project Scope and Terms of Reference .................................................................... 2-1
2.2.1 Scope of Work ................................................................................................... 2-1
2.2.2 Terms of Reference ........................................................................................... 2-2
Sources of Information .............................................................................................. 2-2
Qualified Persons and Site Visits .............................................................................. 2-3
Frequently Used Acronyms, Abbreviations, Definitions and Units of Measure........... 2-3
Property Location ...................................................................................................... 4-1
Property Description and Mineral Concession Status................................................ 4-2
Royalties ................................................................................................................... 4-3
4.3.1 1989 Royalty ...................................................................................................... 4-4
4.3.2 Wavecrest Royalty ............................................................................................. 4-4
4.3.3 Sheriff Royalty ................................................................................................... 4-5
4.3.4 Seabridge Royalty ............................................................................................. 4-6
Kappes, Cassiday & Associates Contents
May, 2026 Page 1
Quartz Mountain Gold Preliminary Economic Assessment NI 43-101 Technical Report
4.3.5 Predator Royalty ................................................................................................ 4-6
Other Liabilities ......................................................................................................... 4-6
Current Ownership History ........................................................................................ 4-7
Accessibility .............................................................................................................. 5-1
Local Resources and Infrastructure .......................................................................... 5-1
Physiography ............................................................................................................ 5-1
Climate ..................................................................................................................... 5-2
Ownership History of the Quartz Mountain Gold Property ......................................... 6-1
Quartz Mountain Exploration and Drilling History ...................................................... 6-4
Historical Resource Estimate .................................................................................... 6-7
Production History..................................................................................................... 6-7
Historical Metallurgy.................................................................................................. 6-7
Resource Model History ............................................................................................ 6-8
Regional and Local Geology ..................................................................................... 7-1
Property Geology ...................................................................................................... 7-1
Mineralization............................................................................................................ 7-3
Deposit Types ........................................................................................................... 8-1
Exploration ................................................................................................................ 9-1
Drill Program ........................................................................................................... 10-1
Summary ................................................................................................................ 11-1
Anaconda 1983 – 1985 ........................................................................................... 11-1
Wavecrest Resources 1986 - 1988 ......................................................................... 11-1
Quartz Mountain Gold Company 1986 – 1987 ........................................................ 11-1
Quincy Energy Corporation 2004 – 2005 ................................................................ 11-2
Golden Predator 2008............................................................................................. 11-2
Alamos Gold Incorporated 2014 - 2015................................................................... 11-2
Kappes, Cassiday & Associates Contents
May, 2026 Page 2
Quartz Mountain Gold Preliminary Economic Assessment NI 43-101 Technical Report
Background............................................................................................................. 12-1
Assay Verification ................................................................................................... 12-1
Drill Hole Data Validation ........................................................................................ 12-2
Site Visit and Independent Sampling ...................................................................... 12-2
Metallurgy QA/QC ................................................................................................... 12-3
Mineral Processing and Testing Summary .............................................................. 13-1
Anaconda (1985) – Anaconda Minerals Company - Metallurgical Tests on Drill Hole
Samples ............................................................................................................................ 13-4
13.2.1 Anaconda (1985) – Agitated Cyanidation Amenability...................................... 13-5
13.2.2 Anaconda (1985) - Gravity Separation ............................................................. 13-5
13.2.3 Anaconda (1985) - Flotation Test Results ........................................................ 13-6
Exploration Ventures, Co. (1985) – Heinen-Lidstrom Consultants – Direct Cyanidation
of Drill Cuttings Sample QM 19-45-95 ............................................................................... 13-7
13.3.1 EVC (1985) - Bottle Roll Cyanidation Test Results .......................................... 13-7
Anaconda (1985) – Kappes, Cassiday & Assoc. – Quartz Mountain Drillhole Cuttings
Cyanide Bottle Roll Tests .................................................................................................. 13-8
13.4.1 Exploration Ventures (1985) - Bottle Roll Cyanidation Test Results ................. 13-8
Quartz Mountain Gold Corp. (1986) – Heinen-Lidstrom Consultants – Preliminary
Cyanidation Tests on Quartz Hill Samples ........................................................................ 13-9
13.5.1 QMGC (1986) - Bottle Roll Cyanidation ........................................................... 13-9
Quartz Mountain Gold Corp. (1987) – Bateman Metallurgical Lab – Bottle Roll
Cyanidation ..................................................................................................................... 13-11
13.6.1 QMGC (1987) - Bottle Roll Cyanidation at P80 of ¼-Inch ................................ 13-11
Wavecrest Resources Inc. (1987) – Bateman Metallurgical Lab – Preliminary
Cyanidation Test Quartz Mountain #182784 Sample ...................................................... 13-12
13.7.1 WRI (1987) - Bottle Roll Cyanidation at P80 of 200 mesh ............................... 13-12
Wavecrest Resources Inc. (1987) – Bateman Metallurgical Lab – Preliminary Agitated
Cyanidat

[Excerpt trimmed for readability. Open the original source for the complete filing or document.]
