Monthly Source Brief Archive
September 2026 Gold and Silver Miner Source Briefs
Public Source Briefs published or generated for September 2026. These monthly archives are crawlable discovery pages that point into the individual source summaries and original evidence.
September 2026 Briefs
ESGold Intersects Multiple Sulphide-Bearing Intervals as Montauban Drilling Surpasses 2,000 MetresESGold Corp · 2026-09-24As of September 15, 2026, ESGold had advanced 19 drill holes for a cumulative total of approximately 2,030 metres, marking an important milestone in the Company’s 2026 exploration program.
2025 NI 43-101ESGold Corp · 2026-09-30Table 25-3: Results of the economic analysis of the Montauban tailings Project Economic Indicator Pre-Tax After-Tax NPV (5% discount rate) $14.08M $6.99M IRR 42.6% 23.4% Payback period 2.8 years 1.8 years * The economic
Wallbridge Reports Results from 2026 Fenelon PFS Metallurgical Drilling ProgramWallbridge Mining Company Limited · 2026-09-30These results provide further confidence in the geological and grade continuity of the deposit while delivering the high quality of sample material needed to better characterize gold recovery characteristics and metallur
Fenelon Gold Project- 2026 PFS Metallurgical Drilling Assay Summary and Drill Hole Location InformationWallbridge Mining Company Limited · 2026-09-30562.0 564.0 2.0 16.80 * 564.0 566.0 2.0 1.51 566.0 568.8 2.8 0.22 * 568.8 569.3 0.5 19.40 569.3 576.0 6.7 0.80 576.0 585.0 9.0 0.07 * 585.0 587.0 2.0 9.21 FAL-26-002A 587.0 595.0 8.0 0.32 Fenelon Project 2026 PFS Metallu
Corporate DeckGreenland Mines Ltd · 2026-09-30Excluding Inferred resources yield pre-tax NPV8 US$1,489 million, after-tax NPV8 US$1,074 million. • Strong mid- and downstream partner: Neo Performance Materials retains offtake rights on up to 60% of production, feedin
Download Our 2-PagerTerra Rossa Gold Ltd. · 2026-09-30Past Exploration Select historic drill intercepts 9.28m @ 11.62g/t Au & 2.45g/t Ag 4.78m @ 5.91g/t Au & 218.3g/t Ag 3.37m @ 19.83g/t Au & 10.6g/t Ag 2.10m @ 6.31g/t Au & 11.5g/t Ag 2023 Underground Channel 2025 Undergrou
PresentationTerra Rossa Gold Ltd. · 2026-09-304 TERRA ROSSA GOLD Located alongside a Multimillion oz Deposit Soto Norte California 7.8km Soto Norte Factsheet1 M&I Resources: 7.0Moz Au M&I Grade: 5.55g/t Au Avg Gold Production: 203koz Au Throughput: 3,500tpd LOM Prod
NI 43-101Greenland Mines Ltd · 2026-09-30Table 1-3: Proposed Phase II Program Major Precious Metals Corp. – Skaergaard Project Estimated Cost Item / Detail (C$000) Environment and Social Baseline Studies 500 Additional Resource and HQ Metallurgical Diamond Dril
2025 Annual ReportDPM Metals Inc. · 2026-09-30The new rates will become applicable to Chelopech upon renewal of its concession agreement in 2029. (3) 2026 cash cost per tonne of ore processed for Vareš is calculated based on gross operating costs, prior to pre-comme
MANAGEMENT’S DISCUSSION AND ANALYSISCHINA GOLD INTERNATIONAL RESOURCES · 2026-09-30CSH Mine: • It is expected that the gold production range will be 77,162 ounces to 83,592 ounces (approximately 2.4 tonnes to 2.6 tonnes) in 2025.
MANAGEMENT’S DISCUSSION AND ANALYSISCHINA GOLD INTERNATIONAL RESOURCES · 2026-09-30The updated Mineral Resource significantly expands the Project’s scale and development potential, providing a robust foundation for future production expansion, mine life extension and further technical studies on larger
28th Jul 2025 FY2024-25 June Quarterly Activities Report 28th Jul 2025Perseus Mining Limited · 2026-09-30Site works are accelerating and are on-budget and on schedule, consistent with the target of first gold production in January 2027. • Outstanding infill drilling results at NGP have Perseus on target for a Mineral Resour
27th Oct 2025 FY2025-26 September Quarterly Activities Report 27th Oct 2025Perseus Mining Limited · 2026-09-30Compared to the previous quarter, gold production was in line with expectations, decreasing 3% despite higher head grade (Q1 FY26, 1.33g/t against Q4 FY25, 1.12g/t) while weighted average AISC increased 6%.
Condensed Interim Financial Statements ofWallbridge Mining Company Limited · 2026-09-30If the results from either Wallbridge’s or NorthX’s exploration work in the Gold Cooperation Area establish a mineral resource that consists of primary gold mineralization, then the parties will form a joint venture in w
CONSOLIDATED FINANCIAL STATEMENTSESGold Corp · 2026-09-30Provisions are measured at the present value of the expenditures expected to be required to settle the obligation using a pre-tax rate that reflects current market assessments of the time value of money and the risk spec
corporate presentationHycroft Mining · 2026-09-30This corporate presentation from Hycroft Mining (HYMC) provides an overview of the company's gold and silver resources, recent high-grade discoveries, financial position, management team, and development plans. It highli
Fortuna Mining source documentFortuna Mining · 2026-09-30Gold production in the fourth quarter totaled 128 ounces with an average head grade of 0.11 g/t. The cash cost per silver equivalent ounce sold in the fourth quarter of 2024, was $16.53 compared to $13.42 in the same p
Management’s Discussion and Analysis For the year ended June 30, 2025ESGold Corp · 2026-09-3012 Management’s Discussion and Analysis For the year ended June 30, 2025 including geologic and other technical information, history of conversion of mineral deposits with similar characteristics to its own properties to
2nd Quarter Financial Statements 2nd Quarter Management Discussion & Analysis 1st Quarter Financial Statements 1st Quarter Management Discussion & Analysis FrançaisWallbridge Mining Company Limited · 2026-09-30La majeure partie de la propriété Martinière est assujettie à une redevance de 2 % calculée à la sortie de la fonderie qui sera payable lorsque la production commerciale commencera. c) Grasset (Québec) La société détient
Reserves and ResourcesSSR Mining Inc. · 2026-09-30Proven and probable Mineral Reserves are based on extensive drilling, sampling, geological modeling, and metallurgical testing from which economic feasibility has been determined.
HSLV Q4 2025 Interim Financial StatementsHighlander Silver Corp. · 2026-09-30Mineral property interests Exploration and evaluation expenditures relate to costs incurred in the search for mineral resources, the determination of technical feasibility and the assessment of commercial viability of an
HSLV Financial Statements Q3 2025Highlander Silver Corp. · 2026-09-30Mineral property interests Exploration and evaluation expenditures relate to costs incurred in the search for mineral resources, the determination of technical feasibility and the assessment of commercial viability of an
WMCL Management's Discussion and Analysis Q1 2026Wallbridge Mining Company Limited · 2026-09-30At Fenelon, approximately 2,000 to 3,000 metres of drilling is being targeted on portions of the mineral resource included within the conceptual PEA life-of-mine plan to further evaluate gold recoveries and complete othe
MANAGEMENT’S DISCUSSION AND ANALYSISWallbridge Mining Company Limited · 2026-09-30The total cost of the PFS is estimated to be approximately $55 million (excludes corporate, general and administrative, and investor relations and capital).
