Briefing
Updated content includes all new drill data, analytical data, Mineral Resource estimate, Mineral Reserve estimate, pit design, production schedule, permitting, operating costs, capital costs, taxes, long term gold price and the economic analysis on the Donlin Gold project (Project). Key points: Updated content includes all new drill data, analytical data, Mineral Resource estimate, Mineral Reserve estimate, pit design, production schedule, permitting, operating costs, capital costs, taxes, long term gold price; Contained gold in the process feed averages approximately 1.21 Moz/a over the LOM, while contained gold in the process feed averages 1.55 Moz/a from Year 2 to Year 9, with a maximum of 1.70 Moz in Year 6; Undiscounted techniques include total net cash flow, internal rate of return (IRR) and payback period (measured from start of production in third quarter of Year 1); Table 1 ‑ 1: Key Project Outcomes Item Unit Value Total Mined Mt 3,803 Ore Treated Mt 504.8 Life of Project 1 years 27 Strip Ratio W/O 6.5 Total Gold Recovered Moz 29.5 Gold Recovery % 90.0 Gold Payable % 99.9 Gold; The total initial capital cost estimate is $9,233 million (Table 1‑5) and total sustaining capital is $2,325 million (Table 1‑6); Table 14 ‑ 1: Process Design Basis Parameter Unit Value Annual Throughput t/a 19,527,500 Average Daily Throughput 1 t/d 53,500 Overall Plant Availability % 93 Average Nominal Feed Grade Au g/t 2.02 As ppm 2.3 S (to. This brief is based on the cited source artifact and is intended as a research entry point, not a replacement for the original source or EGM canonical data tables.
Source Notes
Updated content includes all new drill data, analytical data, Mineral Resource estimate, Mineral Reserve estimate, pit design, production schedule, permitting, operating costs,...
Extractive summary evidence · source
Contained gold in the process feed averages approximately 1.21 Moz/a over the LOM, while contained gold in the process feed averages 1.55...
Extractive summary evidence 2 · source
Undiscounted techniques include total net cash flow, internal rate of return (IRR) and payback period (measured from start of production in third...
Extractive summary evidence 3 · source
Table 1 ‑ 1: Key Project Outcomes Item Unit Value Total Mined Mt 3,803 Ore Treated Mt 504.8 Life of Project 1...
Extractive summary evidence 4 · source
Extracted Document Text
This is a readable excerpt of the EGM normalized Markdown text. It helps search engines and researchers understand PDF, filing, or company-document content while the original source remains authoritative.
