Briefing
This document is a company presentation discussing Vizsla Silver's exploration and development activities at the Panuco Silver-Gold Project in Mexico. It outlines the company's vision, recent exploration progress, resource expansion targets, and ongoing technical work, including geophysical surveys and drilling. The presentation also highlights Vizsla's funding status, project ownership, and strategic milestones toward advancing the Panuco project toward production. Key points: Vizsla Silver's primary focus is the exploration and development of the Panuco district in Mexico, aiming to become the world's largest single-asset silver primary producer; The company is advancing through test mine development, project finance, and permitting, with a feasibility study targeted for Q4 2025 and first silver production targeted for H2 2027; Vizsla Silver reports being fully funded through to feasibility and beyond, with over $200M in cash and no debt, to support exploration and project development; The Panuco project is 100% owned by Vizsla Silver and has expanded its land package to over 30,000 hectares since January 2024; Significant exploration work has been completed, including over 392,000 metres of diamond drilling and ongoing geophysical surveys (HLEM) to identify new targets; Resource expansion and de-risking activities are ongoing, including upgrading resources to higher confidence categories and commencing a test mine in Q4 2024; Recent discoveries and drilling results are highlighted, such as the Animas vein system and significant intercepts at Napoleon HW4; The presentation includes forward-looking statements and cautions regarding risks and uncertainties inherent in exploration and development. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.
Source Notes
Vizsla’s vision is to become the World’s Largest Single Asset Silver Primary Producer through exploration and development of the Panuco district in...
Page 3 · source
Vizsla is well funded with $200M+ in cash plus ITM options(2) & warrants, no debt, to fund exploration and project development through...
Page 4 · source
Feasibility Study on Track for Q4 2025
Page 3 · source
Test mine commenced Q4 2024 to de-risk initial production • Targeting first silver in H2 2027
Page 4 · source
Extracted Document Text
This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.
# VZLA Exploration Webinar (July 29 2025) FINAL Source: https://wp-vizslasilvercorp-2024.s3.ca-central-1.amazonaws.com/media/2025/11/VZLA-Exploration-Webinar-July-29-2025-FINAL.pdf Published: 2025-07-29T00:00:00+00:00 Fetched: 2026-05-05T09:41:37.125+00:00 Source artifact: bf2bd4db-1c52-4456-ba8a-7e4d882b05a0 Normalizer input: text ## Content # VZLA Exploration Webinar (July 29 2025) FINAL 2025 Panuco & Greenfield Exploration Discussion NYSE:VZLA TSXV:VZLA Exploration Webinar July 30th, 2025 Forward Looking Statement This presentation contains “forward looking statements” regarding the Company within the meaning of applicable securities legislation, including statements as to future events, results and plans. Forward-looking statements are sometimes but not always identified by such words as “targeted”, “can”, “will”, “anticipates”, “projects”, “expects”, “intends”, “likely”, “plans”, “should”, “could” or “may” or grammatical variations thereof. These include, without limitation, statements with respect to: the exploration, development and production of the Panuco property; publication of a feasibility study; timelines for a construction decision and first silver production; exploration upside; expected cash flows; drilling programs; metallurgical optimization plans; strategic plans; exploration and development objectives; potential production at the Panuco property including related costs; district upside potential; re-rating potential; and key potential catalysts. These forward-looking statements reflect the Company’s current beliefs and are based on information currently available to the Company and assumptions the Company believes are reasonable. The Company has made various assumptions, including, among others, that: the historical information related to the Company’s properties is reliable; the Company’s operations are not disrupted or delayed by unusual geological or technical problems; the Company has the ability to explore and develop the Company’s properties; the Company will be able to raise any necessary additional capital on reasonable terms to execute its business plan; the Company’s current corporate activities will proceed as expected; general business and economic conditions will not change in a material adverse manner; and budgeted costs and expenditures are and will continue to be accurate. Actual results and developments may differ materially