Briefing
Nueva Esperanza – Heap Leach DFS delivers robust results Resources 93.3Moz Silver Eq / 1.6Moz Gold Eq Throughput 3,000,000 tonnes per annum Initial mine life +6 years Annualised production (post ramp up) Silver 6,430,000oz Gold 17,500 oz Initial capital cost (incl. Key points: Nueva Esperanza – Heap Leach DFS delivers robust results Resources 93.3Moz Silver Eq / 1.6Moz Gold Eq Throughput 3,000,000 tonnes per annum Initial mine life +6 years Annualised production (post ramp up) Silver 6,430,000; Mar 13A Jun 14A Sep 13A Dec 13A Mar 14A Initiatives to address low excavator availability being undertaken in Gold Production Total Cash Cost concert with our mining contractor Strong June quarter expected Challenger; US$10M contingency) US$140 million Average metallurgical recovery Silver (ave across three ore bodies) 70% Gold (Arqueros and Chimberos) 75% Average strip ratio 5.1:1 Ave. operating cost (after royalties gold credits) US; Chatree Gold production 31,609oz Chatree Quarterly Gold Production and Costs 1,556Kt @ 0.81g/t & 77.7% Ounces US$/Oz (1,487Kt @ 0.93g/t & 80.3%) 50,000 1,000 Total cash costs US$805 40,000 (incl.US$102/oz royalty); Retail component of A$30.9M (gross) completed in April. • Nueva Esperanza definitive feasibility study completed and confirms robust project economics. • CEO search well advanced; All-in Sustaining Cost Chatree Challenger Group Gold Sales oz 30,813 17,403 48,216 Adjusted Total Cash Costs US$/oz 731 1,297* 951 (incl royalties and bi-product) Sustaining Capex US$/oz 165 58 127 Exploration Expense US. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.
Source Notes
Nueva Esperanza – Heap Leach DFS delivers robust results Resources 93.3Moz Silver Eq / 1.6Moz Gold Eq Throughput 3,000,000 tonnes per annum...
Extractive summary evidence · source
Mar 13A Jun 14A Sep 13A Dec 13A Mar 14A Initiatives to address low excavator availability being undertaken in Gold Production...
Extractive summary evidence 2 · source
US$10M contingency) US$140 million Average metallurgical recovery Silver (ave across three ore bodies) 70% Gold (Arqueros and Chimberos) 75% Average strip ratio...
Extractive summary evidence 3 · source
Chatree Gold production 31,609oz Chatree Quarterly Gold Production and Costs 1,556Kt @ 0.81g/t & 77.7% Ounces US$/Oz (1,487Kt @ 0.93g/t...
Extractive summary evidence 4 · source
Extracted Document Text
This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.
# March 2014 Quarterly Report Presentation Source: https://www.kingsgate.com.au/wp-content/uploads/2024/07/2014-04-29-KCN-March-Quarter-2014-Presentation-Final.pdf Published: 2014-03-31T00:00:00+00:00 Fetched: 2026-05-12T15:19:53.667+00:00 Source artifact: bffc1ad2-7834-4263-93a1-6393137856bc Normalizer input: text ## Content # March 2014 Quarterly Report Presentation Kingsgate Consolidated Limited March 2014 Quarterly Report Disclaimer Forward Looking Statements: These materials include forward looking statements. Forward looking statements inherently involve subjective judgment & analysis & are subject to significant uncertainties, risks & contingencies, many of which are outside of the control of, & may be unknown to, the company. Actual results and developments may vary materially from that expressed in these materials. The types of uncertainties which are relevant to the company may include, but are not limited to, commodity prices, political uncertainty, changes to the regulatory framework which applies to the business of the company & general economic conditions. Given these uncertainties, readers are cautioned not to place undue reliance on such forward looking statements. Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, the company undertakes any obligation to publicly update or revise any of the forward looking statements, changes in events, conditions or circumstances on which any such statement is based. Some statements in this presentation regarding estimates or future events are forward looking statements. They involve risk and uncertainties that could cause actual results to differ from estimated results. Forward looking statements include estimates of future production, cash and total costs per ounce of production, reserve and mineralized material estimates, capital costs, and other estimates or prediction of future activities. They include statements proceeded by words such as “believe,” “estimate,” “expect,” “intend,” “will,” and similar expressions. Actual results could differ materially depending on such things as political events, labour relations, currency fluctuations and other general economic conditions, market