Eve Eve's Gold Miners Research Library
Eve's Gold Miners Source Brief

Snowline 2025 PEA NI 43-101 Report

Snowline Gold Corp · SGD document official 2025-09-01

Additional testwork is required over a wider range in grade, including additional lower end and mid-range material, to improve the validity of the geometallurgical model as a predictive tool for the LOM plan and metal production forecast.

Briefing

Additional testwork is required over a wider range in grade, including additional lower end and mid-range material, to improve the validity of the geometallurgical model as a predictive tool for the LOM plan and metal production forecast. Key points: Additional testwork is required over a wider range in grade, including additional lower end and mid-range material, to improve the validity of the geometallurgical model as a predictive tool for the LOM plan and metal pr; 1.11 Cost Estimate Initial capital expenditure (CAPEX) costs are estimated to be $1,685 M as summarized in Table 1-3; This cash flow results in a project net present value (NPV) of C$3,367 M, with an internal rate of return (IRR) of 25.0% and a payback period of 2.7 years from the start of production; The project is least sensitive to changes in capital costs, with every 1% change in capital cost affecting project NPV by approximately C$18 M; Production Schedule- 9.0 Mtpa 30 3.0 25 2.5 20 2.0 Mined Tonnes (Mt) Au (g/t) 15 1.5 10 1.0 5 0.5 0 0.0 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Ph 0 Waste Ph 0 Overburden Ph 1 Mill Feed Ph 1 Waste Ph 1 O; Plant Feed 10.0 5.0 9.0 4.5 8.0 4.0 7.0 3.5 6.0 3.0 Quantity (Mt) Au (g.t) 5.0 2.5 4.0 2.0 3.0 1.5 2.0 1.0 1.0 0.5 0.0 0.0 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Pit to Plant Stockpile to Plant Plant Fe. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.

Source Notes

Additional testwork is required over a wider range in grade, including additional lower end and mid-range material, to improve the validity of...

Extractive summary evidence · source

1.11 Cost Estimate Initial capital expenditure (CAPEX) costs are estimated to be $1,685 M as summarized in Table 1-3.

Extractive summary evidence 2 · source

This cash flow results in a project net present value (NPV) of C$3,367 M, with an internal rate of return (IRR) of...

Extractive summary evidence 3 · source

The project is least sensitive to changes in capital costs, with every 1% change in capital cost affecting project NPV by approximately...

Extractive summary evidence 4 · source

Extracted Document Text

This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.

# Snowline 2025 PEA NI 43-101 Report

Source: https://cdn.prod.website-files.com/68a4efe604ec81b5bb8528eb/68d2db353464dace2a8c8d7c_Snowline_-_PEA_-_NI41-303_report-lr%20(1)-compressed.pdf
Published: 2025-09-01T00:00:00+00:00
Fetched: 2026-05-06T13:48:38.4+00:00
Source artifact: 10efaf42-cd3e-4c5a-8794-43633857298a
Normalizer input: text