from results and developments discussed in the forward-looking statements as they are subject to a number of significant risks and uncertainties, including: public health threats; fluctuations in metals prices, price of consumed commodities and currency markets; future profitability of mining operations; access to personnel; results of exploration and development activities, accuracy of technical information; risks related to ownership of properties; risks related to mining operations; risks related to mineral resource figures being estimates based on interpretations and assumptions which may result in less mineral production under actual conditions than is currently anticipated; the interpretation of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; changes in operating expenses; changes in general market and industry conditions; changes in legal or regulatory requirements; other risk factors set out in this presentation; and other risk factors set out in the Company’s public disclosure documents. Although the Company has attempted to identify significant risks and uncertainties that could cause actual results to differ materially, there may be other risks that cause results not to be as anticipated, estimated or intended. Certain of these risks and uncertainties are beyond the Company’s control. Consequently, all of the forward-looking statements are qualified by these cautionary statements, and there can be no assurances that the actual results or developments will be realized or, even if substantially realized, that they will have the expected consequences or benefits to, or effect on, the Company. The information contained in this presentation is derived from management of the Company and otherwise from publicly available information and does not purport to contain all of the information that an investor may desire to have in evaluating the Company. The information has not been independently verified, may prove to be imprecise, and is subject to material updating, revision and further amendment. While management is not aware of any misstatements regarding any industry data presented herein, no representation or warranty, express or implied, is made or given by or on behalf of the Company as to the accuracy, completeness or fairness of the information or opinions contained in this presentation and no responsibility or liability is accepted by any person for such information or opinions. The forward-looking statements and information in this presentation speak only as of the date of this presentation and the Company assumes no obligation to update or revise such information to reflect new events or circumstances, except as may be required by applicable law. Although the Company believes that the expectations reflected in the forward-looking statements and information are reasonable, there can be no assurance that such expectations will prove to be correct. Because of the risks, uncertainties and assumptions contained herein, prospective investors should not read forward-looking information as guarantees of future performance or results and should not place undue reliance on forward-looking information. Nothing in this presentation is, or should be relied upon as, a promise or representation as to the future. To the extent any forward-looking statement in this presentation constitutes “future-oriented financial information” or “financial outlooks” within the meaning of applicable Canadian securities laws, such information is being provided to demonstrate the anticipated market penetration and the reader is cautioned that this information may not be appropriate for any other purpose and the reader should not place undue reliance on such future-oriented financial information and financial outlooks. Future-oriented financial information and financial outlooks, as with forward-looking statements generally, are, without limitation, based on the assumptions and subject to the risks set out above. The Company’s actual financial position and results of operations may differ materially from management’s current expectations and, as a result, the Company’s revenue and expenses. The Company’s financial projections were not prepared with a view toward compliance with published guidelines of International Financial Reporting Standards and have not been examined, reviewed or compiled by the Company’s accountants or auditors. The Company’s financial projections represent management’s estimates as of the dates indicated thereon. 2 Exploration is in Our DNA Jesus Velador Ph.D., Michael Konnert, VP Exploration Founder & CEO Doctorate in epithermal deposits. Founder & Managing Partner of Former Geologist for Fortuna Silver, Inventa Capital, raising over $800M and Director of Exploration for First since 2017. Founder of Vizsla Silver. Majestic. 