Briefing
This NI 43-101 Technical Report confirms the technical and economic viability of the Project with an annual average gold production of 265 Au koz and silver production of 374 Ag koz over 13 years of the life-of-mine (“LOM”). Key points: This NI 43-101 Technical Report confirms the technical and economic viability of the Project with an annual average gold production of 265 Au koz and silver production of 374 Ag koz over 13 years of the life-of-mine (“LO; The closure costs have been estimated based on a unit cost of $0.35 per tonne of mineralized material mined, applied over the life-of-mine; The main conclusions on mining are as follows: • The production schedule is based on mining to ensure steady mill feed and maximize gold grade in the earlier years of the Project. • There was no geotechnical data availab; The total after-tax cash flow over the Project life is $4,035M, and NPV 5% is $3,390M pre-tax and $2,232M after-tax; Closure costs, including post-closure monitoring, have been estimated and are included in the sustaining capital and financial analysis sections of this Report, with a preliminary closure cost estimate of CAD 48.6 millio; The total after-tax cash flow over the Project life is CAD 4,035 million, and the NPV 5% is CAD 2,231 million after tax. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.
Source Notes
This NI 43-101 Technical Report confirms the technical and economic viability of the Project with an annual average gold production of 265...
Extractive summary evidence · source
The closure costs have been estimated based on a unit cost of $0.35 per tonne of mineralized material mined, applied over the...
Extractive summary evidence 2 · source
The main conclusions on mining are as follows: • The production schedule is based on mining to ensure steady mill feed and...
Extractive summary evidence 3 · source
The total after-tax cash flow over the Project life is $4,035M, and NPV 5% is $3,390M pre-tax and $2,232M after-tax.
Extractive summary evidence 4 · source
Extracted Document Text
This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.
# Preliminary Economic Assessment NI 43-101 Technical Report Source: https://goldx2.com/technical-report/ Fetched: 2026-09-12T07:59:18.299+00:00 Source artifact: 4c0c1723-1abc-43df-ac60-a644106a7699 Normalizer input: text ## Content # Preliminary Economic Assessment NI 43-101 Technical Report Source: https://goldx2.com/technical-report/ Mining Services # <strong>Preliminary Economic</strong> # <strong>Assessment NI 43-101 Technical Report</strong> # <strong>Moss Gold Project</strong> # <strong>Thunder Bay, Ontario, Canada</strong> Prepared for: **GOLD X2 MINING INC.** 450 Commerce Place 400 Burrard Street Vancouver, BC, V6C 3A6 Prepared by: **G MINING SERVICES INC.** Office 1010, 5025 Lapinière Blvd. Brossard, QC, J4Z 0N5 Alexandre Dorval, P.Eng., G Mining Services Inc. Dominic Lussier, P.Geo., G Mining Services Inc. Carl Michaud, P.Eng., MBA, G Mining Services Inc. Charles Taschereau, P.Eng., MBA, CPA, G Mining Services Inc. Nicolas Vanier-Larrivée, P.Eng., G Mining Services Inc. Simon Shankie, M.Sc., P.Geo., CSL Environmental & Geotechnical Inc. **Effective Date: January 26, 2026** **Issue Date: March 12, 2026** --- ## <strong>IMPORTANT NOTE</strong> ## <strong>General Conditions and Limitations</strong> ## <strong>Use of the report and its contents</strong> This report has been prepared for the exclusive use of the Client or its agents. The factual information, descriptions, interpretations, comments, recommendations and electronic files contained herein are specific to the projects described in this report and do not apply to any other project or site. Under no circumstances may this information be used for any other purposes than those specified in the scope of work unless explicitly stipulated in the text of this report of formally interpreted when taken individually or out-of-context. As well, the final version of this report and its content supersedes any other text, opinion or preliminary version produced by G Mining Services Inc. --- # <strong>Preliminary Economic Assessment NI 43-101</strong> # <strong>Technical Report – Moss Gold Project</strong> ## <strong>Thunder Bay, Ontario, Canada</strong> ## <strong>GOLD X2 MINING INC.</strong> 450 Commerce Place 400 Burrard Street Vancouver, BC. V6C 3A6 Tel: 1-604-404-4335 E-mail**:** <u>mhenrichsen@goldx2.com</u> Web Address: https://goldx2.com/ ## <strong>G MINING SERVICES INC.</strong> 5025 Lapinière Blvd. Office 1010, Brossard, Québec Canada J4Z 0N5 Tel: (450) 465-1950 • Fax: (450) 465-6344 E-mail: <u>m.gignac@gmining.com</u> Web Address: www.gmining.com **March 12, 2026** --- ## <strong>Qualified Persons</strong> Prepared by: (signed and sealed) “Alexandre Dorval” Date: <u>March 12, 2026</u> Alexandre Dorval, P. Eng., Chief Mining Engineer – Open Pit Mining G Mining Services Inc. (signed and sealed) “Dominic Lussier” Date: <u>March 12, 2026</u> Dominic Lussier, P. Geo. Chief Geologist G Mining Services Inc. (signed and sealed) “Carl Michaud” Date: <u>March 12, 2026</u> Carl Michaud, P. Eng., MBA VP, Technical Services G Mining Services Inc. (signed and sealed) “Charles Taschereau” Date: <u>March 12, 2026</u> Charles Taschereau, P. Eng., CPA, MBA VP Metallurgy, Process, Commissioning and Operation G Mining Services Inc. <u>(signed and sealed) “Nicolas Vanier-Larrivée”</u> Date: <u>March 12, 2026</u> Nicolas Vanier-Larrivée, P. Eng. Earthworks and Study Manager G Mining Services Inc. --- Prepared by: <u>(signed and sealed) “Simon Shankie”</u> Simon Shankie, M. SC., P. Geo. Date: <u>March 12, 2026</u> Vice President Environmental Services CSL Environmental & Geotechnical Ltd. --- ## <u>Table of Contents</u> [Image: X7]**SUMMARY.......................................................................................................... 1-1** 1.1 Introduction............................................................................................................. 1-1 1.2 Terms of Reference................................................................................................ 1-2 1.3 Reliance on Other Experts...................................................................................... 1-2 1.4 Property Description and Location.......................................................................... 1-3 1.5 Accessibility, Climate, Local Resources, Infrastructure & Physiography................ 1-3 1.6 History..................................................................................................................... 1-4 1.7 Geological Setting and Mineralization..................................................................... 1-4 1.7.1 Geological Setting.................................................................................................... 1-4 1.7.2 Mineralization........................................................................................................... 1-5 1.8 Deposit Types......................................................................................................... 