23 Operating Costs The estimated life-of-mine operating cost per tonne of material processed along with the US$ cost per ounce gold produced for sale are summarized below. Key points: 23 Operating Costs The estimated life-of-mine operating cost per tonne of material processed along with the US$ cost per ounce gold produced for sale are summarized below; The project capital cost totals C$998.2 million and the sustaining capital cost totals C$692.7 million, leading to an overall capital expenditure of C$1,690.49 million; 24 Coffee Gold Project PEA Summary: Key Technical Assumptions and Cost Inputs Description Unit Value US$/oz Gold Price (Average LOM Base Case) 3,656 Au Exchange Rate C$/US$ 1.39 Discount Rate % 5 Project Parameters LOM y; 3 AISC is calculated as the sum of doré transportation, treatment and refining charges, royalties, total operating costs, and sustaining capital costs, divided by the quantity of ounces sold. *Numbers may not add up due; Economic Results Summary Description Unit Pre-Tax After-Tax NPV @ 5% MCA$ 4,916.3 3,004.5 IRR % 59.8 43.5 Payback Period Years 1.52 1.97 6.11 Exploration, Development and Production Based on the exploration and drilling; The PEA contemplates a high-grade open-pit heap-leach mine with an initial planned mine life of approximately 13 years. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.
Source Notes
23 Operating Costs The estimated life-of-mine operating cost per tonne of material processed along with the US$ cost per ounce gold produced...
Extractive summary evidence · source
The project capital cost totals C$998.2 million and the sustaining capital cost totals C$692.7 million, leading to an overall capital expenditure of...
Extractive summary evidence 2 · source
24 Coffee Gold Project PEA Summary: Key Technical Assumptions and Cost Inputs Description Unit Value US$/oz Gold Price (Average LOM Base Case)...
Extractive summary evidence 3 · source
3 AISC is calculated as the sum of doré transportation, treatment and refining charges, royalties, total operating costs, and sustaining capital costs,...
Extractive summary evidence 4 · source
Extracted Document Text
This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.
# AIF Source: https://talamoremining.com/site/assets/files/6204/annual-information-form-fuerte-2025.pdf Fetched: 2026-09-12T07:10:55.843+00:00 Source artifact: 378702ed-f549-4b30-8d88-4b15a94f3c92 Normalizer input: text ## Content # AIF ANNUAL INFORMATION FORM For the Year Ended December 31, 2025 Dated April 15, 2026 FUERTE METALS CORPORATION 3200 – 733 Seymour Street Vancouver, B.C. V6B 0S6 TABLE OF CONENTS ITEM 1: PRELIMINARY NOTES ................................................................................................................ 1 1.1 Effective Date of Information............................................................................................................. 1 1.2 Financial Statements and Management Discussion and Analysis ......................................................... 1 1.3 Currency............................................................................................................................................ 1 1.4 Scientific and Technical Information .................................................................................................. 1 ITEM 2: CAUTIONARY NOTES .................................................................................................................. 1 2.1 Cautionary Note Regarding Forward Looking Statements and Forward Looking Information .............. 1 2.2 Cautionary Note to United States Investors Regarding Classification of Mineral Resource Estimates... 4 2.3 Non-GAAP Measures ........................................................................................................................ 4 ITEM 3: CORPORATE STRUCTURE ......................................................................................................... 6 3.1 Name, Address and Incorporation ...................................................................................................... 6 3.2 Inter-corporate Relationships.............................................................................................................. 6 ITEM 4: GENERAL DEVELOPMENT OF THE BUSINESS ...................................................................... 6 4.1 Overview ........................................................................................................................................... 6 4.2 Three Year History ............................................................................................................................ 7 ITEM 5: DESCRIPTION OF THE BUSINESS ............................................................................................. 9 ITEM 6: COFFEE PROJECT ...................................................................................................................... 10 6.1 Current Technical Report ................................................................................................................. 10 6.2 Project Description, Location and Access ......................................................................................... 10 6.3 History ............................................................................................................................................ 11 6.4 Geological Setting, Mineralization and Deposit Types ...................................................................... 12 6.5 Exploration and Drilling................................................................................................................... 13 6.6 Sampling and Analysis..................................................................................................................... 14 6.7 Mineral Processing and Metallurgical Testing .................................................................................. 19 6.8 Mineral Resources and Mineral Reserves ......................................................................................... 20 6.9 Capital and Operating Costs ............................................................................................................. 23 6.10 Preliminary Economic Assessment ................................................................................................... 24 6.11 Exploration, Development and Production........................................................................................ 26 ITEM 7: RISK FACTORS............................................................................................................................ 28 ITEM 8: DIVIDENDS................................................................................................................................... 35 ITEM 9: DESCRIPTION OF CAPITAL STRUCTURE ............................................................................. 35 9.1 Common Shares............................................................................................................................... 