# NI 43-101 Technical Report Preliminary Economic Assessment of the Cerro Las Minitas Project, Durango State, Mexico, Effective Date

Source Brief: https://evesgoldminers.com/research/source-briefs/southern-silver-exploration-corp-ni-43-101-technical-report-preliminary-economic-62659930
Original source: https://southernsilverexploration.com/site/assets/files/4232/ssv_ni43101_tech_rpt_clm_2022.pdf
EGM generated: 2026-09-27
Company: Southern Silver Exploration Corp. (SSV)

## Use Note

This is the Eve's Gold Miners normalized Markdown copy of an official or regulatory public source. It is provided for readability, search discovery, and research resilience. The original source remains authoritative for legal, regulatory, and investment decisions.

## Extracted Document Text

# NI 43-101 Technical Report Preliminary Economic Assessment of the Cerro Las Minitas Project, Durango State, Mexico, Effective Date

Source: https://southernsilverexploration.com/site/assets/files/4232/ssv_ni43101_tech_rpt_clm_2022.pdf
Fetched: 2026-09-12T07:10:19.518+00:00
Source artifact: 62659930-a593-451d-b5c1-5bcaad8a8d8c
Normalizer input: text

## Content

# NI 43-101 Technical Report Preliminary Economic Assessment of the Cerro Las Minitas Project, Durango State, Mexico, Effective Date
M3-PN210405
Effective Date:
August 29, 2022
Issue Date:
October 13, 2022
Revision 0
Cerro Las Minitas Project
NI 43-101 Technical Report
Preliminary Economic Assessment
of the Cerro Las Minitas Project,
Durango State, Mexico
Daniel Roth, P.E., P. Eng. (M3) Garth Kirkham, P.Geo. (KGL)
Laurie Tahija, QP-MMSA (M3) Arthur Barnes, P.Eng. FSAIMM (MPC)
Richard Zimmerman, SME-RM (M3) Jason Allen, P.Eng. (Entech)
Prepared For:
C ERRO L AS M INITAS P ROJECT
NI 43-101 T ECHNICAL R EPORT – P RELIMINARY E CONOMIC A SSESSMENT
DATE AND SIGNATURES PAGE
The effective date of this report is August 29, 2022. See Appendix A, of the NI 43-101 Technical Report Preliminary
Economic Assessment Contributors and Professional Qualifications, for certificates of qualified persons. These
certificates are considered the date and signature of this report in accordance with NI 43-101.
M3-PN210405
13 October 2022
Revision 0 ii
C ERRO L AS M INITAS P ROJECT
NI 43-101 T ECHNICAL R EPORT – P RELIMINARY E CONOMIC A SSESSMENT
CERRO LAS MINITAS PROJECT
NI 43-101 TECHNICAL REPORT
TABLE OF CONTENTS
SECTION PAGE
DATE AND SIGNATURES PAGE .........................................................................................................................................II
TABLE OF CONTENTS ........................................................................................................................................................III
LIST OF FIGURES AND ILLUSTRATIONS ...................................................................................................................... VIII
LIST OF TABLES .................................................................................................................................................................. X
1 SUMMARY.............................................................................................................................................................. 1
1.1 PROPERTY DESCRIPTION ........................................................................................................................... 1
1.2 GEOLOGY .................................................................................................................................................. 1
1.3 EXPLORATION AND DRILLING ..................................................................................................................... 2
1.4 MINERAL PROCESSING AND METALLURGICAL TESTING .............................................................................. 2
1.5 MINERAL RESOURCE ................................................................................................................................. 3
1.6 MINING METHODS ...................................................................................................................................... 5
1.7 RECOVERY METHODS ................................................................................................................................ 6
1.8 PROJECT INFRASTRUCTURE....................................................................................................................... 7
1.9 MARKET STUDIES ...................................................................................................................................... 7
1.10 ENVIRONMENTAL ....................................................................................................................................... 8
1.11 CAPITAL AND OPERATING COSTS .............................................................................................................. 8
1.12 ECONOMIC ANALYSIS ................................................................................................................................ 9
1.13 CONCLUSIONS AND RECOMMENDATIONS ................................................................................................. 10
2 INTRODUCTION .................................................................................................................................................. 11
2.1 SOURCES OF INFORMATION ..................................................................................................................... 11
2.2 QUALIFIED PERSONS AND PERSONAL INSPECTIONS ................................................................................. 11
2.3 ABBREVIATIONS ...................................................................................................................................... 12
3 RELIANCE ON OTHER EXPERTS ..................................................................................................................... 14
4 PROPERTY DESCRIPTION AND LOCATION ................................................................................................... 15
4.1 MINERAL TENURE .................................................................................................................................... 15
4.2 PERMITTING............................................................................................................................................. 19
