Eve Eve's Gold Miners Research Library
Eve's Gold Miners Source Brief

07.07.2026 Troilus Drills 164 M Grading 0.95 g/t AuEq While Testing Unsampled Historic Drillhole Intervals in the Z87 Reserve Pit

Troilus Mining Corp. · TLG news official

All results reported today are located within the Z87 reserve pit, as defined in the Feasibility Study ( see May 14, 2024 press release ), and continue to support the Company’s objective of evaluating opportunities to improve future mine planning, including potential resource conversion, pit sequencing optimization, strip ratio improvements and early-year mill feed flexibility.

Briefing

All results reported today are located within the Z87 reserve pit, as defined in the Feasibility Study ( see May 14, 2024 press release ), and continue to support the Company’s objective of evaluating opportunities to improve future mine planning, including potential resource conversion, pit sequencing optimization, strip ratio improvements and early-year mill feed flexibility. Key points: All results reported today are located within the Z87 reserve pit, as defined in the Feasibility Study ( see May 14, 2024 press release ), and continue to support the Company’s objective of evaluating opportunities; To date, Troilus has released results from 20 drill holes totalling 5,563 metres of the approximately 24,000 metres allocated to the Z87 pit optimization program, which is targeting inferred and historically unsampled ma; The results reported include 7 drill holes totalling 1,845 metres, following the exploration program outlined in the Company’s March 31, 2026 press release ; The ongoing Z87 optimization program is designed to upgrade inferred material and target unsampled intervals from historic drilling within the hangingwall of the main ore zone. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.

Source Notes

All results reported today are located within the Z87 reserve pit, as defined in the Feasibility Study ( see May 14, 2024...

Extractive summary evidence · source

To date, Troilus has released results from 20 drill holes totalling 5,563 metres of the approximately 24,000 metres allocated to the Z87...

Extractive summary evidence 2 · source

The results reported include 7 drill holes totalling 1,845 metres, following the exploration program outlined in the Company’s March 31, 2026 press...

Extractive summary evidence 3 · source

The ongoing Z87 optimization program is designed to upgrade inferred material and target unsampled intervals from historic drilling within the hangingwall of...

Extractive summary evidence 4 · source

Extracted Document Text

This is the EGM normalized Markdown text available for this source. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.

# 07.07.2026 Troilus Drills 164 M Grading 0.95 g/t AuEq While Testing Unsampled Historic Drillhole Intervals in the Z87 Reserve Pit

Source: https://troilusmining.com/news-and-media/news-releases/troilus-drills-164-m-grading-095-gt-aueq-while-testing-unsampled-historic-drillhole-intervals-in-the-z87-reserve-pit
Fetched: 2026-09-12T07:11:26.846+00:00
Source artifact: beb78418-4771-47c7-a6da-d98e601cd9d4
Normalizer input: text

## Content

*0.95 G/T AUEQ (0.83 G/T AU, 1.30 G/T AG, 0.06 % CU) OVER 164 M
July 7, 2026, Montreal, Quebec – Troilus Mining Corp. (“Troilus” or the “Company”) ( TSX: TLG; OTCQX: CHXMF; FSE: CM5 ), is pleased to announce additional results from the Z87 optimization drill program, as part of its ongoing 2026 exploration activities at the Troilus Project located in north-central Quebec, Canada. The results reported include 7 drill holes totalling 1,845 metres, following the exploration program outlined in the Company’s March 31, 2026 press release . To date, Troilus has released results from 20 drill holes totalling 5,563 metres of the approximately 24,000 metres allocated to the Z87 pit optimization program, which is targeting inferred and historically unsampled material within and around the Z87 reserve pit shell.
The ongoing Z87 optimization program is designed to upgrade inferred material and target unsampled intervals from historic drilling within the hangingwall of the main ore zone. All results reported today are located within the Z87 reserve pit, as defined in the Feasibility Study ( see May 14, 2024 press release ), and continue to support the Company’s objective of evaluating opportunities to improve future mine planning, including potential resource conversion, pit sequencing optimization, strip ratio improvements and early-year mill feed flexibility.