Eve Eve's Gold Miners Research Library
Eve's Gold Miners Source Brief

Drilling Intersects 9.03 g/t gold over 14.00 m core length, further supporting Open Pit Potential

RPX Gold Inc. · RPX news official

The 1-kilogram screen assay method is selected for samples anticipated to contain coarse gold and when the fire-assay-AA finish return results greater or equal to 2.25 g/t Au.

Briefing

The 1-kilogram screen assay method is selected for samples anticipated to contain coarse gold and when the fire-assay-AA finish return results greater or equal to 2.25 g/t Au. Key points: The 1-kilogram screen assay method is selected for samples anticipated to contain coarse gold and when the fire-assay-AA finish return results greater or equal to 2.25 g/t Au; Drilling has also intersected gold mineralization in satellite zones in the hanging wall of the Jubilee Shear that could contribute to reducing the stripping ratio of the possible open pit and include the following signi; The gold assay results from the drilling program will strengthen the geological database for the forthcoming update of the mineral resource that will support the evaluation of a possible open pit (Figure 1); With baseline studies underway and funding in place to complete the PEA, we are advancing toward production and the long-term goal of transitioning from explorer to producer in today’s strong gold price environment.” Dri; Drilling Highlights (Table 1 and Figure 1) • 9.03 grams per tonne (“g/t”) gold (“Au”) over 14.00 metres (“m”) core length, including 54.40 g/t Au over 2.00 m in hole SD-25-581 • 2.66 g/t Au over 10.13 m including 9.18 g/; Forward-looking information contained in this news release includes, but may not be limited to, statements regarding the higher grade gold mineralization at surface providing an opportunity to advance towards mine produc. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.

Source Notes

The 1-kilogram screen assay method is selected for samples anticipated to contain coarse gold and when the fire-assay-AA finish return results greater...

Extractive summary evidence · source

Drilling has also intersected gold mineralization in satellite zones in the hanging wall of the Jubilee Shear that could contribute to reducing...

Extractive summary evidence 2 · source

The gold assay results from the drilling program will strengthen the geological database for the forthcoming update of the mineral resource that...

Extractive summary evidence 3 · source

With baseline studies underway and funding in place to complete the PEA, we are advancing toward production and the long-term goal of...

Extractive summary evidence 4 · source

Extracted Document Text

This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.

# Drilling Intersects 9.03 g/t gold over 14.00 m core length, further supporting Open Pit Potential

Source: https://www.rpxgold.com/wp-content/uploads/2025/09/Red-Pine-Drilling-Results-Sept-4-2025-Final.pdf
Fetched: 2026-09-26T01:13:33.919+00:00
Source artifact: 298a5e28-2ac1-4e88-84b9-4b8621edd301
Normalizer input: text

