Briefing
The Project has been evaluated at a life of mine (“ LoM ”) average of 2,000 tonnes per day (“ t/d ”) of Run of Mine (“ ROM ”) and demonstrates strong economics using a long-term gold price of US$3,500/oz (the “ Base Case ”), and enhanced economics using a long-term gold price of US$4,500/oz (the “ Upside Case ”). Key points: The Project has been evaluated at a life of mine (“ LoM ”) average of 2,000 tonnes per day (“ t/d ”) of Run of Mine (“ ROM ”) and demonstrates strong economics using a long-term gold price of US$3,500/oz (the “ Base Case; Any such decision will be dependent on further exploration and the preparation of a feasibility study which has not been completed, as well as other factors; The PEA outlines a phased development plan beginning with open pit mining of near surface mineralization followed by underground mining; The PEA is supported by an updated mineral resource estimate (“2026 MRE ”), which resulted in a 48% increase in indicated ounces of gold (compared to the 2024 MRE announced on September 4, 2024), showing improved confide; Readers are cautioned that at this time no production decision in respect of the Project has been made. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.
Source Notes
The Project has been evaluated at a life of mine (“ LoM ”) average of 2,000 tonnes per day (“ t/d ”)...
Extractive summary evidence · source
Any such decision will be dependent on further exploration and the preparation of a feasibility study which has not been completed, as...
Extractive summary evidence 2 · source
The PEA outlines a phased development plan beginning with open pit mining of near surface mineralization followed by underground mining.
Extractive summary evidence 3 · source
The PEA is supported by an updated mineral resource estimate (“2026 MRE ”), which resulted in a 48% increase in indicated ounces...
Extractive summary evidence 4 · source
Extracted Document Text
This is the EGM normalized Markdown text available for this source. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.
# RPX Gold Inc. Delivers Robust Preliminary Economic Assessment and Updated Mineral Resource Estimate for Wawa Gold Project Source: https://www.rpxgold.com/red-pine-announces-results-of-its-annual-general-meeting-2/ Published: 2026-02-18T21:17:53+00:00 Fetched: 2026-09-10T06:44:56.315+00:00 Source artifact: 7dc4098a-ead7-4085-984c-4e790c3ca35a Normalizer input: text ## Content Toronto, Ontario – February 18, 2026 – RPX Gold Inc. (“ RPX Gold ” or the “ Company ”) (TSXV: RPX) is pleased to announce the results of a Preliminary Economic Assessment (“ PEA ”) for its 100%-owned Wawa Gold Project (the “ Project ”) located in northwestern Ontario, Canada. The PEA was prepared by DRA Americas Inc. (“ DRA ”), in accordance with National Instrument 43101 Standards of Disclosure for Mineral Projects (“ NI 43-101 ”). All amounts are in Canadian dollars, unless otherwise stated. The PEA outlines a phased development plan beginning with open pit mining of near surface mineralization followed by underground mining. The Project has been evaluated at a life of mine (“ LoM ”) average of 2,000 tonnes per day (“ t/d ”) of Run of Mine (“ ROM ”) and demonstrates strong economics using a long-term gold price of US$3,500/oz (the “ Base Case ”), and enhanced economics using a long-term gold price of US$4,500/oz (the “ Upside Case ”). Readers are cautioned that at this time no production decision in respect of the Project has been made. Any such decision will be dependent on further exploration and the preparation of a feasibility study which has not been completed, as well as other factors. The PEA is supported by an updated mineral resource estimate (“2026 MRE ”), which resulted in a 48% increase in indicated ounces of gold (compared to the 2024 MRE announced on September 4, 2024), showing improved confidence in the estimation upon which the PEA is based. The 2026 MRE is inclusive of an open pit- and underground mineral resource, prepared by WSP Canada Inc. (“WSP”).