prices for Kingsgate Consolidated Limited products, timing of permits and other government approvals and requirements, changes in operating conditions, lower than expected ore grades, unexpected ground and mining conditions, availability and cost of materials and equipment, and risks generally inherent in the ownership and operation of mining properties and investment in foreign countries. March Quarter - Highlights • Solid Group operating performance with quarterly gold production in line with expectations at 48,725oz • Strong June Quarter expected to deliver full year guidance • Chatree produced 31,609oz of gold at US$805/oz and Challenger produced 17,116oz at US$1,293. • Balance sheet strengthened following capital raising. Institutional component of A28.5M (gross) completed in quarter. Retail component of A$30.9M (gross) completed in April. • Nueva Esperanza definitive feasibility study completed and confirms robust project economics. • CEO search well advanced. All-in Sustaining Cost Chatree Challenger Group Gold Sales oz 30,813 17,403 48,216 Adjusted Total Cash Costs US$/oz 731 1,297* 951 (incl royalties and bi-product) Sustaining Capex US$/oz 165 58 127 Exploration Expense US$/oz - - - Corporate and Admin Costs^ US$/oz - - 48 All-in Sustaining Cost (March Qtr) US$/oz 923 1,355 1,126 * Includes underground mine development. ^ Corporate and Admin costs have been allocated 73% : 27 % between operating assets and development projects. Chatree Gold production 31,609oz Chatree Quarterly Gold Production and Costs 1,556Kt @ 0.81g/t & 77.7% Ounces US$/Oz (1,487Kt @ 0.93g/t & 80.3%) 50,000 1,000 Total cash costs US$805 40,000 (incl.US$102/oz royalty) 750 Grade reflects current mix of A Pit 30,000 ore and stockpiled ore. 500 Recovery reflects lower grade ore 20,000 and met. characteristics of current 250 ore blend 10,000 Mining of waste impacted by low 0 0 excavator availability. Mar 13A Jun 14A Sep 13A Dec 13A Mar 14A Initiatives to address low excavator availability being undertaken in Gold Production Total Cash Cost concert with our mining contractor Strong June quarter expected Challenger Gold production 17,116oz Challenger Quarterly Gold Production and "All-In" Costs 110Kt @ 5.05g/t & 96.1% (141Kt @ 4.64g/t & 95.9%) Ounces US$/Oz Lower available stope and 25,000 2,500 development ore Lower dilution delivering higher 20,000 2,000 grade 15,000 1,500 Recovery reflects higher grade Total operating costs US$1,293 10,000 1,000 (incl.US$49/oz royalty) Unit costs reflect lower 5,000 500 production Costs include mine development 0 0 expenditure Mar 13A Jun 13A Sep 13A Dec 13A Mar 14A Full year guidance maintained Gold Production Opex + Mine Development at 70,000oz to 80,000oz. Nueva Esperanza – Heap Leach DFS delivers robust results Resources 93.3Moz Silver Eq / 1.6Moz Gold Eq Throughput 3,000,000 tonnes per annum Initial mine life +6 years Annualised production (post ramp up) Silver 6,430,000oz Gold 17,500 oz Initial capital cost (incl. US$10M contingency) US$140 million Average metallurgical recovery Silver (ave across three ore bodies) 70% Gold (Arqueros and Chimberos) 75% Average strip ratio 5.1:1 Ave. operating cost (after royalties gold credits) US$11.44/oz AgEq Ave. operating cost (after royalties silver credits) US$687oz AuEq Assumptions: Silver US$20/oz Gold US$1,300/oz A$/US$ 0.90 Nueva Esperanza Development schedule Development DFS completed with positive results Addendum (DIA) to approved EIA lodged Schedule DIA approval expected within 6 months Order long lead items Current Work Vaue engineering of capital and operating Program costs Limited twin hole drilling at Arqueros Detailed design and EPCM considerations Project funding planned from various sources Financing Project debt or mezzanine finance Operating cashflow Introduction of strategic or minority partners Strategic initiatives (eg Akara IPO) Bowdens Project timing to reflect market conditions Major elements of the DFS largely completed. Feasibility Study Sterilisation drilling confirms no mineralisation under proposed plant site Environmental Monitoring Plan in preparation. Environmental On-going recording of field Impact Statement environmental aspects EIS work anticipated to be completed in 2014 Capital Raising Sources ($M) Uses ($M) Institutional Placement 14.7 Repay corporate debt 19.0 Institutional Entitlement Nueva Esperanza Pre- 13.8 5.0 Offer development capex Retail Entitlement Offer 30.9 Bowdens DFS and EIS capex 4.0 Working capital / general 11.2 corporate purposes Gross Proceeds 59.4 Sub Total 39.2 Development Capex, in particular 20.2 Nueva Esperanza Total 59.4 