# ex 909308 Source: https://www.sec.gov/Archives/edgar/data/1173420/000117184326000374/ex_909308.htm Published: 2026-01-22T00:00:00+00:00 Fetched: 2026-05-12T12:33:14.886+00:00 Source artifact: 61c8e454-cee2-4c1c-a47c-0c0d7f5318cf Normalizer input: text ## Content # ex 909308 EX-96.1 13 ex_909308.htm EXHIBIT 96.1 HTML Editor Exhibit 96.1 Donlin Gold Project Alaska, USA S-K 1300 Technical Report Summary Date and Signature Page The technical report summary entitled “S-K 1300 Technical Report Summary on the Donlin Gold Project, Alaska, USA” dated 30 November 2025 was prepared by qualified persons employed by the following third-party firms comprising mining experts: Date: 22 January 2026 “Signed ” On behalf of Wood Group USA Inc. “Signed ” On behalf of Geosyntec Consultants International, Inc. Project No.: 259219 Date and Signature Page 22 January 2026 Page 1 Donlin Gold Project Alaska, USA S-K 1300 Technical Report Summary Contents 1.0 executive SUMMARY 1-1 1.1 Introduction 1-1 1.2 Terms of Reference 1-1 1.3 Principal Outcomes 1-2 1.4 Location, Climate, and Access 1-3 1.5 Mineral Tenure and Surface Rights 1-3 1.6 Royalties 1-5 1.7 Geology and Mineralization 1-6 1.8 Exploration 1-6 1.8.1 Exploration Potential 1-7 1.8.2 Drilling 1-7 1.9 Data Verification 1-8 1.10 Metallurgical Testwork 1-8 1.11 Mineral Resource Estimates 1-8 1.12 Mineral Reserve Estimates 1-11 1.13 Mine Methods 1-12 1.14 Processing and Recovery Methods 1-12 1.15 Infrastructure 1-12 1.16 Environment, Permitting and Agreements 1-13 1.17 Capital Costs 1-13 1.18 Operating Costs 1-15 1.19 Economic Analysis 1-15 1.20 Conclusions 1-16 1.21 Risks 1-16 1.22 Recommendations 1-16 2.0 Introduction 2-1 2.1 Terms of Reference 2-1 2.2 Qualified Persons 2-1 2.3 Site Visits 2-2 2.4 Information Sources 2-4 3.0 Property Description 3-1 3.1 Location 3-1 3.2 Origin of Native Title to the Lands 3-1 3.3 Mineral Tenure 3-4 3.3.1 Calista Lease 3-4 3.3.2 Lyman Lease 3-4 3.3.3 State Mining Claims 3-5 3.4 Surface Rights 3-5 3.5 Royalties and Encumbrances 3-6 3.6 Permits 3-7 Project No.: 259219 22 January 2026 TOC i Donlin Gold Project Alaska, USA S-K 1300 Technical Report Summary 3.7 Environmental Liabilities 3-7 3.8 Significant Risk Factors 3-7 4.0 Accessibility, Climate, Local Resources, Infrastructure, and Physiography 4-1 4.1 Accessibility 4-1 4.2 Climate 4-1 4.3 Local Resources and Infrastructure 4-1 4.4 Physiography 4-2 4.5 Sufficiency of Surface Rights 4-2 5.0 History 5-1 5.1 Prior Ownership 5-1 5.2 Exploration History 5-1 6.0 Geological Setting, Mineralization, and deposit 6-1 6.1 Regional Geology 6-1 6.2 Project Geology 6-2 6.2.1 Lithologies 6-3 6.2.2 Structure 6-4 6.3 Deposit Setting 6-4 6.4 Paragenesis 6-4 6.5 Deposit Geology 6-5 6.5.1 Sedimentary Rocks 6-5 6.5.2 Igneous Rocks 6-7 6.5.3 Structure 6-8 6.6 Deposits 6-10 6.7 Mineralization 6-11 6.7.1 Vein and Disseminated Mineralization 6-11 6.8 Alteration 6-13 6.9 Minor Elements 6-13 6.10 Deposit Types 6-14 7.0 Exploration 7-1 7.1 Grids and Surveys 7-1 7.2 Geological Mapping 7-1 7.3 Geochemical Sampling 7-2 7.4 Geophysics 7-5 7.5 Excavations and Trenches 7-7 7.5.1 Legacy Excavations and Trenches 7-9 7.5.2 Recent Excavations and Trenches 7-9 7.6 Exploration Potential 7-10 7.6.1 Far Side 7-11 7.6.2 Duqum 