Briefing
The IPD is consistent with the description mapped out in St Barbara’s announcement of January 21, 2026, which outlined the results of the Pre-Feasibility Study for the 15-Mile Processing Hub Project, with an operational mine life of more than 11 years (based solely on Proven and Probable Ore Reserves) and a processing rate of three million tonnes per annum producing an average of just over 100,000 ounces of gold per Key points: The IPD is consistent with the description mapped out in St Barbara’s announcement of January 21, 2026, which outlined the results of the Pre-Feasibility Study for the 15-Mile Processing Hub Project, with an operational; On May 19, 2026, GR Silver reported its best ever drill results at San Marcial of 45.1 m true width at 1,623 g/t Ag including 18.85 m at 3,846 g/t Ag, and including 8.25 m at 8,579 g/t Ag; La Parrilla On August 6, 2026, Silver Storm released infill diamond-drill results from the Rosarios Zone at its 100%- owned La Parrilla silver mine complex, where the top three intercepts were hole IDP-RO-26-007 at 200 g; G Mining also stated that it remains on track to achieve its 2026 production guidance of 160–190 koz of gold with production expected to be weighted towards the second half of the year as higher-grade phase 2 mineralizat; Wharf On August 5, 2026, Coeur Mining, Inc. (“Coeur”) reported second quarter gold production of 18.1 koz at Wharf, an increase of 85% quarter over quarter; Coeur reiterated its previous guidance for 2026 of 72-90 koz gold production and $10-$12 million on exploration expenses. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.
Source Notes
The IPD is consistent with the description mapped out in St Barbara’s announcement of January 21, 2026, which outlined the results of...
Extractive summary evidence · source
On May 19, 2026, GR Silver reported its best ever drill results at San Marcial of 45.1 m true width at 1,623...
Extractive summary evidence 2 · source
La Parrilla On August 6, 2026, Silver Storm released infill diamond-drill results from the Rosarios Zone at its 100%- owned La Parrilla...
Extractive summary evidence 3 · source
G Mining also stated that it remains on track to achieve its 2026 production guidance of 160–190 koz of gold with production...
Extractive summary evidence 4 · source
Extracted Document Text
This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.
# AUGUST 13, 2026 PRESS RELEASE Metalla Reports Record Financial Results for the Second Quarter of 2026 and Provides Asset Updates Aranzazu Source: https://www.metallaroyalty.com/press-releases/MTA_NR_Q2_2026_Results-FINAL.pdf Fetched: 2026-09-16T01:06:19.77+00:00 Source artifact: ac377281-aab7-4725-98b7-42c2cb42db85 Normalizer input: text ## Content # AUGUST 13, 2026 PRESS RELEASE Metalla Reports Record Financial Results for the Second Quarter of 2026 and Provides Asset Updates Aranzazu METALLA REPORTS RECORD FINANCIAL RESULTS FOR THE SECOND QUARTER OF 2026 AND PROVIDES ASSET UPDATES (All dollar amounts are in thousands of United States dollars unless otherwise indicated, except for shares, per ounce, and per share amounts) FOR IMMEDIATE RELEASE TSXV: MTA NYSE American: MTA August 13, 2026 Vancouver, Canada: Metalla Royalty & Streaming Ltd. (“Metalla” or the “Company”) (TSXV: MTA) (NYSE American: MTA) announces its operating and financial results for the three and six months ended June 30, 2026. For complete details of the condensed interim consolidated financial statements and accompanying management's discussion and analysis for the three and six months ended June 30, 2026, please see the Company's filings on SEDAR+ (www.sedarplus.ca) or EDGAR (www.sec.gov). Shareholders are encouraged to visit the Company's website at www.metallaroyalty.com. “Our second quarter reflected the continued growth of Metalla’s portfolio, with record revenue of $5.2 million and Adjusted EBITDA of $3.9 million, driven by increasing contributions from our producing assets,” said Brett Heath, CEO of Metalla. “A key milestone during the quarter was first production from Agnico’s Amalgamated Kirkland project, adding further cashflow from our portfolio and further strengthening and diversifying our near-term revenue base.” “Looking ahead, IAMGOLD’s newly consolidated 20.3 million ounce Measured and Indicated Mineral Resource at Côté and Gosselin further highlights the scale and long-term value of this world-class gold system. The updated Côté mine plan and mineral reserve estimate, expected in the fourth quarter, is anticipated to integrate Gosselin for the first time, representing an important milestone towards cashflow from Metalla’s 1.5% royalty covering the northern portion of Côté and substantially all of Gosselin. With a growing base of producing royalties and a high-quality development pipeline continuing to