## Content

# Drilling Intersects 9.03 g/t gold over 14.00 m core length, further supporting Open Pit Potential
Drilling Intersects 9.03 g/t gold over 14.00 m core length,
further supporting Open Pit Potential
Toronto, Ontario (September 4, 2025) – Red Pine Exploration Inc. (TSXV: RPX, OTCQB:
RDEXF) (“Red Pine” or the “Company”) is pleased to announce additional results from the recent
near surface drilling program designed to better define gold mineralization in the area of a
potential open pit at the Wawa Gold Project (See Press Release dated May 8, 2025).
Drilling Highlights (Table 1 and Figure 1)
• 9.03 grams per tonne (“g/t”) gold (“Au”) over 14.00 metres (“m”) core length, including
54.40 g/t Au over 2.00 m in hole SD-25-581
• 2.66 g/t Au over 10.13 m including 9.18 g/t Au over 1.12 m and 6.85 g/t Au over 1.00 m in
hole SD-25-570
• 2.47 g/t Au over 7.50 m including 12.90 g/t gold over 0.73 m in hole SD-25-576.
• Previous intersections from the same area include:
o 4.42 g/t Au over 18.99 m, including 40.20 g/t Au over 1.02 m in hole SD-17-172
o 3.08 g/t Au over 16.72 m, including 40.20 g/t Au over 1.00 m in hole SD-25-520
o 65.60 g/t Au over 1.12 m in hole SD-25-521
Michael Michaud, President and CEO of Red Pine commented: “We are encouraged by the near-
surface drilling results, which returned high-grade gold within the Jubilee Shear Zone and
confirms continuity with previous drilling. The presence of higher-grade mineralization near
surface supports the potential for toll milling and use of regional infrastructure in our evaluation of
the open pit potential of the Wawa Gold Project.
Our immediate focus is updating the mineral resource estimate ahead of a PEA (“Preliminary
Economic Assessment”) in early 2026, which will define the optimal mining and processing
strategy. With baseline studies underway and funding in place to complete the PEA, we are
advancing toward production and the long-term goal of transitioning from explorer to producer in
today’s strong gold price environment.”
Drilling Program
Red Pine has now completed its diamond drilling program that commenced in November 2024
and totaling 69 drill holes for 24,575 m. A total of 23 drill holes totalling 4,492 m of drilling are
included in this release. The gold assay results from the drilling program will strengthen the
geological database for the forthcoming update of the mineral resource that will support the
evaluation of a possible open pit (Figure 1). Drilling has successfully demonstrated the presence
of significant gold mineralization in the potential open pit area. Additional drilling results from 11
holes remain pending.
Drilling has also intersected gold mineralization in satellite zones in the hanging wall of the Jubilee
Shear that could contribute to reducing the stripping ratio of the possible open pit and include the
following significant results:
• SD-25-590 intersected 4.38 m @ 4.64 g/t Au, including 1.00 m @ 18.60 g/t Au
• SD-25-588 intersected 7.73 m @ 1.62 g/t Au, including 1.43 m @ 6.07 g/t Au
Table 1 Recent drilling results from the 2024-2025 drilling program
Hole From To Length Gold Zone
(#) (m) (m) (m)* (g/t) (name)
SD-25-547 24.33 27.33 3.00 4.68 Jubilee Shear - Main
SD-25-549 63.00 64.00 1.00 1.60 Jubilee Shear - Main
SD-25-551 118.00 119.06 1.06 8.32 Jubilee Shear - Main
SD-25-554 64.24 65.50 1.26 1.83 Jubilee Shear - Main
SD-25-561 109.34 110.00 0.66 2.13 Jubilee Shear - Main
SD-25-564 80.18 88.47 8.29 0.94 Jubilee Shear - Main
SD-25-566 19.95 21.36 1.41 21.90 Jubilee Shear - Lower
SD-25-567 100.00 101.00 1.00 1.72 HW – Vein Network
SD-25-569 29.08 33.00 3.92 1.09 Jubilee Shear - Main
SD-25-570 82.37 92.50 10.13 2.66 Jubilee Shear - Main
including 88.18 89.30 1.12 9.18
and 91.50 92.50 1.00 6.85
SD-25-571 88.00 89.00 1.00 1.01 Jubilee Shear - Main
SD-25-576 49.03 56.53 7.50 2.47 Jubilee Shear - Main
including 51.21 51.94 0.73 12.90
SD-25-579 125.78 139.84 14.06 0.48 Jubilee Shear - Main
Including 139.02 139.84 0.82 5.39
SD-25-581 102.00 116.00 14.00 9.03 Jubilee Shear - Main
Including 113.00 114.00 1.00 24.90
and 114.00 115.00 1.00 83.90
SD-25-583 110.27 120.35 9.78 1.11 Jubilee Shear - Main
including 116.32 117.31 0.99 5.43
SD-25-584 9.00 14.00 5.00 1.13 Vein Network
111.00 127.00 16.00 0.77 Jubilee Shear - Main
including 111.00 112.00 1.00 6.47
SD-25-586 113.55 117.99 4.44 2.90 Jubilee Shear - Main
including 115.06 116.51 1.45 6.04
SD-25-588 64.27 72.00 7.73 1.62 HW - Satellite Shears
including 69.21 70.64 1.43 6.07
107.11 117.21 10.10 1.12 Jubilee Shear - Main
including 113.00 114.06 1.06 3.91
SD-25-589 158.66 171.66 13.00 0.63 Jubilee Shear - Lower
including 163.00 164.21 1.21 2.23
SD-25-590 69.42 73.80 4.38 4.64 HW - Satellite Shears
including 69.42 70.42 1.00 18.60
*Intercepts are calculated using a 0.40 g/t Au cut-off and a maximum of 6.0 m of internal dilution with no
capping applied and are reported over core lengths. True widths are estimated to vary between 70 to 95%
of the reported core length in the Jubilee Shear.
Quality Assurance/Quality Control ("QA/QC") Measures
Individual drill core samples are labelled and split in half along a pre-marked cutting line using a
diamond saw. A consistent half-core sample is then placed in an individual plastic sample bag
that is sealed. The remaining half-core samples are kept at the core storage facility of the
Company located on the Wawa Gold project. Quarter-core duplicates are taken from certain
samples to define the variability of gold distribution. Groups of samples are then placed into
durable rice bags sealed with security seals to be transported using a commercial carrier for
analysis to Actlabs in Ancaster, Ontario. NQ core assays were obtained by 50-gram fire-assaying-
AA finish or by 1-kilogram screen fire assay. The 1-kilogram screen assay method is selected for