35 9.2 Preferred Shares............................................................................................................................... 35 9.3 Series 1 Convertible Preferred Shares ............................................................................................... 35 ITEM 10: MARKET FOR SECURITIES ...................................................................................................... 36 10.1 Trading Price and Volume................................................................................................................ 36 10.2 Prior Sales ....................................................................................................................................... 36 ITEM 11: ESCROWED SECURITIES AND SECURITIES SUBJECT TO CONTRACTUAL RESTRICTION ON TRANSFER ................................................................................................. 37 ITEM 12: DIRECTORS AND OFFICERS .................................................................................................... 37 12.1 Name and Occupation ...................................................................................................................... 37 12.2 Conflicts of Interest.......................................................................................................................... 40 i ITEM 13: LEGAL PROCEEDINGS AND REGULATORY ACTIONS ...................................................... 40 ITEM 14: INTEREST OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS ............. 40 ITEM 15: TRANSFER AGENT AND REGISTRAR .................................................................................... 41 ITEM 16: MATERIAL CONTRACTS .......................................................................................................... 41 ITEM 17: INTERESTS OF EXPERTS .......................................................................................................... 41 ITEM 18: AUDIT AND CORPORATE RISK COMMITTEE...................................................................... 42 18.1 The Audit and Corporate Risk Committee Charter ............................................................................ 42 18.2 Composition of Audit and Corporate Risk Committee ...................................................................... 42 18.3 Relevant Education and Experience.................................................................................................. 42 18.4 Reliance on Certain Exemptions....................................................................................................... 43 18.5 Audit and Corporate Risk Committee Oversight ............................................................................... 43 18.6 Pre-Approval Policies and Procedures .............................................................................................. 43 18.7 External Audit Service Fees (By Category)....................................................................................... 43 ITEM 19: ADDITIONAL INFORMATION .................................................................................................. 43 SCHEDULE “A” – Audit and Corporate Risk Committee Charter ii ITEM 1: PRELIMINARY NOTES 1.1 Effective Date of Information References to “Fuerte Metals Corporation”, “Fuerte”, the “Company”, the “Corporation”, the “Issuer”, “its”, “our” and “we”, or related terms in this Annual Information Form (“AIF”), refer to Fuerte Metals Corporation and include, where the context requires, its subsidiaries. All information contained in this AIF is as at December 31, 2025, unless otherwise stated. 1.2 Financial Statements and Management Discussion and Analysis This AIF should be read in conjunction with the Company’s audited consolidated annual financial statements for the year ended December 31, 2025 (the “Financial Statements”), as well as the accompanying Management’s Discussion and Analysis (“MD&A”) for such period. The Financial Statements and MD&A are available on the System for Electronic Document Analysis and Retrieval (“SEDAR+”) at www.sedarplus.ca under the Company’s profile. 1.3 Currency All references to “$” or “dollars” in this AIF are to United States dollars, unless otherwise expressly stated. References to “C$” are to Canadian dollars. 1.4 Scientific and Technical Information Unless otherwise indicated, scientific and technical information in this AIF relating to the Company’s mineral property has been reviewed and approved by Denis Flood, Chief Operating Officer of the Company and a “Qualified Person” (“QP”) as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). ITEM 2: CAUTIONARY NOTES 2.1 Cautionary Note Regarding Forward Looking Statements and Forward Looking Information Information and statements contained in this AIF that are not historical facts are forward-looking information or forward-looking statements within the meaning of Canadian securities legislation (hereinafter collectively referred to as “forward-looking statements”) that involve risks and uncertainties. This AIF contains forward-looking statements such as estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Examples of forward-looking statements in this AIF include, but are not limited to, statements with respect to: • the estimates of mineral resources for the Company’s Coffee Project (the “Coffee Project” or “Coffee”); • outlook for the Coffee Project pertaining to exploration and development activities; • the preliminary economic assessment for the Coffee Project including anticipated production, planned mine life, operating costs, cash costs, all-in sustaining costs, capital costs, cash flow and closure costs; • the anticipated timing of a decision to proceed with construction of the Coffee Project; • anticipated royalties and the expectation that royalties will be repurchased; • the sensitivity of Coffee Project economics to gold prices; • the Company’s ability to comply with permitting and regulatory requirements related to exploration, development and operation of its mineral projects; • the Company’s planned exploration and development activities; • the Company’s ability to meet the payment requirements for maintenance of each of its mineral claims; • the Company’s access to the surface lands overlying its mineral claims; 1 • the Company’s ability to obtain all necessary permits for mine construction and operation at the Coffee Project and the timing to obtain such permits; • the adequacy of the mineral processing scheme developed on the basis of metallurgical investigations carried out at the Company’s projects; • the Company’s plans to build and operate a mine at the Coffee Project, including the timing thereof and any associated expenditures; • the design of any mining operations; • the Company’s ability to manage and/or mitigate any environmental and/or social risks associated with the development of the Company’s Coffee Projec [Excerpt trimmed for readability. Open the original source for the complete filing or document.]