7-11 7.6.3 Snow / Quartz 7-12 7.6.4 Dome 7-12 7.6.5 Ophir 7-13 7.7 Drilling 7-13 Project No.: 259219 22 January 2026 TOC ii Donlin Gold Project Alaska, USA S-K 1300 Technical Report Summary 7.8 Drill Methods 7-18 7.9 Geological Logging 7-18 7.10 Recovery 7-19 7.11 Collar Surveys 7-19 7.12 Down-hole Surveys 7-20 7.13 Geotechnical and Hydrogeological 7-20 7.13.1 Drilling 7-20 7.13.2 Hydrology and Hydrogeology 7-20 7.13.3 TSF Geotechnical Site Investigation 7-21 7.13.4 Laboratory Testing Program 7-22 7.14 Metallurgical Drilling 7-24 7.15 Condemnation Drilling 7-24 7.16 Twin Drilling 7-24 7.17 Summary of Drill Intercepts 7-24 8.0 Sample Preparation, Analyses, and Security 8-1 8.1 Sampling Methods 8-1 8.2 Metallurgical Sampling 8-1 8.3 Specific Gravity Determination 8-2 8.4 Analytical and Test Laboratories 8-2 8.5 Sample Preparation and Analysis 8-3 8.6 Quality Assurance and Quality Control 8-5 8.6.1 Standard Reference Materials 8-5 8.6.2 Blank Materials 8-6 8.6.3 1995-2002 Protocol 8-6 8.6.4 2005-2006 Protocol 8-7 8.6.5 2007-2010 Protocol 8-7 8.6.6 2017 Protocol 8-7 8.6.7 2020 Protocol 8-7 8.6.8 2021-2023 Protocol 8-8 8.6.9 2025 Protocol 8-8 8.7 Databases 8-8 8.8 Sample Security 8-8 8.9 QP Opinion on Sample Preparation, Security, and Analytical Procedures 8-9 9.0 Data Verification 9-1 9.1 Drill Hole Database 9-1 9.1.1 2002-2008 9-1 9.1.2 2009-2025 9-1 9.1.3 SRK Audit (2022) 9-2 9.2 Geology and Mineral Resource Data 9-2 9.2.1 Wood (2025) 9-2 9.3 Mining 9-3 9.4 Metallurgy and Mineral Processing 9-4 9.5 Infrastructure 9-4 9.5.1 Utilities, Onsite Buildings and Off-site Infrastructure 9-4 Project No.: 259219 22 January 2026 TOC iii Donlin Gold Project Alaska, USA S-K 1300 Technical Report Summary 9.5.2 Tailings and Geotechnical 9-4 9.5.3 Water Management 9-5 9.6 Environmental 9-5 9.7 QP Opinion on Data Adequacy 9-6 9.7.1 Database, Geology and Mineral Resources 9-6 9.7.2 Mining 9-6 9.7.3 Metallurgy and Mineral Processing 9-6 9.7.4 Utilities, Onsite Buildings and Off-site Infrastructure 9-6 9.7.5 Tailings and Geotechnical 9-6 9.7.6 Water Management 9-7 9.7.7 Environmental 9-7 10.0 Mineral Processing and Metallurgical Testing 10-1 10.1 Geology and Mineralogy 10-1 10.1.1 Mineralization 10-2 10.1.2 Gold Deportment 10-3 10.1.3 Mercury, Chlorine, Carbonates and Organic Carbon Deportment 10-3 10.2 Metallurgical Testwork 10-4 10.2.1 Samples 10-4 10.2.2 Comminution 10-7 10.2.2.1 2002–2003 Testwork 10-7 10.2.2.2 2004–2005 Testwork 10-8 10.2.2.3 2006 HQ Core Testwork 10-9 10.2.2.4 2006 Whole PQ Core Testwork 10-9 10.2.2.5 2007 HQ Core Testwork 10-9 10.2.2.6 Effect of Grind Size on BWI 10-10 10.2.2.7 Comminution Circuit Selection 10-11 10.2.2.8 Geostatistical Assessment 10-12 10.2.2.9 MCF2 Grinding Circuit Design Method and Capacity Definition 10-13 10.2.3 Flotation 10-14 10.2.3.1 Summary 10-14 10.2.3.2 1995-2006 Testwork 10-15 10.2.3.3 Mineralogy Summary 10-16 10.2.3.4 2006 Pilot-Plant Testing 10-16 