samples anticipated to contain coarse gold and when the fire-assay-AA finish return results
greater or equal to 2.25 g/t Au. The residual coarse reject portions of the samples remain in
storage for a minimum 90-day period if further work or verification is needed.
As part of its QA/QC program, Red Pine inserts external gold standards (low- to high-grade) and
blanks every 20 samples and routinely insert blanks immediately after samples with visible gold.
Quarter core duplicates are routinely inserted to evaluate the natural variability of gold
mineralization. Assay certificates are sent to at least three members of the senior management
team, and they are directly accessible from the WebLIMS portal of Actlabs. Approximately 5% of
the pulps and coarse rejects analyzed at Actlabs are sent to Agat Laboratories in Thunder Bay
for umpire testing.
Table 2 – Drill hole location details
Hole UTM E UTM N Elevation Azimuth Inclination Length Assays
(#) (m) (m) (masl) (°) (°) (m) Status
SD-25-547 668289 5317260 346.6 290.2 47.3 126.0 Complete
SD-25-549 668364 5317460 375.5 290.0 45.0 135.0 Complete
SD-25-551 668366 5317458 375.9 290.0 89.1 132.0 Complete
SD-25-554 668332 5317414 376.3 114.3 85.2 132.0 Complete
SD-25-560 668368 5317493 372.5 290.0 45.0 276.0 Complete
SD-25-561 668370 5317491 373.3 107.0 79.1 162.0 Complete
SD-25-563 668517 5317471 374.8 297.6 45.2 249.0 Complete
SD-25-564 668407 5317355 386.6 289.9 46.0 222.0 Complete
SD-25-566 667968 5316541 353.9 308.0 60.1 354.0 Partial
SD-25-567 668447 5317314 390.7 297.8 44.9 255.0 Partial
SD-25-569 668154 5316641 351.8 295.0 46.0 180.0 Complete
SD-25-570 668160 5316465 366.5 277.3 51.0 92.5 Complete
SD-25-571 668164 5316542 370.1 290.2 45.0 180.0 Complete
SD-25-576 668021 5316301 374.7 295.1 45.1 135.0 Complete
SD-25-579 668224 5316471 379.8 283.1 64.0 201.0 Complete
SD-25-581 668106 5316316 376.3 265.9 48.0 159.0 Complete
SD-25-582 668322 5316534 385.9 299.0 47.2 264.0 Complete
SD-25-583 668168 5316373 370.6 325.1 53.5 198.0 Complete
SD-25-584 668206 5316528 379.5 343.0 55.0 264.0 Complete
SD-25-586 668206 5316529 379.5 314.0 46.0 219.0 Complete
SD-25-588 668207 5316529 379.5 293.1 48.1 219.0 Complete
Hole UTM E UTM N Elevation Azimuth Inclination Length Assays
(#) (m) (m) (masl) (°) (°) (m) Status
SD-25-589 668216 5316594 369.5 300.0 45.1 233.1 Partial
SD-25-590 668208 5316528 379.5 287.0 61.9 104.3 Complete
Qualified Person
Jean-Francois Montreuil, P.Geo. and Vice President, Exploration of Red Pine and the Qualified
Person, as defined by National Instrument 43-101, has reviewed and approved the technical
information contained in this news release.
About Red Pine Exploration Inc.
Red Pine Exploration Inc. is a gold exploration company headquartered in Toronto, Ontario,
Canada. The Company's shares trade on the TSX Venture Exchange under the symbol "RPX"
and on the OTCQB Markets under the symbol “RDEXF”.
The Wawa Gold Project is in the Michipicoten Greenstone Belt of Ontario, a region that has seen
major investment by several producers in the last five years. The Company’s land package hosts
numerous historic gold mines and is over 7,000 hectares in size. Red Pine is building a strong
position as a major mineral exploration and development player in the Michipicoten region.
For more information about the Company, visit www.redpineexp.com
Or contact:
Michael Michaud, President and Chief Executive Officer, at (416) 364-7024 or
mmichaud@redpineexp.com
Or
Manish Grigo, Director of Corporate Development, at (416) 569-3292 or mgrigo@redpineexp.com
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
Cautionary Note Regarding Forward-Looking Information
This news release contains statements which constitute “forward-looking information” within the meaning
of applicable securities laws, including statements regarding the plans, intentions, beliefs and current
expectations of the Company with respect to future business activities and operating performance.
Forward-looking information is often identified by the words “may”, “would”, “could”, “should”, “will”, “intend”,
“plan”, “anticipate”, “believe”, “estimate”, “expect” or similar expressions. Forward-looking information
contained in this news release includes, but may not be limited to, statements regarding the higher grade
gold mineralization at surface providing an opportunity to advance towards mine production utilizing toll
milling and other regional infrastructure to leverage the high gold price environment; the Company’s focus
is on updating the mineral resource estimate, which will serve as a basis for a PEA study to be completed
early in 2026; the PEA will highlight the optimal mining and processing scenario and the overall value of
the project at this time; the Company’s goal being to transition from an exploration company to producer
over the next several years; and the Company being funded to complete the PEA. Investors are cautioned
that forward-looking information is not based on historical facts but instead reflects management’s
expectations, estimates or projections concerning future results or events based on the opinions,
assumptions and estimates of management considered reasonable at the date the statements are made.
Such opinions, assumptions and estimates are inherently subject to a variety of risks and uncertainties that
could cause actual events or results to differ materially from those projected and undue reliance should not
be placed on such information, as unknown or unpredictable factors could have material adverse effects
on future results, performance or achievements. Among the key factors that could cause actual results to
differ materially from those projected in the forward-lo

[Excerpt trimmed for readability. Open the original source for the complete filing or document.]