24 Aug 2026 2026 Climate ReportEvolution Mining Ltd · 2026-09-30In FY26, our mines produced 715koz of gold and 66kt of copper at an all-in sustaining cost (AISC) of $1,717 per ounce of gold – continuing to place Evolution as one of the lowest cost producers globally.2 Our purpose Our
HSLV Q4 2025 Interim Management's Discussion and AnalysisHighlander Silver Corp. · 2026-09-30It is within the prolific Miocene polymetallic belt, approximately 34 km NNE of the Julcani Mine, which has produced over 105 million ounces of silver from high grade vein mineralization averaging 16 ounces per ton since
HSLV Management's Discussion and Analysis Q3 2025Highlander Silver Corp. · 2026-09-30Exploration Expenses (Restated) As disclosed in Note 3 of the Company’s condensed consolidated interim financial statements for the three and nine months ended June 30, 2025, the Company has voluntarily changed its accou
Financial Results: Q1 2026Eldorado Gold · 2026-09-30Q1 2026 HIGHLIGHTS • Q1 payable production: 15,394 oz on lower grade, partly offset by higher throughput. • Costs: total cash costs(1) $2,208/oz sold; AISC(1) $2,528/oz sold (higher royalties and fewer ounces sold). • 20
SSR Mining Inc. source documentSSR Mining Inc. · 2026-09-30SSR MINING | PAGE 12 The following table provides a reconciliation of our projected cost of sales to projected cash costs and projected AISC used in the calculation of full-year projected 2026 cost guidance: (operating g
20th Feb 2026 2026 Half Year Report 20th Feb 2026Perseus Mining Limited · 2026-09-30The AISC was higher than the previous period mainly due to expected decrease in high grade material available, higher royalties and timing related increases in sustaining capital largely as a result of the timing of the
financial statements, including the notes thereto (the "Unaudited Pro Forma Financial Statements") have been prepared basedSSR Mining Inc. · 2026-09-30They are not intended to be a complete presentation of the Company’s financial position or results of operations had the Transaction occurred as of and for the periods indicated.
SSR Mining Inc. source documentSSR Mining Inc. · 2026-09-30Three Months Ended March 31, Operating Data 2026 2025 Gold produced (oz) 6,286 26,001 Gold sold (oz) 6,137 26,000 Ore mined (kt) 81 82 Ore milled (kt) 76 90 Gold mill feed grade (g/t) 3.00 9.00 Gold recovery (%) 93.7 97.
FORTUNA MINING CORP._December 31, 2024 CONSOLIDATED FINANCIAL STATEMENTS For the years ended December 31, 2024 and 2023 Fortuna Mining · 2026-09-30The conversion factors used in our 2024 life-of-mine plans were 90 % (2023: 90 % ) at Caylloma, 100 % (2023: 100 % ) at Yaramoko, and 100 % (2023: 100 % ) at Séguéla . The percentage of inferred resources included as a
FORTUNA MINING CORP._December 31, 2025 CONSOLIDATED FINANCIAL STATEMENTS For the years ended December 31, 2025 and 2024 Fortuna Mining · 2026-09-30This non-cash consideration in the form of a right was initially classified as a financial asset measured at fair value through profit or loss of $ 11.7 million.
Fortuna Mining source documentFortuna Mining · 2026-09-30See “Non-IFRS Measures - All-in Sustaining Cash Cost per Ounce of Gold Equivalent Sold” for additional information Health & Safety During the fourth quarter, the Company recorded zero lost time injuries, one restricted
First Mining Reports 5.26 g/t Au over 19.55 m as Drilling Expands Miroir Discovery at the Duparquet ProjectFirst Mining Gold · 2026-09-09In addition, drill hole DUP26-092 returned 3.33 g/t Au over 5.0 m, including 7.20 g/t Au over 1.0 m, and validated an extension of the mineralization towards the west and at depth (See Table 1 and 3 for details).
First Mining Announces Inclusion into the GDXJFirst Mining Gold · 2026-09-13This is a modified market cap-weighted index, and only includes companies that generate at least 50% of their revenue from gold or silver mining, or at least 50% of their mining mineral resources are from gold or silver.
Annual Results Announcement for the Year Ended 31 December 2025Wanguo Gold Group Limited · 2026-09-30The budgeted production plan and the estimated metallic resources of Xizang Changdu had been determined based on the management’s expectation for the market development, feasibility study of the above mine which was prep
Interim Report 2026Wanguo Gold Group Limited · 2026-09-30Wanguo Gold Group Limited Interim Report 2026 15 Management Discussion and Analysis In the first half of 2026, a total of 5,050,455 tonnes of ore was extracted and stripped, comprising 3,162,287 tonnes of ore stripped, a
Annual Report 2025Wanguo Gold Group Limited · 2026-09-30The budgeted production plan and the estimated metallic resources of Xizang Changdu had been determined based on the management’s expectation for the market development, feasibility study of the above mine which was prep
Condensed Interim Consolidated Financial StatementsFirst Mining Gold · 2026-09-30In connection with this transaction, Bellavista has indicated its intention to exercise the PC Gold buydown right to increase their ownership to 80% of the Project by paying $3.0 million in cash, subject to completion of
Near Surface Drilling Continues to Expand and Confirm Gold MineralizationRPX Gold Inc. · 2026-09-30The 1-kilogram metallic screen assay method is selected for samples anticipated to contain coarse gold and when the original fire-assay returns results greater or equal to 2.25 g/t Au.
Drilling Intersects 9.03 g/t gold over 14.00 m core length, further supporting Open Pit PotentialRPX Gold Inc. · 2026-09-30The 1-kilogram screen assay method is selected for samples anticipated to contain coarse gold and when the fire-assay-AA finish return results greater or equal to 2.25 g/t Au.
Drilling Intersects 7.76 g/t Gold Over 15.49 m in Potential Open Pit Area & Commences Updated Independent Resource EstimateRPX Gold Inc. · 2026-09-30The 1-kilogram metallic screen assay method is selected for samples anticipated to contain coarse gold and when the original fire-assay returns results greater or equal to 2.25 g/t Au.
Red Pine Commences Surface Trenching and Sampling Program in Potential Open Pit Areas at Wawa Gold ProjectRPX Gold Inc. · 2026-09-30The 1-kilogram metallic screen assay method is selected for samples anticipated to contain coarse gold and when the original fire-assay returns results greater or equal to 2.25 g/t Au.
Agnico Eagle Mines Limited source documentAgnico Eagle Mines Limited · 2026-09-30This MD&A also contains information as to estimated future total cash costs per ounce, AISC per ounce and minesite costs per tonne.
Xali Gold Advances PEA Team and Updated Resource and Development Programs at Pico Machay in PeruXali Gold Corp. · 2026-09-30Results from that program included 2.92 grams per tonne (“g/t”) gold (“Au”) over 31.5 m from Surface Channel 1, including 13.76 g/t Au over 4.5 m, within the historical resource area.