advance toward production, we believe Metalla is well positioned to deliver meaningful long-term growth on a per-share basis.” -2- COMPANY HIGHLIGHTS Key Company highlights during the three months ended June 30, 2026, and subsequent period include: • A record breaking quarter for the Company, recording revenue from royalty and stream interests of $5.2 million, net income of $1.2 million, basic and diluted earnings of $0.01 per share, and Adjusted EBITDA of $3.9 million (see Non-IFRS Financial Measures), all of which were quarterly records for the Company; • Recognized revenue from royalty and stream interests, including fixed royalty payments, of $5.2 million for the three months ended June 30, 2026, a 94% increase compared to revenue of $2.7 million for the three months ended June 30, 2025; net income of $1.2 million for the three months ended June 30, 2026, compared to a net loss of $1.7 million for the three months ended June 30, 2025; and Adjusted EBITDA of $3.9 million for the three months ended June 30, 2026, a 159% increase compared to Adjusted EBITDA of $1.5 million for the three months ended June 30, 2025 (see Non-IFRS Financial Measures); • Received or accrued payments on 1,173 attributable Gold Equivalent Ounces (“GEOs”) for the three months ended June 30, 2026, at an average realized price of $4,504 per attributable GEO (see Non-IFRS Financial Measures); • On July 29, 2026, Agnico Eagle Mines Ltd. (“Agnico”) announced that trucking of ore from the Amalgamated Kirkland (“AK”) deposit to the LZ5 processing facility commenced in the second quarter of 2026. The LZ5 mill processed 71,000 tonnes of ore from the AK deposit and produced 7,800 ounces of gold during the quarter. Metalla received its inaugural cash flows from the Amalgamated Kirkland royalty in the period; • On June 23, 2026, Mr. Sandeep Singh was elected to the Metalla Board of Directors as a non- executive Director. The Company also announced that Mr. Singh had purchased 150,000 Common Shares in the market, and the Company had awarded him an aggregate of 150,000 restricted share units (“RSUs”) to match his investment. The RSUs will vest in three equal installments annually from the date of the grant; • On July 22, 2026, Silver Storm Mining Ltd. (“Silver Storm”) announced the first shipment of lead- silver and zinc concentrates from La Parrilla silver mine complex. Silver Storm reported that it had successfully produced an initial batch of concentrates using the La Parrilla sulphide processing circuit, then subsequently completed an initial shipment of 105 dmt of lead-silver concentrate and 70 dmt of zinc concentrate. The shipment was completed as part of Silver Storm’s previously announced offtake prepayment agreement. Silver Storm plans to continue increasing sulphide circuit processing rates with a goal of ramping up toward the nameplate capacity of 1,250 tonnes per day. Metalla expects to receive initial cash flows from La Parrilla during the 2026 fiscal year; • On June 1, 2026, IAMGOLD Corp. (“IAMGOLD”) announced an updated Mineral Resource Estimate (“MRE”) for the Côté gold mine. The updated MRE integrates the Côté and Gosselin zones, including the connecting saddle area, into a single geological and resource framework. Updated Measured and Indicated Mineral Resources, inclusive of Mineral Reserves, totalled 12.7 million ounces of gold at Côté, and 7.4 million ounces of gold at Gosselin, and a total consolidated Measured and Indicated Resource, inclusive of Mineral Reserves, of 20.3 million ounces of gold. -3- Updated Inferred Mineral Resources totalled 2.0 million ounces of gold at Côté, and 0.9 million ounces of gold at Gosselin, and a total Inferred Mineral Resource of 3.5 million ounces of gold. The updated MRE will inform the upcoming Côté Gold Technical Report and mine plan, which remains on track for release in the fourth quarter of 2026; • On July 27, 2026, the Company filed a short form base shelf prospectus, and a corresponding registration statement on Form F-10 that replaced the expiring base shelf prospectus and Form F- 10 registration statement previously filed by the Company in 2024; and • On June 23, 2026, the Company announced the release of its 2026 Asset Handbook outlining the Company’s gold, silver, and copper production, development, and exploration assets, as well as Mineral Reserve and Mineral Resource data for the underlying properties. The Asset Handbook is available on the Company’s website. Key operating and financial metrics for the Company include: Three months ended Six months ended June 30, June 30, June 30, June 30, 2026 2025 2026 2025 Revenue from royalty interests(1) $ 5,224 $ 2,695 $ 8,288 $ 4,416 Net income (loss) $ 1,223 $ (1,736) $ 1,334 $ (2,467) Earnings (loss) per share - basic and diluted $ 0.01 $ (0.02) $ 0.01 $ (0.03) Adjusted