10.2.3.5 Bench Testing of MCF2 Flowsheet 10-17 10.2.3.6 2007 Pilot-Plant Testing 10-18 10.2.3.7 2007 Variability Testing 10-18 10.2.3.8 Effect of Geological Oxidation on Flotation Performance 10-20 10.2.3.9 Flotation Circuit Scale-up and Modeling 10-20 10.2.3.10 2018 Bench Flotation Testwork 10-20 10.2.4 Pressure Oxidation 10-22 10.2.4.1 Chemistry of Pressure Oxidation and Hot Cure 10-22 10.2.4.2 2004 Batch Autoclave Testing 10-22 10.2.4.3 2006 Batch Autoclave Testing 10-24 10.2.4.4 2006 Pilot-Plant Testing 10-25 Project No.: 259219 22 January 2026 TOC iv Donlin Gold Project Alaska, USA S-K 1300 Technical Report Summary 10.2.4.5 2007 Phase 1 Pilot-Plant Testing 10-25 10.2.4.6 Phase 2 Pilot-Plant Testing 10-26 10.2.5 Neutralization 10-29 10.2.5.1 Summary 10-29 10.2.5.2 2004 Neutralization Testwork 10-30 10.2.5.3 2005 Neutralization Testwork 10-30 10.2.5.4 2006 Preliminary Batch Neutralization Testing 10-30 10.2.5.5 2006 Pilot Neutralization 10-30 10.2.5.6 2007 Neutralization Phase 1 Bench Testing 10-31 10.2.5.7 2007 Neutralization Phase 1 Pilot Testing 10-31 10.2.5.8 2007 Neutralization Phase 2 Pilot Testing 10-33 10.2.5.9 2007 Neutralization Variability Testing 10-35 10.2.6 Carbon-in-Leach 10-36 10.2.6.1 Summary 10-36 10.2.6.2 Key Metallurgical Aspects of Planned Donlin CIL Circuit 10-36 10.2.6.3 2006 CIL of Flotation Tails 10-37 10.2.6.4 2006 CIL Optimization Testwork 10-37 10.2.6.5 2007 CIL Pilot-Plant Testing 10-37 10.2.6.6 2007 CIL Optimization Testwork 10-39 10.2.6.7 Cyanide Detoxification Testwork 10-39 10.2.7 Thickening and Counter-Current Decantation Washing 10-40 10.2.8 Tailings Neutralization Capacity 10-40 10.3 Recovery Estimates 10-41 10.3.1 Flotation 10-41 10.3.2 Pressure Oxidation 10-44 10.3.3 Overall Plant Gold Recovery 10-44 10.4 Deleterious Elements 10-44 10.5 QP Opinion on Data Adequacy 10-45 11.0 Mineral Resource Estimates 11-1 11.1 Summary 11-1 11.2 Database 11-1 11.3 Geologic Models 11-1 11.4 Exploratory Data Analysis 11-3 11.5 Density Assignment 11-4 11.6 Grade Capping/Outlier Restrictions 11-4 11.7 Composites 11-5 11.8 Block Model Set Up 11-5 11.9 Indicator Estimation 11-6 11.10 Estimation Methods 11-6 11.11 Classification of Waste Rock Management Categories 11-7 11.12 Validation 11-9 11.13 Classification 11-15 11.13.1 Uncertainties Considered During Confidence Classification 11-16 11.14 Reasonable Prospects for Eventual Economic Extraction 11-16 Project No.: 259219 22 January 2026 TOC v Donlin Gold Project Alaska, USA S-K 1300 Technical Report Summary 11.14.1 Cut-off Determination 11-17 11.15 Mineral Resource Statement 11-18 11.16 Factors that May Affect the Mineral Resource Estimate 11-18 12.0 Mineral Reserve Estimates 12-1 12.1 Modifying Factors 12-1 12.1.1 Summary 12-1 12.1.2 Dilution and Mine Loss 12-2 12.1.3 Metallurgical Recovery 12-4 12.1.4 Gold Price Forecast 12-4 12.1.5 Pit Slopes 12-5 12.2 Cut-off Determination 12-8 12.3 Mineral Reserve Statement 