Eve Eve's Gold Miners Research Library
Eve's Gold Miners Source Brief

Iberian Belt West NI 43-101 Technical Report (Mineral Resource Estimate) 2025

Emerita Resources Corp. · EMO document official

Results included: • IN068: Weak anomaly between 220-230m; • LR065: Significant conductivity mass subvertical at 560m; • LR087: Positive polarity indicates that the edge of ore is far from the drillhole; • LR101: Polarity change in the mineralised zone indicating the drillhole is on an edge; • LR117: Results indicate that the ore has continuity laterally; and • LR142: Measured the first 100m only and no anomaly detect

Briefing

Results included: • IN068: Weak anomaly between 220-230m; • LR065: Significant conductivity mass subvertical at 560m; • LR087: Positive polarity indicates that the edge of ore is far from the drillhole; • LR101: Polarity change in the mineralised zone indicating the drillhole is on an edge; • LR117: Results indicate that the ore has continuity laterally; and • LR142: Measured the first 100m only and no anomaly detect Key points: Results included: • IN068: Weak anomaly between 220-230m; • LR065: Significant conductivity mass subvertical at 560m; • LR087: Positive polarity indicates that the edge of ore is far from the drillhole; • LR101: Polarity; The drill assay results, geological logging and geological interpretation, have enabled the three-dimensional delineation of the VMS lenses for use in Mineral Resource estimation as outlined in Section 14.3; DST analysed the sample to contain 3.16 g/t Au, 19.2 g/t Ag, 1.06% As, 0.13% Cu, 0.48% Zn and 46.4% S t; However, this was for the MET-1 tailings sample which assayed 3.16 g/t Au and 19.2 g/t Ag; For Indicated Resources nominal drill spacing is 50m or less and blocks are mainly estimated in the first pass (i.e. informed by a minimum of two drillholes); The authors consider the sampling, sample preparation, security and analytical procedures for samples sent to both the ALS and AGQ laboratories, have been conducted in accordance with acceptable industry standards and th. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.

Source Notes

Results included: • IN068: Weak anomaly between 220-230m; • LR065: Significant conductivity mass subvertical at 560m; • LR087: Positive polarity indicates that...

Extractive summary evidence · source

The drill assay results, geological logging and geological interpretation, have enabled the three-dimensional delineation of the VMS lenses for use in Mineral...

Extractive summary evidence 2 · source

DST analysed the sample to contain 3.16 g/t Au, 19.2 g/t Ag, 1.06% As, 0.13% Cu, 0.48% Zn and 46.4% S t.

Extractive summary evidence 3 · source

However, this was for the MET-1 tailings sample which assayed 3.16 g/t Au and 19.2 g/t Ag.

Extractive summary evidence 4 · source

Extracted Document Text

This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.

# Iberian Belt West NI 43-101 Technical Report (Mineral Resource Estimate) 2025

Source: https://www.emeritaresources.com/_resources/financials/2025/NI-43-101-Technical-Report.pdf?v=091207
Fetched: 2026-09-12T07:02:30.513+00:00
Source artifact: 885f16a5-2741-41b7-9a97-ff67c663302c
Normalizer input: text