EBITDA (2) $ 3,850 $ 1,485 $ 5,713 $ 2,351 Total attributable GEOs (2) 1,173 840 1,833 1,468 Average realized price per attributable GEO (2) $ 4,504 $ 3,289 $ 4,636 $ 3,104 (1) Includes fixed royalty payments. (2) For the methodology used to calculate these measures including GEOs see Non-IFRS Financial Measures. OUTLOOK In 2026, the Company continues to expect to receive or accrue payments on 3,500 to 4,500 attributable GEOs. The lower end of the range reflects current operating assumptions and known constraints, while the upper end incorporates the potential impact of improved grades, continued ramp-up of key assets, and contributions from new sources of cash flow. Attributable GEOs are expected to be weighted toward the second half of 2026, reflecting the timing of higher-grade production and the continued ramp-up of key assets. -4- ASSET UPDATES Below are updates during the three months ended June 30, 2026, and subsequent period to certain of the Company’s assets, based on information publicly filed by the applicable project owner: Producing Assets Tocantinzinho On July 9, 2026, G Mining Ventures Corp. (“G Mining”) announced preliminary gold production of 36,845 oz at Tocantinzinho, an increase of 16% compared to the first quarter, and gold sales of 37,439 oz during the second quarter of 2026. G Mining reported that Tocantinzinho achieved record quarterly mining of 6.3 Mt in Q2 2026, and the planned commissioning of additional haul trucks and a front-end loader is expected to further support increased mining rates. G Mining also stated that it remains on track to achieve its 2026 production guidance of 160–190 koz of gold with production expected to be weighted towards the second half of the year as higher-grade phase 2 mineralization becomes available in accordance with the mine plan. Metalla accrued 280 GEOs from Tocantinzinho for the second quarter of 2026. Metalla holds a 0.75% GVR royalty on Tocantinzinho. Wharf On August 5, 2026, Coeur Mining, Inc. (“Coeur”) reported second quarter gold production of 18.1 koz at Wharf, an increase of 85% quarter over quarter. Coeur stated that higher production during the quarter was driven by increased ore tonnes placed, reflecting the successful return to normal crushing rates following the November 2025 crusher fire, bolstered by contract crushing exceeding planned throughput. Concurrent with the completion of the secondary and tertiary crusher upgrades, demobilization of the contract crushing is complete and normal site operations have resumed. Coeur also announced that exploration expenditures during the second quarter totalled $5 million and were focused on a mix of expansion and infill drilling at Juno, North Foley, Boston, and Summit Flat targets. In 2026, exploration programs at Juno and North Foley are expected to build on the 2025 expansion and infill drilling. Other targets, including Annie Creek and Summit Flat, are also expected to undergo expansion and infill drilling, while scout drilling is expected to continue development of the inferred resource pipeline. Coeur reiterated its previous guidance for 2026 of 72-90 koz gold production and $10-$12 million on exploration expenses. Metalla accrued 344 GEOs from Wharf for the second quarter of 2026. Metalla holds a 1.0% GVR royalty on the gold produced at Wharf mine. -5- Aranzazu On July 10, 2026, Aura Minerals Inc. (“Aura”) reported second quarter preliminary production from Aranzazu of 17,882 GEOs (as defined by Aura), marking a 14% increase over the first quarter of 2026, resulting mainly from metal prices and their impact on conversion to GEOs (as defined by Aura). Metalla accrued 157 GEOs from Aranzazu for the second quarter of 2026. Metalla holds a 1.0% NSR royalty on Aranzazu. Endeavor On July 14, 2026, Polymetals Resources Ltd. (“Polymetals”) reported silver production of 396,485 oz, zinc production of 3,268 tonnes, and lead production of 2,061 tonnes in the second quarter of 2026. Record production was achieved during the quarter increasing by 48% quarter-on-quarter with ore drawn from both the Main Lode and the Upper North Lode (“UNL”). Subsequent to quarter end, Polymetals commenced its first processing trial campaign of high-grade UNL ore. Polymetals stated that initial results have been positive and demonstrated a pathway to optimize value by leveraging both concentrate from milling and Direct Shipping Ore to markets to maximize revenue. Polymetals also reported revenue of A$45.8 million in the quarter, an increase of 65% quarter-on-quarter. On June 24, 2026, Polymetals reported that the first 12 underground diamond holes of a 34-hole campaign confirmed broad zones of high-grade silver-lead-zinc mineralization remain intact [Excerpt trimmed for readability. Open the original source for the complete filing or document.]