VZLA Corp Deck (September 2026)Vizsla Silver · 2026-09-30LOM Payable AgEq $238.7M 7 Months 425 g/t Initial Capital Cost (US$) Payback LOM Head Grade AgEq $287M $10.61/oz $85.11 Sustaining Capital (US$) AISC – US$/Oz AgEq OpEx US$/t milled 1.
Xali Gold Files Technical Report on the Pico Machay Gold Project in PeruXali Gold Corp. · 2026-09-30Between 2005 and 2009, Aquiline and others completed various engineering studies including resource estimations and metallurgical testwork on Pico Machay.
Hycroft Provides Project UpdateHycroft Mining · 2026-09-30Diane Garrett, Executive Chairman and CEO, commented: “We are progressing underground development planning at Brimstone and Vortex, completing trade-off study results between pressure oxidation and roasting for the broad
Management’s Discussion and Analysis of FinancialAya Gold & Silver · 2026-09-30The updated mine plan released in Q4-2025 extends the operation’s life to 2036, supporting an average annual production profile of approximately 6 Moz of silver over the life of mine (“LOM”).
i-80 Gold Announces Positive Preliminary Economic Assessment oni-80 Gold Corp. · 2026-09-30Mineral Point PEA Highlights Mineral Estimates, Production and Mine Life Large open pit heap leach gold mine with a life of mine (“LOM”) of approximately 17 years. Annual gold equivalent production(1) of approximatel
i-80 Gold Announces Positive Preliminary Economic Assessment oni-80 Gold Corp. · 2026-09-30PEA Highlights Mineral Estimates, Production and Mine Life • High-grade underground gold mine with a life of mine (“LOM”) of approximately 10 years. • Average annual gold production of approximately 100,000 ounces of gol
new found gold provides queensway and pine cove up 15322New Found Gold · 2026-09-16As outlined in the Queensway PEA, Phase 1 has an initial capital cost of $155M for an average annual production of 69.3 thousand ounces of gold at an all-in sustaining cost (“ AISC ”) [2] of US$1,282 per ounce of gold fr
Agnico Eagle Mines Limited source documentAgnico Eagle Mines Limited · 2026-09-30The development stage of a mine commences when the technical feasibility and commercial viability of extracting the mineral resource has been determined.
WHEATON PRECIOUS METALS 2025 ANNUAL REPORT - FINANCIAL STATEMENTS [24] Notes to the Consolidated Financial Statements Years Ended December 31, 2025 and 2024 (US Dollars)Wheaton Precious Metals Corp. · 2026-09-302) The Company’s position, as reflected in its filed Canadian income tax returns and consistent with the terms of the PMPAs, is that the cost of the precious metal acquired under the Canadian PMPAs is equal to the market
Agnico Eagle Mines Limited source documentAgnico Eagle Mines Limited · 2026-09-30The Company applied NAV multiples to the NPV of CGUs that it judged to be appropriate. 52 AGNICO EAGLE MINES LIMITED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Continued) (thousands of United States dollars, except sh
WHEATON PRECIOUS METALS 2024 ANNUAL REPORT - FINANCIAL STATEMENTS [25] Notes to the Consolidated Financial Statements Years Ended December 31, 2024 and 2023 (US Dollars)Wheaton Precious Metals Corp. · 2026-09-304) The Company’s position, as reflected in its filed Canadian income tax returns and consistent with the terms of the PMPAs, is that the cost of the precious metal acquired under the Canadian PMPAs is equal to the market
Agnico Eagle Mines Limited source documentAgnico Eagle Mines Limited · 2026-09-30This MD&A also contains information as to estimated future total cash costs per ounce, AISC per ounce and minesite costs per tonne.
WHEATON PRECIOUS METALS 2023 ANNUAL REPORT - FINANCIAL STATEMENTS [4 6 ] Notes to the Consolidated Financial Statements Years Ended December 31, 2023 and 2022 (US Dollars)Wheaton Precious Metals Corp. · 2026-09-304) The Company’s position, as reflected in its filed Canadian income tax returns and consistent with the terms of the PMPAs, is that the cost of the precious metal acquired under the Canadian PMPAs is equal to the market
WHEATON PRECIOUS METALS 2022 ANNUAL REPORT - FINANCIAL STATEMENTS [24] Notes to the Consolidated Financial Statements Years Ended December 31, 2022 and 2021 (US Dollars)Wheaton Precious Metals Corp. · 2026-09-304) The Company’s position, as reflected in its filed Canadian income tax returns and consistent with the terms of the PMPAs, is that the cost of the precious metal acquired under the Canadian PMPAs is equal to the market
Condensed Consolidated Interim Financial StatementsEndeavour Silver Corp · 2026-09-30The transaction includes upfront consideration of (i) cash of $30.0; (ii) 36.9 million common shares of Guanajuato Silver, measured at their fair value of $20.2 based on the quoted share price of C$0.76 per share at the
INVESTOR PRESENTATION • September 2026K92 Mining Inc · 2026-09-30Amongst The Highest Grade, Lowest Cost Operating Mines Globally TSX: KNT OTCQX: KNTNF Proven and Probable Reserves (>1 Moz Contained Ounces) and AISC (US$/oz Au) Judd 1365 Level Operation 1 Company Reserve Grade 2025 Gra
Management’s Discussion & AnalysisEndeavour Silver Corp · 2026-09-30Terronera Guanaceví Kolpa Consolidated Direct operating costs per tonne $/t $130 - $140 $180 - $190 $130 - $140 $140 - $150 Direct costs per tonne $/t $150 - $160 $290 - $300 $140 - $150 $170 - $180 Cash costs, net of by
Corporate Presentation - September 2026Northern Star Resources Ltd · 2026-09-30FY27 Group guidance FY27 GUIDANCE UNITS KALGOORLIE YANDAL POGO1 TOTAL Gold Sold koz 850-970 400-420 250-260 1,500-1,650 AISC A$/oz 2,800-3,300 3,900-4,200 US$1,850-1,950 3,050-3,450 Sustaining Capital A$M 850-9152 Growth
NI 43-101 Technical Report & Preliminary Economic AssessmentFIREFLY METALS LTD · 2026-09-30Over the first 23 months (payback period) of the mine plan, inferred resources in the mine plan account for 11% of the scheduled mine production tonnage.
Report – Financial Report and Commentary 6 months to 30 June 2026Serabi Gold plc · 2026-09-30The current plans assume that during 2026 the Group will continue gold production from its Palito Complex operation and current production from the Coringa mine without interruption, assuming that the GUIA licence issued
americas gold and silver announces some of the best grade widths drilled to date at the cosala complex including high gradeAmericas Gold & Silver · 2026-09-17Today’s results are highlighted by hole SR583, which intersected a true thickness of 20.5 meters grading 654.7 g/t Ag and 1.5% Cu.