## Content

# Snowline 2025 PEA NI 43-101 Report
Source: https://cdn.prod.website-files.com/68a4efe604ec81b5bb8528eb/68d2db353464dace2a8c8d7c_Snowline_-_PEA_-_NI41-303_report-lr%20(1)-compressed.pdf
Published: 2025-09-01
Independent Preliminary
Economic Assessment for the
Rogue Project
Yukon, Canada
Prepared for
Snowline Gold Corp.
Amended and Restated Report Date: August 27, 2025
Revision of Report Dated July 30, 2025
Effective Date: March 1, 2025
The QPs that authored this report are:
Robert McCarthy, P.Eng. Jeff Clarke, P.Geo.
Edward Saunders, P.Eng. Adrian Dance, P.Eng.
Ignacio Garcia Schmidt, P.Eng. Heather Burrell, P.Geo.
Mauricio Herrera, P.Eng. Steven C Haggarty, P.Eng.
Megan Miller, P.Eng. Daniel Redmond, P.Geo.
Soren Jensen, P.Eng.
SRK Consulting (Canada) Inc.  CAPR003483  Aug 27, 2025
Inside Cover Page
Independent Preliminary Economic Assessment for the Rogue Project,
Yukon, Canada
Prepared for:
Snowline Gold Corp.
300-900 W Hastings St
Vancouver, BC , V6C 1E5
Canada
+1 778 650 5485
www. snowlinegold.com
Prepared by:
SRK Consulting (Canada) Inc.
320 Granville Street, Suite 2600
Vancouver, BC V6C 1S9
Canada
+1 604 681 4196
www.srk.com
File Name:
Snowline_PEA_NI43-101_Report_CAPR003483_20250827_FNL
Suggested Citation:
SRK Consulting (Canada) Inc. 2025. Independent Preliminary Economic Assessment for the Rogue Project
Yukon, Canada. Prepared for Snowline Gold Corp.: Vancouver, BC. Project number: CAPR003483. Issued
August 27, 2025, as a revision of the report dated July 30, 2025.
Amended and Restated Report Date: August 27, 2025
Revision of Report Dated July 30, 2025
Effective Date: March 1, 2025
The QPs that authored this report are:
Robert McCarthy, P.Eng. Jeff Clarke, P.Geo.
Edward Saunders, P.Eng. Adrian Dance, P.Eng.
Ignacio Garcia Schmidt, P.Eng. Heather Burrell, P.Geo.
Mauricio Herrera, P.Eng. Steven C Haggarty, P.Eng.
Megan Miller, P.Eng. Daniel Redmond, P.Geo.
Soren Jensen, P.Eng.
Copyright © 2025
SRK Consulting (Canada) Inc. CAPR003483 Aug 27 2025
Independent Preliminary Economic Assessment for the Rogue Project, Yukon, Canada
Snowline Gold Corp.
Important Notice
This report was prepared as a National Instrument 43-101 Technical Report for Snowline Gold Corp. by SRK Consulting
(Canada) Inc. The quality of information, conclusions, and estimates contained herein is consistent with the level of effort
involved in SRK’s services, based on: i) information available at the time of preparation, ii) data supplied by outside
sources, and iii) the assumptions, conditions, and qualifications set forth in this report. This report is intended for use by
Snowline subject to the terms and conditions of its contract with SRK and relevant securities legislation. The contract
permits Snowline to file this report as a Technical Report with Canadian securities regulatory authorities pursuant to
National Instrument 43-101, Standards of Disclosure for Mineral Projects. Except for the purposes legislated under
provincial securities law, any other uses of this report by any third party are at that party’s sole risk. The responsibility for
this disclosure remains with Snowline. The user of this document should ensure that this is the most recent Technical
Report for the property, as it is not valid if a new Technical Report has been issued.
Copyright
This report is protected by copyright vested in SRK Consulting (Canada) Inc. It may not be reproduced or transmitted in
any form or by any means whatsoever to any person without the written permission of the copyright holder, other than in
accordance with stock exchange and other regulatory authority requirements.
SRK CONSULTING (CANADA) INC  AUG 27, 2025  VARIOUS/PD iii
Independent Preliminary Economic Assessment for the Rogue Project, Yukon, Canada
Snowline Gold Corp.
Contents
1 Summary ................................................................................................................................................................ 17
1.1 Introduction ............................................................................................................................................................. 17
1.2 Property Description and Ownership ...................................................................................................................... 17
1.3 Geology and Mineralization .................................................................................................................................... 17
1.4 Exploration Status .................................................................................................................................................. 18
1.5 Metallurgical Testing ............................................................................................................................................... 18
1.6 Mineral Resource Estimate .................................................................................................................................... 18
1.7 Mining Methods ...................................................................................................................................................... 19
1.8 Recovery Methods .................................................................................................................................................. 20
1.9 Project Infrastructure .............................................................................................................................................. 20
1.9.1 Off-Site Infrastructure .............................................................................................................................. 20
1.9.2 On-Site Infrastructure .............................................................................................................................. 20
1.9.3 Tailings Management .............................................................................................................................. 21
1.9.4 Water Management................................................................................................................................. 21
1.10 Environmental and Permitting ................................................................................................................................ 21
1.11 Cost Estimate ......................................................................................................................................................... 22
1.12 Economic Analysis ................................................................................................................................................. 23
1.13 Recommendations .................................................................................................................................................. 25
2 Introduction ............................................................................................................................................................. 26
2.1 Issuer ...................................................................................................................................................................... 26
2.2 Terms of Reference ................................................................................................................................................ 26
2.3 Work Program ........................................................................................................................................................ 27
2.4 Basis of Technical Report....................................................................................................................................... 27
2.5 Qualifications of SRK and SRK Team .................................................................................................................... 27
2.6 Site Visit .................................................................................................................................................................. 28
2.7 Declaration ............................................................................................................................................................. 30
3 Reliance on Other Experts ..................................................................................................................................... 31
4 Property Description and Location ......................................................................................................................... 32
4.1 Location .................................................................................................................................................................. 32
4.2 Property and Title in Yukon Territory (Surface and Sub-Surface Rights) .............................................................. 33
4.3 Project Ownership .................................................................................................................................................. 34
4.4 Land Tenure Requirements .................................................................................................................................... 38
4.5 Property Agreements .............................................................................................................................................. 38
4.6 Royalties and Encumbrances ................................................................................................................................. 38
4.7 Environmental Considerations................................................................................................................................ 39
4.8 Permitting Considerations ...................................................................................................................................... 40
4.9 Land Use ................................................................................................................................................................ 41
4.9.1 First Nations ............................................................................................................................................ 41
4.9.2 Other ....................................................................................................................................................... 43
4.10 Conclusions ............................................................................................................................................................ 44
5 Accessibility, Climate, Local Resources, Infrastructure and Physiography ........................................................... 45
5.1 Accessibility ............................................................................................................................................................ 45
SRK CONSULTING (CANADA) INC  AUG 27, 2025  VARIOUS/PD iv
Independent Preliminary Economic Assessment for the Rogue Project, Yukon, Canada
Snowline Gold Corp.
5.2 Climate.................................................................................................................................................................... 46
5.3 Local Resources and Infrastructure ....................................................................................................................... 46
5.4 Physiography .......................................................................................................................................................... 47
5.5 Comments on Accessibility, Climate, Local Resources, Infrastructure and Physiography .................................... 47
6