## Content

# Iberian Belt West NI 43-101 Technical Report (Mineral Resource Estimate) 2025
EMERITA RESOURCES CORP.
NI 43-101 TECHNICAL REPORT ON THE IBERIAN BELT WEST PROJECT,
SPAIN
April 30, 2025
Wardell Armstrong International (Part of SLR)
Baldhu House, Wheal Jane Earth Science Park, Baldhu, Truro, Cornwall, TR3 6EH, UK
Telephone: +44 (0)1872 560738 www.wardell-armstrong.com
DATE ISSUED: 30 April 2025
JOB NUMBER: ZT61-2308
VERSION: V3.0
REPORT NUMBER: MM1830
STATUS: Final
EMERITA RESOURCES CORP.
NI 43-101 TECHNICAL REPORT ON THE IBERIAN BELT WEST PROJECT, SPAIN
Effective Date: February 26, 2025
Signature Date: April 30, 2025
AUTHORED BY:
Frank Browning Principal Resource Geologist [“signed and sealed”]
Alan Clarke Technical Director (Geology) [“signed and sealed”]
James Turner Technical Director (Mineral Processing) [“signed and sealed”]
ENERGY AND CLIMATE CHANGE
ENVIRONMENT AND SUSTAINABILITY
INFRASTRUCTURE AND UTILITIES
Wardell Armstrong is the trading name of Wardell Armstrong International Ltd,
Registered in England No. 3813172. LAND AND PROPERTY
MINING AND MINERAL PROCESSING
Registered office: Sir Henry Doulton House, Forge Lane, Etruria, Stoke-on-Trent, ST1 5BD, United Kingdom
MINERAL ESTATES
UK Offices: Stoke-on-Trent, Cardiff, Carlisle, Edinburgh, Greater Manchester, London, Newcastle upon Tyne,
Sheffield, Taunton, Truro, West Bromwich. International Office: Almaty WASTE RESOURCE MANAGEMENT
EMERITA RESOURCES CORP.
NI 43-101 TECHNICAL REPORT ON THE IBERIAN BELT WEST
PROJECT, SPAIN
CONTENTS
1 SUMMARY ........................................................................................................................... 1
1.1 Introduction ............................................................................................................................ 1
1.2 Property Description and Ownership ..................................................................................... 1
1.3 Geology and Mineralisation .................................................................................................... 1
1.4 Exploration and Drilling........................................................................................................... 2
1.5 Sample Preparation, Analyses, Security and Data Verification .............................................. 2
1.6 Mineral Processing and Metallurgical Testing ........................................................................ 3
1.7 Mineral Resource Estimate ..................................................................................................... 3
1.8 Conclusions and Recommendations ....................................................................................... 5
2 INTRODUCTION ................................................................................................................... 7
2.1 Background ............................................................................................................................. 7
2.2 Terms of Reference ................................................................................................................. 7
2.3 Qualified Persons .................................................................................................................... 7
2.4 Personal Inspections ............................................................................................................... 7
2.5 WAI Declaration ...................................................................................................................... 8
2.6 Units and Currency.................................................................................................................. 9
3 RELIANCE ON OTHER EXPERTS ............................................................................................ 10
4 PROPERTY DESCRIPTION AND LOCATION ............................................................................ 11
4.1 Location................................................................................................................................. 11
4.2 Ownership ............................................................................................................................. 12
4.3 Mineral Tenure ..................................................................................................................... 12
4.4 Royalties ................................................................................................................................ 14
4.5 Surface Rights........................................................................................................................ 14
4.6 Permitting Considerations .................................................................................................... 14
4.7 Environmental Considerations.............................................................................................. 16
4.8 Existing Environmental Liabilities ......................................................................................... 16
5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY ........ 18
5.1 Accessibility and Transportation ........................................................................................... 18
5.2 Climate .................................................................................................................................. 18
5.3 Local Resources and Infrastructure ...................................................................................... 19
5.4 Physiography ......................................................................................................................... 19
6 HISTORY ............................................................................................................................ 20
6.1 Ownership History ................................................................................................................ 20
6.2 Exploration History ............................................................................................................... 21
6.3 Production History ................................................................................................................ 23
7 GEOLOGICAL SETTING AND MINERALISATION ..................................................................... 24
7.1 Regional Geology .................................................................................................................. 24
7.2 Local Geology ........................................................................................................................ 26
7.3 Deposit Geology .................................................................................................................... 28
8 DEPOSIT TYPES .................................................................................................................. 38
9 EXPLORATION .................................................................................................................... 40
9.1 Introduction .......................................................................................................................... 40
ZT61-2308/MM1830 Final V3.0 Page i
April 2025
EMERITA RESOURCES CORP.
NI 43-101 TECHNICAL REPORT ON THE IBERIAN BELT WEST
PROJECT, SPAIN
9.2 Geological Mapping .............................................................................................................. 40
9.3 Soil Geochemistry ................................................................................................................. 40
9.4 Geophysics ............................................................................................................................ 42
10 DRILLING ........................................................................................................................... 46
10.1 Type and Extent .................................................................................................................... 46
10.2 Procedures ............................................................................................................................ 50
10.3 Interpretation of Relevant Results ........................................................................................ 52
11 SAMPLE PREPARATION, ANALYSES, AND SECURITY ............................................................. 53
11.1 Sampling Methods ................................................................................................................ 53
11.2 Bulk Density .......................................................................................................................... 55
11.3 Sample Security..................................................................................................................... 57
11.4 Laboratories .......................................................................................................................... 57
11.5 Sample Preparation and Analysis.......................................................................................... 57
11.6 QAQC Protocol ...................................................................................................................... 61
11.7 QAQC Results ........................................................................................................................ 63
11.8 Adequacy of Procedures ....................................................................................................... 75
12 DATA VERIFICATION........................................................................................................... 76
12.1 Data Verification by Emerita ................................................................................................. 76
12.2 Database Cut-Off Dates ........................................................................................................ 76
12.3 Data Verification by The Authors .......................................................................................... 76
13 MINERAL PROCESSING AND METALLURGICAL TESTING ....................................................... 78
13.1 Introduction .......................................................................................................................... 78
13.2 Flotation Locked Cycle Test Results ...................................................................................... 78
13.3 Post-Flotation Process .......................................................................................................... 81
13.4 Summary of Metals Recoveries ............................................................................................ 84
13.5 Other Input Parameters and Comments .............................................................................. 84
14 MINERAL RESOURCE ESTIMATES ........................................................................................ 86
14.1 Introduction .......................................................................................................................... 86
14.2 Mineral Resource Estimate Data .......................................................................................... 86
14.3 Geological Interpretation and Domaining ............................................................................ 87
14.4 Boundary Analysis ................................................................................................................. 92
14.5 Compositing .......................................................................................................................... 92
14.6 Grade Capping..............................................................

[Excerpt trimmed for readability. Open the original source for the complete filing or document.]