Annual Report 2025/2026GT Gold Holdings Limited · 2026-09-30Present 來現金流量之現值。現值按反映貨幣之 values are computed using pre-tax discount rates that 時間價值及資產╱現金產生單位(已計 reflect the time value of money and the risks specific to 量減值)之特定風險之稅前折現率計算。 the asset/cash-generating unit whose impairme
Riverside Resources Intersects Near-Surface Gold and Base Metal Mineralization at Union Norte and Advances Multiple Targets for Phase 2B DrillingRiverside Resources Inc. · 2026-09-0909, 2026 (GLOBE NEWSWIRE) -- Riverside Resources Inc. ("Riverside" or the "Company") (TSX-V: RRI) (OTCQB: RVSDF) (FSE: 5YY0), is pleased to report the assay results from the Phase 2A summer 2026 core drilling campaign fo
Dakota Gold reports positive metallurgical test program resultsDakota Gold Corp. · 2026-09-30Results were generated from a PFS dataset using 24 master-composite column tests that cover the principal lithologic, grade, and oxidation domains at crush sizes of 0.5-inch (12.7 millimeters) and 1-inch (25.4 millimeter
9 Sep PAN GLOBAL INTERSECTS 15 METERS OF 3.9 g/t GOLD FROM SURFACE, CÁRMENES PROJECT, SPAINPan Global Resources Inc. · 2026-09-08The results continue to demonstrate that gold and copper-nickel-cobalt mineralization from surface extends beyond the historical Providencia mine workings, within a large, multiphase hydrothermal breccia system favourabl
RPX Drilling PressRelease 20260527RPX Gold Inc. · 2026-09-30These new assay results will be included in the updated mineral resource estimate (“MRE””) planned for later this year and will be reflected in the prefeasibility study (“PFS”) targeted for H1 2027.
Environmental & Social Responsiblity ApproachNorthern Star Resources Ltd · 2026-09-3017 FY26 Voluntary Environment & Social Responsibility Disclosure Suite Northern Star Resources Ltd FY26 18 1 | Environment & Social Responsibility Approach K or k Thousand Operations Mining, exploration and mineral proce
Artemis Gold Announces Record Q4 2025 Production Results and 2026 GuidanceArtemis Gold Inc. · 2026-09-301 2026 Production and Cost Guidance 2026 Guidance Gold production (oz) 265,000 - 290,000 AISC1 (US$/oz sold) 925 - 1,025 Sustaining capital ($ millions) 5 Resource expansion and exploration ($ millions) 15-20 Growth capi
Second Quarter 2025 ReportDPM Metals Inc. · 2026-09-30SECOND QUARTER I 8 The Company’s detailed guidance for 2025 is set out in the following table: Corporate Consolidated $ millions, unless otherwise indicated Chelopech Ada Tepe and Other Guidance Ore processed Kt 2,090 -
First Quarter 2025 ReportDPM Metals Inc. · 2026-09-30FIRST QUARTER I 10 Cash cost measures Cash cost per tonne of ore processed in the first quarter of 2025 was higher than 2024, due primarily to lower volumes of ore processed, partially offset by lower royalties reflectin
Artemis Gold Announces Record Q2 2026 Production ResultsArtemis Gold Inc. · 2026-09-30The plant processed 1.34 million tonnes during the quarter, with feed grades averaging 1.86 g/t gold and gold recoveries reaching a record 92.2% as a result of continued process optimization.
Artemis Gold Announces Q1 2026 Production ResultsArtemis Gold Inc. · 2026-09-30The plant processed 1.32 million tonnes and feed grades remained strong averaging 1.59 g/t gold during the quarter, helping to offset reduced throughput due to unplanned maintenance including a 7-day unplanned shutdown i
Artemis Gold Reports Record Financial and Operating Results for Q2 2026Artemis Gold Inc. · 2026-09-30After finalizing the scope, including adding additional spares, Phase 1A is now expected to be completed at a capital cost of $120 million, representing a low capital intensity of $60 per additional annual tonne of proce
RPX Drilling PressRelease July14 2026RPX Gold Inc. · 2026-09-30With two rigs now active, we are well positioned to accelerate our fully-funded 20,000 m drill program and move efficiently toward an updated mineral resource estimate and PFS. “Our immediate focus is completing the reso
JUN 23, 2026 Metalla Publishes 2026 Asset Handbook And Annual Letter To Shareholders PRESS RELEASE VIEWMetalla Royalty & Streaming Ltd. · 2026-09-30The Company’s operating partners have added considerable value through exploration and development, which the Company believes will continue to unlock significant potential through new discoveries, reserve and resource a
Vista Gold Announces 2025 Financial ResultsVista Gold · 2026-09-30The completion of the new Mt Todd Feasibility Study in July 2025 was a defining moment for the Mt Todd gold project and Vista.
interim statements should be read in conjunction with the Company’s Consolidated Financial StatementsVista Gold · 2026-09-30On July 29, 2025, the Company announced the results of a new Mt Todd feasibility study focused on developing a 15,000 tonnes per day (“tpd”), or 5.3 million tonnes per annum (“tpa”), operation (the “Mt Todd FS” or the “S
interim statements should be read in conjunction with the Company’s Consolidated Financial StatementsVista Gold · 2026-09-30Mt Todd Feasibility Study Highlights The Study, which focused on a smaller initial, but scalable project resulted in a significant reduction in initial capital and has been adopted as the basis for the Company’s plans to
Financial ResultsOceanaGold Corporation · 2026-09-30On Track to Deliver 2026 Guidance H2 production expected to increase, AISC expected to decrease H1 GOLD PRODUCTION H1 COPPER PRODUCTION H1 TOTAL CAPITAL INVESTMENT2 269 koz 5.9 kt $309M 48%1 42%1 48% GUIDANCE GUIDANCE GU
Financial ResultsOceanaGold Corporation · 2026-09-30Such risks include, among others: the risk of not achieving OceanaGold’s production estimates, forecasts or 2026 Guidance; inaccuracy of Mineral Reserves, Mineral Resources and operating and capital cost estimates; the a
Quarterly Activity Report – 30 June 2025Emerald Resources Nl · 2026-09-30Shannon Campbell, Chief Financial Officer Feasibility, Development and Growth Dingo Range Gold Project, Western Australia (EMR 100%) Company Highlights ▪ Updated Dingo Range Gold Project Measured, Indicated and Inferred
Half Year Report 2019Emerald Resources Nl · 2026-09-30Table 3| Revised DFS Economics1 Ore Reserve 14.3Mt @ 2.0g/t gold for 907koz contained LOM Strip Ratio (waste t : ore t) 5.8:1 Throughput 2.0Mtpa Life of Mine 7.2 years Processing Recovery 84% Recovered Ounces 762koz Aver
Quarterly Activity Report – 31 December 2024Emerald Resources Nl · 2026-09-30Gold Production ▪ Okvau Gold Mine commissioned on time “Record gold production was achieved at our 100% owned Okvau Gold Mine, with 31,888 ounces on budget in 2021; produced, exceeding guidance with recoveries >85%, abov
Management’s Discussion and AnalysisOrezone Gold Corp · 2026-09-30Orezone has recently re-initiated exploration drilling at Casa Berardi with the objective of re-establishing the mine’s high-grade underground stope inventory, in support of increasing both production rates and overall l
Quarterly Report June 2026Alkane Resources Ltd · 2026-09-30Alkane Resources Limited – 30 June 2026 Quarterly Report P a g e |2 GROUP SUMMARY STATUTORY REPORTING PERIOD1,2 Gold-Antimony Production Alkane produced 40,949 ounces of gold and 456 tonnes of antimony in Q4 FY26, result
Annual Financial Report for the year ended - 30 June 2026Alkane Resources Ltd · 2026-09-30Tomingley produced 82,973 ounces of gold in FY26 (2025: 70,120 ounces), exceeding production guidance of 75,000 to 80,000 ounces and setting new records for annual ounce production, ore tonnes mined from underground and
MANAGEMENT’S DISCUSSION AND ANALYSISAlkane Resources Ltd · 2026-09-30Three months ended Nine months ended (Australian dollars thousands, except where indicated) 31 March 31 March 2026 2025 2026 2025 Sustaining capital¹ Capital development 2,368 - 5,650 - Property, plant and equipment sust
Annual Report 2024Wanguo Gold Group Limited · 2026-09-30PRINCIPAL ACCOUNTING POLICIES The condensed consolidated financial statements have been prepared on the historical cost basis except for certain financial instruments which are measured at fair values, as appropriates.