Outlook • Group gold production for the fiscal year FY2014 is expected to be 190,000 to 210,000 ounces gold. • Chatree production expected to be 120,000 to 130,000 ounces. • Challenger production expected to be 70,000 to 80,000 ounces. • Nueva Esperanza project work to continue. • Bowdens EIS and DFS work aligned for completion in 2014. • Focus remains on strategies to lower costs and maximise shareholder returns. Kingsgate Consolidated Limited Shares: 217 Million Market Cap: ~A$217 Million ASX: KCN www.kingsgate.com.au Appendix General Disclaimer: The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue securities or other financial products. The information contained in this presentation is not investment or financial product advice and has been prepared without taking into account the investment objectives, financial situation or particular needs of any person. To the maximum extent permitted by law, none of Kingsgate Consolidated Limited, its directors, employees or agents, nor any other person accepts any liability including without limitation any liability arising out of fault or negligence for any loss caused from the use of the information contained in this presentation. No representation or warranty, express or implied, is given as to the accuracy, completeness or correctness, likelihood of achievement or reasonableness of any forecasts or other forward looking statements. Competent Persons Statements: In this report, information concerning Thailand operations relates to Exploration Results, Mineral Resources and Ore Reserve estimates is based on and fairly represents information compiled by the following Competent Persons: Ron James, Brendan Bradley Kevin Woodward and Suphanit Suphananthi who are employees of the Kingsgate Group. All except Brendan Bradley are members of The Australasian Institute of Mining and Metallurgy; Brendan Bradley is a member of the Australian Institute of Geoscientists. These people qualify as Competent Persons as defined in the Australasian code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code, 2012 edition) and possess relevant experience in relation to the mineralisation of being reported herein as Exploration Results, Mineral resources and Ore reserves. Each Competent Person has consented to the Public reporting of these statements and the inclusion of the material in the form and context in which it appears. In this report, the information concerning Challenger operations that relates to Exploration Results, Mineral Resources and Ore Reserves estimates is based on and fairly represents information compiled by Stuart Hampton and Luke Phelps who are full-time employees of the Kingsgate Group. Both are members of The Australasian Institute of Mining and Metallurgy. These persons have sufficient experience that is relevant to the mineralisation and type of deposit under consideration and to the activity that they are undertaking to qualify as Competent Persons as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Paul Androvic and Tim Benfield consent to the inclusion in the report of the matters based on their information in the form in which it appears. The information in this report that relates to Bowdens and Nueva Esperanza Mineral Resource estimation is based on and fairly represents work completed by Jonathon Abbott who is a full-time employee of MPR Geological Consultants and a member of the Australian Institute of Geoscientists and Mr Ron James. Mr Abbott and Mr James have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Abbott and Mr James consent to the inclusion in the report of the matters based on his information in the form and context in which it appears. www.kingsgate.com.au Chatree Chatree Ore Reserves as at 30 April 2013 (>0.35g/t gold cut-off grade) Gold Silver Gold Silver Tonnes Grade Grade Contained Contained AuEq Source Category (million) (g/t) (g/t) (Moz) (Moz) (Moz) From Pits Proven 45.4 0.87 7.8 1.27 11.39 Probable 14.8 0.78 6.0 0.37 2.86 Stockpiles 9.3 0.58 9.3 0.17 2.78 Chatree Total Total 69.5 0.81 7.6 1.82 17.04 Chatree Mineral Resources as at 30 April 2013 (>0.3g/t gold cut-off grade) Tonnes Gold Silver Gold Silver AuEq Source Category Grade Grade Contained Contained (million) (g/t) (g/t) (Moz) (Moz) (Moz) From Pits Measured 92.8 0.72 6.60 2.15 19.7 Indicated 49.8 0.64 4.69 1.02 7.51 Inferred 45.7 0.58 3.81 0.85 5.60 Chatree Total Total 188.3 0.66 5.42 4.03 32.8 Competent Persons Statement. Information in this presentation relates to Exploration Results, Mineral Resou [Excerpt trimmed for readability. Open the original source for the complete filing or document.]