Table 1-3: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social Baseline Studies 500 Additional Resource and HQ Metallurgical Diamond Drilling 10,000 Metallurgical Testing / Pilot Plan Test Program 1,000 Preliminary Feasibility Study 500 Phase II Total 12,000 1.2 Technical Summary The Project is located in the central portion of the Eas

Briefing

Table 1-3: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social Baseline Studies 500 Additional Resource and HQ Metallurgical Diamond Drilling 10,000 Metallurgical Testing / Pilot Plan Test Program 1,000 Preliminary Feasibility Study 500 Phase II Total 12,000 1.2 Technical Summary The Project is located in the central portion of the Eas Key points: Table 1-3: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social Baseline Studies 500 Additional Resource and HQ Metallurgical Diamond Dril; Table 26-2: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social Baseline Studies 500 Additional Resource and HQ Metallurgical Diamond Dri; Of the 1,094 sample ID matches between the certificates and the Mineral Resource database (100% matches), eight certificate samples with grade were set to 1 g/t Au in the database: a result of capping gold grade in mater; Taken in context with the general result of the variography, SLR classified Indicated Mineral Resources as blocks with less than 300 m to the nearest drill hole, with an average distance of less than 600 m for the holes; Updated material classification (Figure 14-11) with the 2021 drill results using the same 1.43 g/t PdEq and 2.0 m minimum thickness criteria results in large scale conversion of Inferred Mineral Resource to Indicated Min; A Mineral Reserve is defined as the “economically mineable part of a Measured and/or Indicated Mineral Resource” demonstrated by studies at Pre-Feasibility or Feasibility level as appropriate. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.

Source Notes

Table 1-3: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social...

Extractive summary evidence · source

Table 26-2: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social...

Extractive summary evidence 2 · source

Of the 1,094 sample ID matches between the certificates and the Mineral Resource database (100% matches), eight certificate samples with grade were...

Extractive summary evidence 3 · source

Taken in context with the general result of the variography, SLR classified Indicated Mineral Resources as blocks with less than 300 m...

Extractive summary evidence 4 · source

Extracted Document Text

This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.

# NI 43-101

Source: https://ir.greenlandmines.com/assets/uploads/2026/03/2022_NI-43-1011.pdf
Fetched: 2026-09-30T01:09:09.53+00:00
Source artifact: 13c86e40-47eb-4db1-816d-0685f45fd906
Normalizer input: text