Interim Report 2024Wanguo Gold Group Limited · 2026-09-30The budgeted production plan and the estimated metallic resources of Xizang Changdu had been determined based on the management’s expectation for the market development, feasibility study of the above mine which was prep
Interim Report 2026Wanguo Gold Group Limited · 2026-09-30The budgeted production plan and the estimated metallic resources of Xizang Changdu had been determined based on the management’s expectation for the market development, feasibility study of the above mine which was prep
Annual Report 2023Wanguo Gold Group Limited · 2026-09-30During the first half of 2023, the flotation plant processed a total of 721,269 tonnes of ore and produced approximately 18,441 dry metric tonnes of gold concentrates (with an average grade above 25g/t).
OceanaGold Reports Record Quarterly Net ProfitOceanaGold Corporation · 2026-09-30Second Quarter Highlights • On track to deliver full year production, cost and capital guidance. • Safely and responsibly produced 119,500 ounces of gold and 3,700 tonnes of copper. • All-In Sustaining Cost (“AISC”)† of
The Northern Miner July 2026 Read MoreVista Gold · 2026-09-30Early this year, we finished drilling to The capital cost has decreased from just a obtain core for a metallurgical testing little over US$1 billion in 2024 to US$425 program.
Orezone Gold Reports Second Quarter 2026 ResultsOrezone Gold Corp · 2026-09-30Orezone has recently re-initiated exploration drilling at Casa Berardi with the objective of re-establishing the mine’s high-grade underground stope inventory, in support of increasing both production rates and overall l
MAR 26, 2026 Metalla Reports Record 2025 Financial Results Highlighting Portfolio Inflection And Future Cash Flow Growth PRESS RELEASE VIEWMetalla Royalty & Streaming Ltd. · 2026-09-3015-Mile On January 21, 2026, St Barbara Limited (“St Barbara”) announced the results of the 15-Mile Processing Hub Prefeasibility Study, which outlined strong economics and an average production of 103 Koz of gold per ye
MAY 14, 2026 Metalla Reports Financial Results For The First Quarter Of 2026 And Provides Asset Updates PRESS RELEASE VIEWMetalla Royalty & Streaming Ltd. · 2026-09-30On January 21, 2026, St Barbara announced the results of the 15-Mile Processing Hub Prefeasibility Study, which outlined strong economics and an average production of 103 Koz of gold per year over an 11-year mine life.
Management's Discussion and AnalysisOsisko Gold Group Inc. · 2026-09-30Management's Discussion and Analysis For the three months ended March 31, 2026 Cariboo Gold Project 2025 FS – Project Operating and Financial Metrics Assumptions Units 2025 FS – Base Case1 Gold price US$/oz 2,400 Exchang
AUGUST 13, 2026 PRESS RELEASE Metalla Reports Record Financial Results for the Second Quarter of 2026 and Provides Asset Updates AranzazuMetalla Royalty & Streaming Ltd. · 2026-09-30The IPD is consistent with the description mapped out in St Barbara’s announcement of January 21, 2026, which outlined the results of the Pre-Feasibility Study for the 15-Mile Processing Hub Project, with an operational
Management’s Discussion and AnalysisOrezone Gold Corp · 2026-09-30The higher plant throughput was offset by a 15% decline in head grades from the planned drawdown of lower-grade stockpiles and the delayed mining of higher-grade hard rock ore as a result of intermittent deliveries of em
ANNUAL RESULTS ANNOUNCEMENT FOR THE YEAR ENDED 31 MARCH 2026GT Gold Holdings Limited · 2026-09-30Mining Operation The Group’s mining operation is shown as follows: 2026 2025 Ore production (tonnes) 70,405 66,012 Average gold grade (g/tonne) 4.23 4.20 Gold produced (kg) 298 277 Gold sold (kg) 306 270 The Group’s tota
Orezone Gold Reports First Quarter 2026 ResultsOrezone Gold Corp · 2026-09-30First Quarter 2026 Highlights • Acquisition of Casa Berardi gold mine and Quebec exploration properties completed on March 25, 2026 • Gold production of 38,789 oz with 37,563 oz from Bomboré and 1,226 oz from Casa Berard
Consolidated Financial StatementsOsisko Gold Group Inc. · 2026-09-30In addition, the Company is entitled to certain contingent deferred consideration, including (i) a cash payment equal to 70% of any Mexican VAT refund relating to periods ending on or before closing, (ii) US$2 million pa
Interim Report 2025GT Gold Holdings Limited · 2026-09-30FINANCIAL REVIEW 財務回顧 Revenue 收益 For the six months ended 30 September 2025 (the “Reporting 截至二零二五年九月三十日止六個月(「報告期 Period”), the Group’s revenue was approximately HK$1,094.8 million, ) 間」,本集團之收益為約1,094.8百萬港元,較去年 represent
INTERIM RESULTS ANNOUNCEMENT FOR THE SIX MONTHS ENDED 30 SEPTEMBER 2025GT Gold Holdings Limited · 2026-09-30FINANCIAL REVIEW 財務回顧 Revenue 收益 For the six months ended 30 September 2025 (the “Reporting 截至二零二五年九月三十日止六個月(「報告期 Period”), the Group’s revenue was approximately HK$1,094.8 million, ) 間」,本集團之收益為約1,094.8百萬港元,較去年 represent
Americas Gold and Silver Corporation Announces New Record Quarterly Silver Production and Sales, including 787,000 Ounces Produced and 830,000 Ounces SoldAmericas Gold & Silver · 2026-09-30As previously indicated, the Company expects full year production to be weighted to the second half of the year with associated lower costs as we continue to invest in the growth of our operations.
Americas Gold and Silver Reports Record Production and Sales in Q1 2026 as Execution on the Growth Plan Continues at GalenaAmericas Gold & Silver · 2026-09-30Outlook Americas’ consolidated produc on guidance for 2026 is a range between 3.2 million and 3.6 million ounces of silver at an AISC range of $30 to $35 per ounce sold.
Americas Gold and Silver Recognized as a Top Performer in the 2026 TSX30™Americas Gold & Silver · 2026-09-08Over the three-year period, Americas’ share price increased 477% and our market capitalization grew to $2.2 billion on the TSX. This performance reflects the transformation of our Company, includ
Challcollo Silver-Gold Mineral Resource EstimateAftermath Silver Ltd. · 2026-09-30Au grades have been capped at 3 g/t for two sample composites 4.57 g/t Au and 4.11 g/t Au respectively. • Includes drilling results up to September 2014. • Only reports the Lolón Structure. • Channel data was included.