12-9 12.4 Factors that May Affect the Mineral Reserve Estimate 12-10 13.0 Mining Methods 13-1 13.1 Throughput Considerations 13-1 13.2 Geotechnical Considerations 13-1 13.2.1 Site Investigations 13-1 13.2.2 Model Development 13-2 13.2.2.1 Geologic Model 13-2 13.2.2.2 Structural Model 13-2 13.2.2.3 Rock Mass and Geotechnical Properties 13-3 13.2.2.4 Slope Stability Analysis 13-4 13.2.2.5 Pit Slope Design Criteria 13-4 13.3 Pit Phases 13-5 13.4 Pit Design Parameters 13-6 13.5 Production Schedule 13-8 13.5.1 Planned Production Schedule 13-8 13.5.2 Pit-Phase Mining Rates 13-8 13.5.3 Mine Production Plan 13-9 13.5.4 Process Feed Plan 13-13 13.6 Ore Stockpiles 13-13 13.7 Waste Rock Facilities 13-14 13.8 Water Management 13-15 13.9 Blasting and Explosives 13-16 13.10 Mining Equipment 13-17 13.10.1 Drilling 13-18 13.10.2 Loading 13-18 13.10.3 Hauling 13-18 13.10.4 Secondary Fleet 13-18 13.10.5 Support Equipment 13-19 13.11 Work Schedule 13-20 13.11.1 Personnel Requirements 13-20 14.0 processing and recovery Methods 14-1 Project No.: 259219 22 January 2026 TOC vi Donlin Gold Project Alaska, USA S-K 1300 Technical Report Summary 14.1 Plant Design 14-1 14.1.1 General 14-1 14.1.2 Crushing and Coarse Ore Stockpile 14-3 14.1.3 Grinding and Pebble Crushing 14-3 14.1.4 Flotation 14-4 14.1.5 Thickening, Concentrate Storage, Acidulation, and CCD Washing 14-5 14.1.6 Autoclave Plant 14-6 14.1.7 Counter Current Decantation Pressure Oxidization Thickening and Washing 14-8 14.1.8 Flotation Tailings Neutralization 14-8 14.1.9 Solids Carbon-in-Leach Neutralization 14-9 14.1.10 Carbon-in-Leach Cyanidation Circuit 14-9 14.1.11 Cyanide Destruction System 14-10 14.1.12 Carbon Elution, Electrowinning, Reactivation, and Gold Refining 14-10 14.1.13 Mercury Abatement Systems 14-11 14.2 Reagents 14-13 14.2.1 Lime 14-13 14.2.2 Sulfur Dioxide 14-14 14.3 Process Services 14-14 14.3.1 Air and Gaseous Oxygen 14-14 14.3.2 Plant Water Distribution 14-14 14.3.3 Power Requirements 14-16 14.4 Personnel Requirements 14-16 15.0 Infrastructure 15-1 15.1 Summary 15-1 15.2 Access and Logistics 15-1 15.2.1 Port-to-Mine Access Road 15-1 15.2.2 Road Construction 15-3 15.2.3 Airstrip 15-3 15.2.4 Cargoes 15-4 15.2.5 Fuel 15-4 15.3 Plant Site Facilities 15-4 15.4 Camps and Accommodation 15-6 15.5 Waste Rock Facilities 15-7 15.5.1 Location 15-7 15.5.2 Acid-base Accounting 15-7 15.5.3 Geotechnical Design 15-8 15.6 Tailings Storage Facilities 15-8 15.6.1 Site Geology 15-8 15.6.2 Seismicity 15-9 15.6.3 Geotechnical Site Investigation and Laboratory Testing 15-10 15.6.4 TSF Design 15-10 15.6.4.1 Design Criteria 15-10 15.6.4.2 Inflow Design Flood 15-10 15.6.4.3 Foundation Stability 15-10 Project No.: 259219 22 January 2026 TOC vii Donlin Gold Project Alaska, USA S-K 1300 Technical Report Summary 15.6.4.4 Configuration 15-11 15.6.4.5 Seep [Excerpt trimmed for readability. Open the original source for the complete filing or document.]