## Content

# NI 43-101
NI 43-101
Independent
Technical Report
Effective Date:
November 22, 2022
PROJECT PREPARED BY
Skaergaard SLR Consulting (Canada) Ltd.
Project Qualified Person:
Philip A. Geusebroek M.Sc., P.Geo.
Southeastern
Greenland
Technical Report on the
Skaergaard Project, Southeastern
Greenland
Report for NI 43-101
Major Precious Metals Corp.
SLR Project No: 233.03636.R0000
Effective Date:
November 22, 2022
Signature Date:
November 30, 2022
Prepared by:
SLR Consulting (Canada) Ltd.
Qualified Person:
Philip A. Geusebroek, M.Sc., P.Geo.
Technical Report on the Skaergaard Project, Southeastern Greenland
SLR Project No: 233.03636.R0000
Prepared by
SLR Consulting (Canada) Ltd.
55 University Ave., Suite 501
Toronto, ON M5J 2H7
for
Major Precious Metals Corp.
789 West Pender St., Suite 810
Vancouver, BC V6C 1H2
Canada
Effective Date – November 22, 2022
Signature Date - November 30, 2022
Prepared by: Approved by:
Philip A. Geusebroek, M.Sc., P.Geo.
Project Manager
Peer Reviewed by: Alastair Middleton, M.Sc., FGS
Luke Evans, M.Sc., P.Eng.
David Robson, P.Eng., MBA Project Director
Deborah A. McCombe, P. Geo.
FINAL
Distribution: 1 copy – Major Precious Metals Corp.
1 copy – SLR Consulting (Canada) Ltd.
CONTENTS
1.0 SUMMARY ..........................................................................................................................1-1
1.1 Executive Summary....................................................................................................................... 1-1
1.2 Technical Summary ..................................................................................................................... 1-10
2.0 INTRODUCTION ..................................................................................................................2-1
2.1 Sources of Information ................................................................................................................. 2-1
2.2 List of Abbreviations ..................................................................................................................... 2-2
3.0 RELIANCE ON OTHER EXPERTS .............................................................................................3-1
4.0 PROPERTY DESCRIPTION AND LOCATION .............................................................................4-1
4.1 Location......................................................................................................................................... 4-1
4.2 Exploration in Greenland .............................................................................................................. 4-1
4.3 Land Tenure .................................................................................................................................. 4-2
4.4 Surface Rights ............................................................................................................................... 4-9
4.5 Encumbrances............................................................................................................................... 4-9
4.6 Royalties ........................................................................................................................................ 4-9
4.7 Environmental, Social and Permitting Considerations ................................................................. 4-9
4.8 Permits and Environmental Liabilities ........................................................................................ 4-10
5.0 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY ......... 5-1
5.1 Accessibility ................................................................................................................................... 5-1
5.2 Climate .......................................................................................................................................... 5-1
5.3 Local Resources ............................................................................................................................. 5-3
5.4 Infrastructure ................................................................................................................................ 5-3
5.5 Physiography ................................................................................................................................. 5-4
6.0 HISTORY .............................................................................................................................6-1
6.1 Prior Ownership and Exploration History ..................................................................................... 6-1
6.2 Exploration History ....................................................................................................................... 6-3
6.3 Historical Resource Estimates ....................................................................................................... 6-3
6.4 Past Production ............................................................................................................................. 6-4
7.0 GEOLOGICAL SETTING AND MINERALIZATION ......................................................................7-1
7.1 Summary ....................................................................................................................................... 7-1
7.2 Regional Geology .......................................................................................................................... 7-1
7.3 Local Geology ................................................................................................................................ 7-3
7.4 Property Geology .......................................................................................................................... 7-6
7.5 Mineralization ............................................................................................................................... 7-8
8.0 DEPOSIT TYPES ...................................................................................................................8-1
Major Precious Metals Corp. | Skaergaard Project , SLR Project No: 233.03636.R0000
NI 43-101 Technical Report - November 30, 2022 i
9.0 EXPLORATION .....................................................................................................................9-1
9.1 Exploration Potential .................................................................................................................... 9-1
10.0 DRILLING .......................................................................................................................... 10-1
10.1 Survey Grids and Digital Terrain Maps........................................................................................ 10-1
10.2 Historical Drilling ......................................................................................................................... 10-3
10.3 Current Drilling.......................................................................................................................... 10-19
10.4 QP Comments ........................................................................................................................... 10-29
11.0 SAMPLE PREPARATION, ANALYSES, AND SECURITY ............................................................ 11-1
11.1 Historical Sample Preparation and Analysis ............................................................................... 11-1
11.2 Current Sample Preparation and Analysis ................................................................................ 11-11
11.3 QP Comments ........................................................................................................................... 11-19
12.0 DATA VERIFICATION.......................................................................................................... 12-1
12.1 Historical Verification.................................................................................................................. 12-1
12.2 Current Verification .................................................................................................................... 12-7
12.3 QP Comments ........................................................................................................................... 12-16
13.0 MINERAL PROCESSING AND METALLURGICAL TESTING ...................................................... 13-1
14.0 MINERAL RESOURCE ESTIMATE ......................................................................................... 14-1
14.1 Summary ..................................................................................................................................... 14-1
14.2 Resource Database ..................................................................................................................... 14-3
14.3 Geological Interpretation............................................................................................................ 14-7
14.4 Resource Assays ........................................................................................................................ 14-13
14.5 Treatment of High Grade Assays .............................................................................................. 14-13
14.6 Compositing .............................................................................................................................. 14-14
14.7 Variography............................................................................................................................... 14-14
14.8 Search Strategy and Grade Interpolation Parameters.............................................................. 14-16
14.9 Bulk Density .............................................................................................................................. 14-16
14.10 Block Model .............................................................................................................................. 14-18
14.11 Cut-off Grade and Metal Equivalent Calculation ...................................................................... 14-18
14.12 Classification ............................................................................................................................. 14-19
14.13 Block Model Validation ............................................................................................................. 14-22
14.14 Mineral Resource Reporting ..................................................................................................... 14-24
15.0 MINERAL RESERVE ESTIMATE ............................................................................................ 15-1
16.0 MINING METHODS ............................................................................................................ 16-1
17.0 RECOVERY METHODS ........................................................................................................ 17-1
18.0 PROJECT INFRASTRUCTURE ............................................................................................... 18-1
Major Precious Metals Corp. | Skaergaard Project , SLR Project No: 233.03636.R0000
NI 43-101 Technical Report - November 30, 2022 ii
19.0 MARKET STUDIES AND CONTRACTS ................................................................................... 19-1
20.0 ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT............... 20-1
21.0 CAPITAL AND OPERATING COSTS....................................................................................... 21-1
22.0 ECONOMIC ANALYSIS ........................................................................................................ 22-1
23.0 ADJACENT PROPERTIES ..............................................................

[Excerpt trimmed for readability. Open the original source for the complete filing or document.]