07.07.2026 Troilus Drills 164 M Grading 0.95 g/t AuEq While Testing Unsampled Historic Drillhole Intervals in the Z87 Reserve PitTroilus Mining Corp. · 2026-09-30All results reported today are located within the Z87 reserve pit, as defined in the Feasibility Study ( see May 14, 2024 press release ), and continue to support the Company’s objective of evaluating opportunities
Berenguela Mineral Resource EstimateAftermath Silver Ltd. · 2026-09-30In addition, Silver Standard was required to carry out an exploration program estimated to cost a minimum of $500,000 to expand the property Mineral Resource, complete a resource estimate in accordance with NI 43-101 and
Financial Statements (June 30, 2025)Kuya Silver Corporation · 2026-09-30The estimated costs to be incurred have been adjusted for inflation of 2% (December 31, 2024 - 2%) and then discounted using current market-based pre-tax discount rate of 5% (December 31, 2024 - 5%).
25.06.2026 Troilus Drills 157.5 Metres Grading 0.95 G/T AuEq While Targeting Inferred Material Within the Z87 Reserve PitTroilus Mining Corp. · 2026-09-30All results reported today are located within the Z87 reserve pit, as defined in the Feasibility Study ( see May 14, 2024 press release ), and support the Company’s objective of evaluating opportunities to improve
Outcrop Silver Identifies New High-Grade Shoot at Santa Ana and Extends High-Grade Results at Las MarasOutcrop Silver & Gold Corporation · 2026-09-02At Las Maras, DH637 confirms that high-grade mineralization continues at depth, while DH640, our deepest hole at the target to date, returned a narrower interval and lower silver grades in that specific location — a resu
Management's Discussion and Analysis (December 31, 2025)Kuya Silver Corporation · 2026-09-30Bethania Silver Project • Total of 4,295 tonnes mined during 2025 generating a total revenue of $1.3 million, the fourth quarter of 2025 contributed approximately 47% of the tonnes mined during the year, a quarterly reco
Thesis Gold Intersects 38.00 Metres of 3.62 g/t Au at Steve Zone, Ranch ProjectThesis Gold & Silver Inc. · 2026-09-30The 2025 exploration program at Steve was designed to test zones interpreted to potentially host high-grade gold (Au) mineralization that was not included in the current Mineral Resource Estimate or the Pre-feasibility S
Preliminary Economic Assessment of the Omai Gold Property -Omai Gold Mines Corp. · 2026-09-30455 TABLE 1.6 PEA SUMMARY PARAMETERS AND RESULTS Parameter Amount Gold Price (Base case) US$/oz 1,950 LOM Tonnes Processed (Mt) 41.1 Average Process Plant Head Grade (Au g/t) 1.51 Mine Life (years) 13 Daily Process Plant
Silver One Resources Announces Restart of Drilling Program at CandelariaSilver One Resources Inc. · 2026-09-30Additional opportunities lie in previously identified high-grade silver intercepts down- dip and potentially increasing the substantive silver mineralization along-strike from the two past- producing open pits.
Minaurum Drills High-Grade Silver on the Europa Sur Vein Zone at the Alamos Silver Project: 3.20 m of 882 g/t AgEq and 6.20 m of 374 g/t AgEqMinaurum Silver Inc. (formerly Minaurum Gold Inc.) · 2026-09-30FOR RELEASE: May 27, 2026 TRADING SYMBOL TSX.V: MGG Minaurum Drills High-Grade Silver on the Europa Sur Vein Zone at the Alamos Silver Project: 3.20 m of 882 g/t AgEq and 6.20 m of 374 g/t AgEq Minaurum Silver Inc. (“Min
NI 43-101 Technical Report Mineral Resource Estimate for the Hyland Gold Project, Yukon Territory, CanadaBanyan Gold Corp. · 2026-09-30Inferred Mineral Resources must not be included in the economic analysis, production schedules, or estimated mine life in publicly disclosed Pre-Feasibility or Feasibility Studies, or in the Life of Mine plans and cash f
Management's Discussion and Analysis (September 30, 2025)Kuya Silver Corporation · 2026-09-30Silver Kings Project (Ontario, Canada) • A total of 1,761 wet tonnes of silver concentrate were shipped generating provisional revenue of USD $1.18 million.
AIFTalamore Mining Corp. · 2026-09-3023 Operating Costs The estimated life-of-mine operating cost per tonne of material processed along with the US$ cost per ounce gold produced for sale are summarized below.
Financial Statements (September 30, 2025)Kuya Silver Corporation · 2026-09-30The estimated costs to be incurred have been adjusted for inflation of 2% (December 31, 2024 - 2%) and then discounted using current market-based pre-tax discount rate of 5% (December 31, 2024 - 5%).
Q4 2025 - Financial Statements DownloadLunR Royalties Corp. · 2026-09-30Provisions are measured at the present value of the expenditures expected to be required to settle the obligations using the pre-tax rate that reflects current market assessments of the time value of money and the risks
Financial Statements Q3 2025 & Management’s Discussion and Analysis Q3 2025Goldsky Resources Corp. · 2026-09-30Highlight drill result releases from the first six months of 2018 include: hole RIS-17007 that yielded 32.0 metres grading 2.92 g/t gold and RIS-17005 that yielded 1.0-metre grading 248.0 g/t gold and expanding the Risbe
Financial Statements June Q2 2025Bunker Hill Mining Corp. · 2026-09-30For every $5,000,000 or part thereof advanced under the Debt Facility, the Company will grant a new 0.5% life-of-mine gross revenue royalty, on the same terms as the Royalty, to a maximum of 2.0% on the Primary Claims an
16.06.2026 Troilus Drills 1.15 g/t AuEq Over 37 M, Including 3.84 g/t AuEq Over 5 M, at Connector Zone, Extending High-Grade Mineralization Within Current Mine Plan AreaTroilus Mining Corp. · 2026-09-30The latest results continue to demonstrate the presence of higher-grade mineralization within the Connector area and support the Company’s objective of evaluating opportunities to improve future mine planning, incl
Updated NI 43-101 Omai Mineral Resource Estimate announced (note updated MRE announced April 2026)Omai Gold Mines Corp. · 2026-09-30The open pit will produce a total of 41.1 Mt of process plant feed at an average grade of 1.51 g/t Au, containing 1,989 koz over the LOM.
