Briefing
Table 1-3: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social Baseline Studies 500 Additional Resource and HQ Metallurgical Diamond Drilling 10,000 Metallurgical Testing / Pilot Plan Test Program 1,000 Preliminary Feasibility Study 500 Phase II Total 12,000 1.2 Technical Summary The Project is located in the central portion of the Eas Key points: Table 1-3: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social Baseline Studies 500 Additional Resource and HQ Metallurgical Diamond Dril; Table 26-2: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social Baseline Studies 500 Additional Resource and HQ Metallurgical Diamond Dri; Of the 1,094 sample ID matches between the certificates and the Mineral Resource database (100% matches), eight certificate samples with grade were set to 1 g/t Au in the database: a result of capping gold grade in mater; Taken in context with the general result of the variography, SLR classified Indicated Mineral Resources as blocks with less than 300 m to the nearest drill hole, with an average distance of less than 600 m for the holes; Updated material classification (Figure 14-11) with the 2021 drill results using the same 1.43 g/t PdEq and 2.0 m minimum thickness criteria results in large scale conversion of Inferred Mineral Resource to Indicated Min; A Mineral Reserve is defined as the “economically mineable part of a Measured and/or Indicated Mineral Resource” demonstrated by studies at Pre-Feasibility or Feasibility level as appropriate. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.
Source Notes
Table 1-3: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social...
Extractive summary evidence · source
Table 26-2: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social...
Extractive summary evidence 2 · source
Of the 1,094 sample ID matches between the certificates and the Mineral Resource database (100% matches), eight certificate samples with grade were...
Extractive summary evidence 3 · source
Taken in context with the general result of the variography, SLR classified Indicated Mineral Resources as blocks with less than 300 m...
Extractive summary evidence 4 · source
Extracted Document Text
This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.
# NI 43-101 Source: https://ir.greenlandmines.com/assets/uploads/2026/03/2022_NI-43-1011.pdf Fetched: 2026-09-30T01:09:09.53+00:00 Source artifact: 13c86e40-47eb-4db1-816d-0685f45fd906 Normalizer input: text ## Content # NI 43-101 NI 43-101 Independent Technical Report Effective Date: November 22, 2022 PROJECT PREPARED BY Skaergaard SLR Consulting (Canada) Ltd. Project Qualified Person: Philip A. Geusebroek M.Sc., P.Geo. Southeastern Greenland Technical Report on the Skaergaard Project, Southeastern Greenland Report for NI 43-101 Major Precious Metals Corp. SLR Project No: 233.03636.R0000 Effective Date: November 22, 2022 Signature Date: November 30, 2022 Prepared by: SLR Consulting (Canada) Ltd. Qualified Person: Philip A. Geusebroek, M.Sc., P.Geo. Technical Report on the Skaergaard Project, Southeastern Greenland SLR Project No: 233.03636.R0000 Prepared by SLR Consulting (Canada) Ltd. 55 University Ave., Suite 501 Toronto, ON M5J 2H7 for Major Precious Metals Corp. 789 West Pender St., Suite 810 Vancouver, BC V6C 1H2 Canada Effective Date – November 22, 2022 Signature Date - November 30, 2022 Prepared by: Approved by: Philip A. Geusebroek, M.Sc., P.Geo. Project Manager Peer Reviewed by: Alastair Middleton, M.Sc., FGS Luke Evans, M.Sc., P.Eng. David Robson, P.Eng., MBA Project Director Deborah A. McCombe, P. Geo. FINAL Distribution: 1 copy – Major Precious Metals Corp. 1 copy – SLR Consulting (Canada) Ltd. CONTENTS 1.0 SUMMARY ..........................................................................................................................1-1 1.1 Executive Summary....................................................................................................................... 1-1 1.2 Technical Summary ..................................................................................................................... 1-10 2.0 INTRODUCTION ..................................................................................................................2-1 2.1 Sources of Information ................................................................................................................. 2-1 2.2 List of Abbreviations ..................................................................................................................... 2-2 3.0 RELIANCE ON OTHER EXPERTS .............................................................................................3-1 4.0 PROPERTY DESCRIPTION AND LOCATION .............................................................................4-1 4.1 Location......................................................................................................................................... 4-1 4.2 Exploration in Greenland .............................................................................................................. 4-1 4.3 Land Tenure .................................................................................................................................. 4-2 4.4 Surface Rights ............................................................................................................................... 4-9 4.5 Encumbrances............................................................................................................................... 4-9 4.6 Royalties ........................................................................................................................................ 4-9 4.7 Environmental, Social and Permitting Considerations ................................................................. 4-9 4.8 Permits and Environmental Liabilities ........................................................................................ 4-10 5.0 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY ......... 5-1 5.1 Accessibility ................................................................................................................................... 5-1 5.2 Climate .......................................................................................................................................... 5-1 5.3 Local Resources ............................................................................................................................. 5-3 5.4 Infrastructure ................................................................................................................................ 5-3 5.5 Physiography ................................................................................................................................. 5-4 6.0 HISTORY .............................................................................................................................6-1 6.1 Prior Ownership and Exploration History ..................................................................................... 6-1 6.2 Exploration History ....................................................................................................................... 