25+ years experience Co-founded & sold CobaltOne Energy. 15+ years experience in corporate strategy, team leadership, and mining capital markets 3 Vizsla’s Vision – First Silver 2027 Vizsla’s vision is to become the World’s Largest Single Asset Silver Primary Producer through exploration and development of the Panuco district in Mexico Delivery on Vizsla’s Growth & De-risking Strategy Advancing through test mine development, project finance, and permitting Acquisition of Santa Fé mine operations and exploration property in the Copala–San Dimas Corridor Feasibility Study on Track for Q4 2025 Ongoing health fairs and $8M water treatment investment at Copala 4 Panuco Silver-Gold Project Existing Infrastructure • Past producing district that benefits from access to HV power, water, roads, and proximal to Mazatlán • To date, Vizsla has completed over 392,000 metres of diamond drilling without constructing a single road Fully Funded Through to Feasibility 2025 and Beyond • Vizsla is well funded with $200M+ in cash plus ITM options(2) & warrants, no debt, to fund exploration and project development through to feasibility study and beyond District Scale & 100% Owned • Applying modern exploration techniques to a newly consolidated land package that has never been systematically explored • Quadrupled land package since January 2024, now over 30k ha Location • Situated in an underexplored area of the emerging Western Mexico Silver Belt • 80km from San Dimas (1Bn+ Oz AgEq in production(1) + reserves) Expanding & De-Risking – Advancing to Production • Upgrading resources to higher confidence categories • Test mine commenced Q4 2024 to de-risk initial production • Targeting first silver in H2 2027 1. Source: First Majestic Annual Production Reports, and Cap IQ 2. See Slide Titled “Corporate Snapshot” in the appendix 5 Work Complete & Ongoing Exploration Progress Mineral Resource Growth Drilling To Date M&I Mt Inferred Mt M&I AgEq Moz Inferred AgEq Moz 250 Moz 25 Mt 391,875 979 200 Moz 20 Mt Meters Drilled to Date Holes Drilled to Date $147M $0.41/Oz (1) (1) 150 Moz 15 Mt Total Exploration Expenditures Discovery Cost 100 Moz 10 Mt LTM Discovery Drilling 50 Moz 5 Mt Moz Mt 8,000 26 New Metres Drilled New Holes Drilled Dec-2019 Dec-2020 Dec-2021 Dec-2022 Dec-2023 Dec-2024 Contained Ounces Defined Recent Discovery At Animas 46M 176.3M 138.7M 5.8 metres 653 g/t 4.26 g/t Measured AgEq Oz Indicated AgEq Oz Inferred AgEq Oz True Width Silver Gold Contained Contained Contained 1.Total exploration expenditures and discovery costs as of Jan 9th,2025. 7 Ongoing Work HLEM Survey Supports Ongoing Targeting in The West Resource Expansion • Copala & La Luisa remain open along strike to the north and down dip to the south • Napoleon (HW4) to the east, as well as three potential feeder veins located along the main Napoleon structure at depth Proximal District Scale • La Luisa North • Animas (La Pipa) • San Jack – San Peter • Camelia – San Dimas • Esmeralda-Tecolote • Galeana • Colorada-Napoleon • San Fernando – Nacaral • Jesusita – Palos Verdes Recent Discovery at Animas (Released March 31st) 5.8 metres 653 g/t 4.26 g/t True Width Silver Gold 8 Animas vein system: La Pipa ` 1. Source: Company reports, Cap IQ as of January 8th, 2025. 2. Silver equivalent is calculated using the following metals prices: Ag US$26/Oz, Au US1,975/oz, Zn US$2,646/t, Pb US$2,094/t, Cu US$8,818/t 9 3. MAG* Silver holds a 44% stake in Juanicipio, and attributable resources are based on the proportional ownership 4. M&I includes reserves Regional Geology Mexico Hosts The Largest Silver Assets In The World Panuco has the chance to become the 9th 1Boz(1) district in Mexico Arc related Hydrothermal Deposits Other Major Silver Deposits Cordilleran Belts 1. Source1: After Graybeal & Vikre, 2011, S& P Capital IQ. This slide contains information about adjacent properties on which the Company has no right to explore or mine. Readers are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on the Panuco property. Properties are classified here on a silver equivalent basis. Source2: Adapted from various sources: Ferrari et. al., 2020, Montoya et. al., 2019. Camprubí and Albinson, 2006, McDowell and Keiser, 1977, Campa and Coney, 1983. Panuco Characterized by Uplifted & Down-dropped Fault Blocks The project is centered on a 9x3 km diorite pluton that intrudes granite and volcanic rocks of the Tarahumara Formation. The veins, hydrothermal breccias, and stockworks are MRE 2025 222.4+138.7 Moz AgEq hosted by diorite, granite and andesite units of the Tarahumara formation Ignimbrites & tuffs (UVS) Mafic dykes T [Excerpt trimmed for readability. Open the original source for the complete filing or document.]
