Eve Eve's Gold Miners Research Library
Eve's Gold Miners Source Brief

11.06.2026 Troilus Continues to Expand High-Grade West Rim Discovery With 19.06 g/t AuEq Over 6.4 M and 6.81 g/t AuEq Over 5 M at Surface

Troilus Mining Corp. · TLG news official 2026-06-10

The latest results continue to demonstrate the emergence of a significant high-grade mineralized zone located entirely outside the current mineral resource estimate and within 200 metres of the reserve pit outlined in the Company’s 2024 Feasibility Study ( see May 14, 2024 press release ).

Briefing

The latest results continue to demonstrate the emergence of a significant high-grade mineralized zone located entirely outside the current mineral resource estimate and within 200 metres of the reserve pit outlined in the Company’s 2024 Feasibility Study ( see May 14, 2024 press release ). Key points: The latest results continue to demonstrate the emergence of a significant high-grade mineralized zone located entirely outside the current mineral resource estimate and within 200 metres of the reserve pit outlined in th; The now completed Phase 1 West Rim drill program focused on expanding the mineralized footprint of the West Rim Zone, which was initially discovered in 2024 through near-mine exploration drilling west of the North Reserv; Importantly, the intercepts reported from West Rim compare favourably to some of the highest-grade near-surface intercepts associated with the current reserve pit areas at Troilus while remaining in close proximity to pl; The results continue to support the potential for both open pit and underground development scenarios at West Rim. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.

Source Notes

The latest results continue to demonstrate the emergence of a significant high-grade mineralized zone located entirely outside the current mineral resource estimate...

Extractive summary evidence · source

The now completed Phase 1 West Rim drill program focused on expanding the mineralized footprint of the West Rim Zone, which was...

Extractive summary evidence 2 · source

Importantly, the intercepts reported from West Rim compare favourably to some of the highest-grade near-surface intercepts associated with the current reserve pit...

Extractive summary evidence 3 · source

The results continue to support the potential for both open pit and underground development scenarios at West Rim.

Extractive summary evidence 4 · source

Extracted Document Text

This is the EGM normalized Markdown text available for this source. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.

# 11.06.2026 Troilus Continues to Expand High-Grade West Rim Discovery With 19.06 g/t AuEq Over 6.4 M and 6.81 g/t AuEq Over 5 M at Surface

Source: https://troilusmining.com/news-and-media/news-releases/troilus-continues-to-expand-high-grade-west-rim-discovery-with-1906-gt-aueq-over-64-m-and-681-gt-aueq-over-5-m-at-surface
Published: 2026-06-10T23:00:00+00:00
Fetched: 2026-09-12T07:11:37.135+00:00
Source artifact: bf72d80f-71bd-4869-948a-b87d3aaa5feb
Normalizer input: text

## Content

JUNE 11, 2026, Montreal, Quebec – Troilus Mining Corp. (“Troilus” or the “Company”, TSX: TLG; OTCQX: CHXMF; FSE: CM5R) is pleased to announce additional drill results from the West Rim Zone (“West Rim”) as part of its ongoing 2026 Exploration Program ( see March 31, 2026 press release ) at its copper-gold Troilus Project located in northcentral Quebec, Canada.
The now completed Phase 1 West Rim drill program focused on expanding the mineralized footprint of the West Rim Zone, which was initially discovered in 2024 through near-mine exploration drilling west of the North Reserve Pit ( see May 30, 2024 press release ). The latest results continue to demonstrate the emergence of a significant high-grade mineralized zone located entirely outside the current mineral resource estimate and within 200 metres of the reserve pit outlined in the Company’s 2024 Feasibility Study ( see May 14, 2024 press release ).
Importantly, the intercepts reported from West Rim compare favourably to some of the highest-grade near-surface intercepts associated with the current reserve pit areas at Troilus while remaining in close proximity to planned mining and infrastructure areas. The results continue to support the potential for both open pit and underground development scenarios at West Rim. All grades are uncut, and true thicknesses are approximately 75% to 90% of drilled length.