1-5 1.9 Exploration.............................................................................................................. 1-6 1.10 Drilling .................................................................................................................... 1-6 1.11 Sampling Preparation, Analysis and Security......................................................... 1-6 1.12 Data Verification...................................................................................................... 1-6 1.13 Mineral Processing and Metallurgical Testing ........................................................ 1-7 1.14 Mineral Resource Estimate..................................................................................... 1-9 1.15 Mineral Reserve Estimate..................................................................................... 1-12 1.16 Mining Methods..................................................................................................... 1-12 1.17 Recovery Methods................................................................................................ 1-14 1.18 Project Infrastructure............................................................................................. 1-15 1.19 Market Study and Contract................................................................................... 1-16 1.20 Environmental Studies, Permitting and Social or Community Impact................... 1-17 1.21 Capital and Operating Costs:................................................................................ 1-18 1.22 Economic Analysis................................................................................................ 1-19 1.23 Adjacent Properties............................................................................................... 1-24 1.24 Other Relevant Data and Information................................................................... 1-24 1.25 Interpretation and Conclusion............................................................................... 1-25 1.26 Recommendations................................................................................................ 1-25 [Image: X8]**INTRODUCTION................................................................................................. 2-1** 2.1 Scope of Work........................................................................................................ 2-2 2.2 Site Visits................................................................................................................ 2-3 --- 2.3 Effective Date.......................................................................................................... 2-3 2.4 Previous Technical Reports.................................................................................... 2-4 2.5 Sources of Information............................................................................................ 2-4 2.6 Agreements, Mineral Tenure, Surface Rights and Royalties.................................. 2-5 2.7 Use of Non-GAAP Financial Measures................................................................... 2-5 2.8 Units of Measure, Abbreviations and Nomenclature............................................... 2-5 [Image: X10]**RELIANCE ON OTHER EXPERTS..................................................................... 3-1** 3.1 Introduction............................................................................................................. 3-1 3.2 Taxation.................................................................................................................. 3-1 3.3 Mineral Tenure and Surface Rights........................................................................ 3-1 3.4 Conclusion.............................................................................................................. 3-2 [Image: X11]**PROPERTY DESCRIPTION AND LOCATION................................................... 4-3** 4.1 Location.................................................................................................................. 4-3 4.2 Property Description............................................................................................... 4-5 4.3 Rights and Obligations Associated with Mining Titles........................................... 4-13 4.3.1 Claims.................................................................................................................... 4-13 4.3.2 Other Tenure ......................................................................................................... 4-14 4.4 Property Ownership and Agreements................................................................... 4-15 4.4.1 Earn in Agreements............................................................................................... 4-15 4.4.2 Royalty Agreements.............................................................................................. 4-15 4.5 Required Exploration Permits............................................................................... 4-27 4.5.1 Water Permits and Liabilities................................................................................. 4-27 4.5.2 Road Permit........................................................................................................... 4-28 4.5.3 Exploration Permits................................................................................................ 4-28 4.6 Environmental Liabilities....................................................................................... 4-31 **ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND** [Image: X12] **PHYSIOGRAPHY................................................................................................ 5-1** 5.1 Accessibility............................................................................................................ 5-1 5.2 Physiography.......................................................................................................... 5-1 5.3 Climate, Vegetation & Wildlife................................................................................. 5-1 5.4 Local Resources & Infrastructure............................................................................ 5-2 5.4.1 Airports, Rail Terminals, & Bus Services................................................................. 5-2 5.4.2 Local Labour & Support Services............................................................................ 5-3 5.4.3 Power & Water......................................................................................................... 5-3 5.4.4 Other Infrastructure.................................................................................................. 5-3 5.5 Community.............................................................................................................. 5-4 [Image: X13]**HISTORY............................................................................................................. 6-1** --- 6. [Excerpt trimmed for readability. Open the original source for the complete filing or document.]