6-3 6.3 Historical Resource Estimates ....................................................................................................... 6-3 6.4 Past Production ............................................................................................................................. 6-4 7.0 GEOLOGICAL SETTING AND MINERALIZATION ......................................................................7-1 7.1 Summary ....................................................................................................................................... 7-1 7.2 Regional Geology .......................................................................................................................... 7-1 7.3 Local Geology ................................................................................................................................ 7-3 7.4 Property Geology .......................................................................................................................... 7-6 7.5 Mineralization ............................................................................................................................... 7-8 8.0 DEPOSIT TYPES ...................................................................................................................8-1 Major Precious Metals Corp. | Skaergaard Project , SLR Project No: 233.03636.R0000 NI 43-101 Technical Report - November 30, 2022 i 9.0 EXPLORATION .....................................................................................................................9-1 9.1 Exploration Potential .................................................................................................................... 9-1 10.0 DRILLING .......................................................................................................................... 10-1 10.1 Survey Grids and Digital Terrain Maps........................................................................................ 10-1 10.2 Historical Drilling ......................................................................................................................... 10-3 10.3 Current Drilling.......................................................................................................................... 10-19 10.4 QP Comments ........................................................................................................................... 10-29 11.0 SAMPLE PREPARATION, ANALYSES, AND SECURITY ............................................................ 11-1 11.1 Historical Sample Preparation and Analysis ............................................................................... 11-1 11.2 Current Sample Preparation and Analysis ................................................................................ 11-11 11.3 QP Comments ........................................................................................................................... 11-19 12.0 DATA VERIFICATION.......................................................................................................... 12-1 12.1 Historical Verification.................................................................................................................. 12-1 12.2 Current Verification .................................................................................................................... 12-7 12.3 QP Comments ........................................................................................................................... 12-16 13.0 MINERAL PROCESSING AND METALLURGICAL TESTING ...................................................... 13-1 14.0 MINERAL RESOURCE ESTIMATE ......................................................................................... 14-1 14.1 Summary ..................................................................................................................................... 14-1 14.2 Resource Database ..................................................................................................................... 14-3 14.3 Geological Interpretation............................................................................................................ 14-7 14.4 Resource Assays ........................................................................................................................ 14-13 14.5 Treatment of High Grade Assays .............................................................................................. 14-13 14.6 Compositing .............................................................................................................................. 14-14 14.7 Variography............................................................................................................................... 14-14 14.8 Search Strategy and Grade Interpolation Parameters.............................................................. 14-16 14.9 Bulk Density .............................................................................................................................. 14-16 14.10 Block Model .............................................................................................................................. 14-18 14.11 Cut-off Grade and Metal Equivalent Calculation ...................................................................... 14-18 14.12 Classification ............................................................................................................................. 14-19 14.13 Block Model Validation ............................................................................................................. 14-22 14.14 Mineral Resource Reporting ..................................................................................................... 14-24 15.0 MINERAL RESERVE ESTIMATE ............................................................................................ 15-1 16.0 MINING METHODS ............................................................................................................ 16-1 17.0 RECOVERY METHODS ........................................................................................................ 17-1 18.0 PROJECT INFRASTRUCTURE ............................................................................................... 18-1 Major Precious Metals Corp. | Skaergaard Project , SLR Project No: 233.03636.R0000 NI 43-101 Technical Report - November 30, 2022 ii 19.0 MARKET STUDIES AND CONTRACTS ................................................................................... 19-1 20.0 ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT............... 20-1 21.0 CAPITAL AND OPERATING COSTS....................................................................................... 21-1 22.0 ECONOMIC ANALYSIS ........................................................................................................ 22-1 23.0 ADJACENT PROPERTIES .............................................................. [Excerpt trimmed for readability. Open the original source for the complete filing or document.]