4.3 ENVIRONMENTAL AND SOCIOECONOMIC................................................................................................... 20
5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY............... 21
5.1 ACCESSIBILITY ........................................................................................................................................ 21
5.2 CLIMATE .................................................................................................................................................. 21
M3-PN210405
13 October 2022
Revision 0 iii
C ERRO L AS M INITAS P ROJECT
NI 43-101 T ECHNICAL R EPORT – P RELIMINARY E CONOMIC A SSESSMENT
5.3 LOCAL RESOURCES AND INFRASTRUCTURE ............................................................................................. 22
5.4 PHYSIOGRAPHY ....................................................................................................................................... 22
5.5 WATER RESOURCES................................................................................................................................ 22
6 HISTORY .............................................................................................................................................................. 23
6.1 SGS METALLURGICAL REPORT ............................................................................................................... 24
6.2 HISTORICAL RESOURCES......................................................................................................................... 25
7 GEOLOGICAL SETTING AND MINERALIZATION ............................................................................................ 26
7.1 MINITAS MINING DISTRICT GEOLOGY ....................................................................................................... 29
7.2 PROPERTY GEOLOGY .............................................................................................................................. 32
7.3 STRUCTURE............................................................................................................................................. 34
7.4 ALTERATION ............................................................................................................................................ 35
8 DEPOSIT TYPES ................................................................................................................................................. 37
8.1 SKARNOID ............................................................................................................................................... 37
8.2 CHIMNEY ................................................................................................................................................. 38
8.3 MANTO .................................................................................................................................................... 38
8.4 DYKE MARGIN ......................................................................................................................................... 38
9 EXPLORATION .................................................................................................................................................... 39
9.1 EXPLORATION ON THE CERRO LAS MINITAS PROPERTY ........................................................................... 39
9.2 EXPLORATION ON THE CLM WEST AND CLM EAST CLAIMS ..................................................................... 42
9.3 EXPLORATION ON THE EL SOL CLAIM ...................................................................................................... 45
10 DRILLING ............................................................................................................................................................. 46
10.1 DRILLING ON THE EL SOL CLAIM .............................................................................................................. 61
11 SAMPLE PREPARATION, ANALYSES AND SECURITY ................................................................................. 63
11.1 CHAIN OF CUSTODY ................................................................................................................................. 63
11.2 QUALITY ASSURANCE AND QUALITY CONTROL ........................................................................................ 63
11.3 COMMENTS.............................................................................................................................................. 69
12 DATA VERIFICATION.......................................................................................................................................... 70
13 MINERAL PROCESSING AND METALLURGICAL TESTING .......................................................................... 71
13.1 METALLURGICAL TESTING OVERVIEW ...................................................................................................... 71
13.2 2017-18 BCR TESTWORK ....................................................................................................................... 71
13.3 2018 SEQUENTIAL FLOTATION TEST ON SKARN FRONT FOR COPPER REMOVAL ...................................... 72
13.4 2019 LOCKED CYCLE TESTING ................................................................................................................ 73
13.5 VARIABILITY TESTING .............................................................................................................................. 76
13.6 2021 SEQUENTIAL FLOWSHEET TESTING ON LA BOCONA (BESS-TYPE) MINERALIZED MATERIAL ........... 78
M3-PN210405
13 October 2022
Revision 0 iv
C ERRO L AS M INITAS P ROJECT
NI 43-101 T ECHNICAL R EPORT – P RELIMINARY E CONOMIC A SSESSMENT
13.7 ARSENOPYRITE REJECTION FROM ZINC- IMPLICATIONS FOR AU RECOVERY. ............................................ 79
13.8 2021 LA BOCONA HIGH AU OXIDE MINERALIZED MATERIAL CYANIDATION TESTING ................................ 80
13.9 METALLURGICAL DATA FROM BCR TESTWORK ....................................................................................... 80
14 MINERAL RESOURCE ESTIMATES .................................................................................................................. 88
14.1 INTRODUCTION...........................................

[Excerpt trimmed for readability. Open the original source for the complete filing or document.]
