# 25.06.2026 Troilus Drills 157.5 Metres Grading 0.95 G/T AuEq While Targeting Inferred Material Within the Z87 Reserve Pit

Source Brief: https://evesgoldminers.com/research/source-briefs/troilus-mining-corp-25-06-2026-troilus-drills-157-5-metres-grading-0-95-g-t-aueq-2db7a41f
Original source: https://troilusmining.com/news-and-media/news-releases/troilus-drills-1575-metres-grading-095-gt-aueq-while-targeting-inferred-material-within-the-z87-reserve-pit
EGM generated: 2026-09-27
Company: Troilus Mining Corp. (TLG)

## Use Note

This is the Eve's Gold Miners normalized Markdown copy of an official or regulatory public source. It is provided for readability, search discovery, and research resilience. The original source remains authoritative for legal, regulatory, and investment decisions.

## Extracted Document Text

# 25.06.2026 Troilus Drills 157.5 Metres Grading 0.95 G/T AuEq While Targeting Inferred Material Within the Z87 Reserve Pit

Source: https://troilusmining.com/news-and-media/news-releases/troilus-drills-1575-metres-grading-095-gt-aueq-while-targeting-inferred-material-within-the-z87-reserve-pit
Fetched: 2026-09-12T07:11:29.592+00:00
Source artifact: 2db7a41f-e658-428e-8a2f-ccc065b3bac6
Normalizer input: text

## Content

*0.95 G/T AUEQ (0.82G/T AU, 0.88 G/T AG, 0.08 % CU), INCLUDING 1.37 G/T AUEQ (1.28 G/T AU, 0.99 G/T AG, 0.04 % CU) OVER 28 M
June 25, 2026, Montreal, Quebec &ndash; Troilus Mining Corp. (&ldquo;Troilus&rdquo; or the &ldquo;Company&rdquo;) ( TSX: TLG; OTCQX: CHXMF; FSE: CM5 ), is pleased to announce the first batch of results from the Z87 optimization drill program, as part of its ongoing 2026 Exploration activities at its Troilus Project located in north-central Quebec, Canada. The results reported include 13 drill holes totalling 3,718 metres, following the exploration program outlined in the Company&rsquo;s March 31, 2026 press release .
The ongoing Z87 optimization program is designed to support future mine planning by targeting inferred mineralization and previously unsampled intervals from historic drilling within the hangingwall of the main ore zone. All results reported today are located within the Z87 reserve pit, as defined in the Feasibility Study ( see May 14, 2024 press release ), and support the Company&rsquo;s objective of evaluating opportunities to improve future mine planning, including potential resource conversion, pit sequencing optimization, strip ratio improvements and early-year mill feed flexibility.