Minaurum Drills High-Grade Silver on the Quintera Vein Zone at the Alamos Silver Project: 5.30 m of 570 g/t Ag, including 2.50 m of 1,024 g/t Ag and 5.80 m of 581 g/t AgMinaurum Silver Inc. (formerly Minaurum Gold Inc.) · 2026-09-30FOR RELEASE: March 31, 2026 TRADING SYMBOL TSX.V: MGG Minaurum Drills High-Grade Silver on the Quintera Vein Zone at the Alamos Silver Project: 5.30 m of 570 g/t Ag, including 2.50 m of 1,024 g/t Ag and 5.80 m of 581 g/t
MANAGEMENT’S DISCUSSION AND ANALYSISTalamore Mining Corp. · 2026-09-30Additionally in March 2026, a 40,000-metre drill program commenced, part of which is focussed on infill drilling to convert a portion of the 0.8 Moz Inferred gold resource to the Indicated category for inclusion in the F
Minera Alamos Reports First Quarter 2026 Gold Production of 8,734 Ounces; Cash Balance Increased to $46 MillionMining Americas Inc. · 2026-09-30Minera Alamos CEO, Darren Koningen, commented, “First quarter gold production of 8,734 ounces represents yet another consistent quarter of output from the Pan mine in Nevada, where we have now cumulatively produced 18 th
Q3 2025 - Financial Statements and MD&A DownloadLunR Royalties Corp. · 2026-09-30Provisions are measured at the present value of the expenditures expected to be required to settle the obligations using the pre-tax rate that reflects current market assessments of the time value of money and the risks
Year ending December 31, 2025 - Form 10-KInternational Tower Hill Mines Ltd. · 2026-09-30The grade of ore ultimately mined, if any, may differ from that indicated by any pre-feasibility or definitive feasibility studies and drill results.
Financial Statements Q2 2025 & Management’s Discussion and Analysis Q2 2025Goldsky Resources Corp. · 2026-09-30Highlight drill result releases from the first six months of 2018 include: hole RIS-17007 that yielded 32.0 metres grading 2.92 g/t gold and RIS-17005 that yielded 1.0-metre grading 248.0 g/t gold and expanding the Risbe
Financial Statement – Q2 Financial Statements & Management Discussion & Analysis Financial StatementElemental Royalty Corporation · 2026-09-30Dollars ($000s), except where indicated Note 4 - Cash and Cash Equivalents At June 30, 2026, and December 31, 2025, the Company had the following cash and cash equivalents: June 30, December 31, 2026 2025 Cash $ 73,903 $
Financial Statement – Q1 Financial Statements & Management Discussion & Analysis Financial StatementElemental Royalty Corporation · 2026-09-30Dollars ($000s), except where indicated Note 4 - Cash and Cash Equivalents At March 31, 2026, and December 31, 2025, the Company had the following cash and cash equivalents: March 31, December 31, 2026 2025 Cash $ 68,805
Sunshine Silver Mining & Refining Reports Drill Results Exceeding 1,000 grams per tonne Silver from Multiple Zones including New “10 Vein”Sunshine Silver Mining & Refining Company · 2026-09-30The Sunshine Mine is one of the highest-grade primary silver resources in the world, and the Company is one of the few U.S.-based entities with a vertically integrated mine-to-mill-to-refinery platform, supported by a pe
Financial Statements Sept Q3 2025Bunker Hill Mining Corp. · 2026-09-30For every $5,000,000 or part thereof advanced under the Debt Facility, the Company will grant a new 0.5% life-of-mine gross revenue royalty, on the same terms as the Royalty, to a maximum of 2.0% on the Primary Claims an
Minaurum Files Technical Report on Alamos Silver ProjectMinaurum Silver Inc. (formerly Minaurum Gold Inc.) · 2026-09-30Subscribe to our email list at www.minaurum.com Minaurum Silver Inc. (MGG | TSX Venture Exchange; MMRGF | OTC; 78M Frankfurt) is an Americas-focused explorer concentrating on the high-grade, 100%-owned, production- permi
Corporate PresentationValor Gold Corp. · 2026-09-30COURAGEOUS LAKE GOLD DEPOSIT World Class Gold Resource 5 COURAGEOUS LAKE GOLD DEPOSIT 43-101 Report (Prepared by Ausenco – released January 2024) US$1,850/oz 2.7Mtpa M&I RESOURCE 145 MT 89% US$747 Million CL REFRACTORY G
Q2 2026 - Financial Statements DownloadLunR Royalties Corp. · 2026-09-30Upon demonstration of the technical and commercial feasibility of a project and a development decision, the carrying value related to that project is subject to an impairment test and is reclassified in accordance with I
CombinedSilver X Mining Corp. · 2026-09-30An average annual production of 6.2 Moz of silver equivalent (“AgEq”) is envisaged throughout the life-of-mine, excluding first and last year.
Q2 – Six months ended Jun. 30, 2026 - Form 10-QInternational Tower Hill Mines Ltd. · 2026-09-30Financial instruments measured at fair value are classified into one of three levels in the fair value hierarchy according to the significance of the inputs used in making the measurement.
Management's Discussion and AnalysisNexGold Mining Corp. · 2026-09-30The Goldboro Feasibility Study demonstrates an approximately 11-year open pit life of mine (“LOM”) with average gold production of 100,000 ounces per annum and an average diluted grade of 2.26 grams per tonne gold (“g/t
Q2 Financial Statements 2025Heliostar Metals Ltd. · 2026-09-30The Company invests all capital that is surplus to its immediate operational needs in short-term, highly liquid, high-grade financial instruments.
Financial Statements Q1 2025 & Management’s Discussion and Analysis Q1 2025Goldsky Resources Corp. · 2026-09-30Highlight drill result releases from the first six months of 2018 include: hole RIS-17007 that yielded 32.0 metres grading 2.92 g/t gold and RIS-17005 that yielded 1.0-metre grading 248.0 g/t gold and expanding the Risbe
Valor Gold Carve Out Financial Statements Year Ended December 31 2025Valor Gold Corp. · 2026-09-30When technical feasibility and commercial viability of extracting a mineral resource have been demonstrated and a decision to proceed with development has been made, Valor ceases recognizing exploration and evaluation ex
Financial Statements (December 31, 2025)Kuya Silver Corporation · 2026-09-30Under the terms of the agreement, the Company is committed to deliver 100% of its lead and zinc concentrate production, the agreement includes a minimum delivery commitment of 15,000 tonnes of lead and 10,000 tonnes of z
Q3 2025 Financial StatementsMako Mining Corp. · 2026-09-30Judgement is required to determine the point at which exploration activities transition to development activities, which involves assessing factors such as the technical feasibility and commercial viability of extracting
CONSOLIDATED FINANCIAL STATEMENTSMinaurum Silver Inc. (formerly Minaurum Gold Inc.) · 2026-09-30In assessing value in use, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to
Minera Alamos Reports Fourth Quarter Gold Production of 9,165 Ounces from the Pan Operating Complex; Cash Balance Increased to US$34 MillionMining Americas Inc. · 2026-09-30AISC excludes capital expenditures for significant improvements at existing operations deemed to be expansionary in nature, exploration and evaluation related to resource growth, rehabilitation accretion not related to c
Financial Statements – QUARTER ENDED – MAY 31, 2026Thesis Gold & Silver Inc. · 2026-09-30FINANCIAL INSTRUMENTS AND RISK MANAGEMENT Financial instruments measured at fair value are classified into one of three levels in the fair value hierarchy according to the relative reliability of the inputs used to estim
CONDENSED INTERIM FINANCIAL STATEMENTSTroilus Mining Corp. · 2026-09-30Given that the loan is a financial liability with fixed or determinable payments, management has concluded that it should be measured at amortized cost.
Mar 31, 2026 – Q1 Financial StatementsSilverco Mining Ltd. · 2026-09-30The timing of the estimated cash outflows is based on the projected mine life, with reclamation and closure activities expected to commence in 2035 and be fully completed by 2036.
Request for Financial StatementsThesis Gold & Silver Inc. · 2026-09-30If I have provided my email address above, I hereby consent to its use for the delivery by the Issuer or its agent of annual and/or interim financial statements by email.
Condensed Consolidated Interim Financial StatementsTalamore Mining Corp. · 2026-09-30These condensed consolidated interim financial statements have been prepared on a historical cost basis, except for financial instruments measured at fair value.
Financial Statements (March 31, 2026)Kuya Silver Corporation · 2026-09-30Under the terms of the agreement, the Company is committed to deliver 100% of its lead and zinc concentrate production, the agreement includes a minimum delivery commitment of 15,000 tonnes of lead and 10,000 tonnes of z
Consolidated Financial StatementsSilver Tiger Metals Inc. · 2026-09-30When the technical feasibility and commercial viability of extracting a mineral resource are demonstrable, the resource properties are no longer classified as resource properties and are tested for impairment prior to th
Q2 Financial StatementsSilver Mountain Resources Inc. · 2026-09-30Commercial production is deemed to have commenced when operations reach an average mining rate of 400 tonnes per day over a period of 30 days.
Management's Discussion and AnalysisOutcrop Silver & Gold Corporation · 2026-09-30Basis of measurement These condensed interim consolidated financial statements have been prepared using the historical cost basis, except for certain financial instruments that are measured at fair value, using the accru
Financial Statement – Q4 Financial Statements & Management Discussion & Analysis Financial StatementElemental Royalty Corporation · 2026-09-30Dollars ($000s), except where indicated) Note 8 - Royalty Interests (continued) Laverton and Jasper Hills On November 26, 2025, the Company completed the purchase of the Laverton and Jasper Hills royalties for total cash
Financial Statement – Q3 Financial Statements & Management Discussion & Analysis Financial StatementElemental Royalty Corporation · 2026-09-30The royalty comprises an uncapped 2.0% net smelter return (NSR) royalty over the 3.3 million ounce Measured and Indicated Resource at 1.3g/t gold at the Dugbe Project, which increases to 2.5% under certain production and
Q2 MD&ASilver Mountain Resources Inc. · 2026-09-30As indicated elsewhere in this MD&A, the Company is advancing toward production without a feasibility study that proved reserves, and therefore carries increased uncertainty and heightened risk of failure.
Bunker Hill Mining Expects Its PEA Resource Base to Significantly Increase Following Receipt of Initial Drill ResultsBunker Hill Mining Corp. · 2026-09-3018, 2020 (GLOBE NEWSWIRE) -- Bunker Hill Mining Corporation (the “Company”) (CSE: BNKR) is pleased to report that initial drill results from the ongoing exploration program at its Bunker Hill Mine located in
Q4 2025 Financial StatementsMako Mining Corp. · 2026-09-30Judgement is required to determine the point at which exploration activities transition to development activities, which involves assessing factors such as the technical feasibility and commercial viability of extracting
Goldsky Resources Rajapalot ProjectGoldsky Resources Corp. · 2026-09-12Learn more via our [Privacy Policy](https://goldskyresources.com/privacy-policy/)._ [](https://goldskyresources.com/) - [Company Overview](h
Management’s Discussion and Analysis – QUARTER ENDED – MAY 31, 2026Thesis Gold & Silver Inc. · 2026-09-302025 Prefeasibility Study Thesis published the results of a Prefeasibility Study (“PFS”) on December 1, 2025, which demonstrated a $2.37 billion net present value at 5% discount rate (“NPV5%”), an internal rate of return
Argent Minerals Kempfield Mineral Resource and Exploration EvidenceArgent Minerals Limited · 2026-09-12Two main distinct Ag-Pb-Zn mineralised zones have been delineated within the **extensive barite 2.1km zone** with the **largest silver-base metal zone striking approximately 1.1km in length**. **High-grade assay results
GR Silver Plomosas Project Mineral ResourceGR Silver Mining Ltd. · 2026-09-12The recent discovery of extensions to wide high-grade silver mineralization is delineating a new multimillion-ounce silver-rich hydrothermal system as a result of the application of modern exploration methods. [Learn mor
MANAGEMENT’S DISCUSSION AND ANALYSISTroilus Mining Corp. · 2026-09-30The FS incorporates the initial mineral reserve estimate supporting a long-life, 8 large scale, 50,000 tonnes per day (“tpd”) open-pit mining operation with total life-of-mine (“LOM”) payable metal consisting of 5.4 mill
Third Quarter 2026 – Download MD&ATRX Gold Corporation · 2026-09-30The PEA outlines average gold production of 62,000 oz per annum over 17.6 years at 3,000 tonnes per day (“tpd”) of throughput capacity, and $1.9 - $2.6 billion pre-tax NPV5% at average life of mine gold price of $4,000/o
Benz Mining Eastmain Gold Project Mineral Resource and Exploration ResultsBenz Mining Corp. · 2026-09-121,005,000 ounces at 6.1 g/t Au, including 384,000 ounces of Indicated resources at 9.0 g/t Au, with mineralisation remaining open in all directions.
Valor Gold Q2 2026 Condensed Interim Financial Statements 081326Valor Gold Corp. · 2026-09-3010 Financial Instruments and Financial Risk Management: The Company's financial instruments include cash and accounts payable and accrued liabilities, which are measured at amortized cost.
Minera Alamos Reports First Quarter 2026 Results, Setting Quarterly Records for Revenue of US$39.2 Million, Earnings of US$10.9 Million, and EBITDA of US$15.3 MillionMining Americas Inc. · 2026-09-30The shares were originally issued to Equinox Gold Corp. as partial consideration for Pan Acquisition. • On February 4, 2026, the Company announced 2026 production and cost guidance for the Pan mine, including gold produc
Q4 2025 - Management’s Discussion and Analysis DownloadLunR Royalties Corp. · 2026-09-30Further, it may take many years from the initial phase of drilling before production is possible and, during that time, the economic feasibility of exploiting a discovery may change.
Sunshine Silver Mining & Refining Reports Second Quarter 2026 ResultsSunshine Silver Mining & Refining Company · 2026-09-30It is characterized by exceptional size, extraordinary growth potential, existing infrastructure, and a history of proven production.
Second Quarter 2026 – Download MD&ATRX Gold Corporation · 2026-09-30The PEA outlines average gold production of 62,000 oz per annum over 17.6 years at 3,000 tonnes per day (“tpd”) of throughput capacity, and $1.9 - $2.6 billion pre-tax NPV5% at average life of mine gold price of $4,000/o
Hemlo Mining - NewsHemlo Mining Corp. · 2026-09-30Given the Hemlo Mine's processing plant spare capacity relative to nameplate throughput, unit milling costs are expected to decline as underground production increases, reflecting the ability to spread the plant's largel
Sorby Hills Project | Base Metal & Precious Metal MineBoab Metals Limited · 2026-09-30The open pit production target is estimated to be 18.3 million tonnes at an average grade of 3.4% lead and 39g/t silver. [Read the full DFS announcement here](https://boabmetals.com/wp-content/uploads/2023/05/Sorby-Hills
Q2 – Six months ended Jun. 30, 2026 - FinancialsInternational Tower Hill Mines Ltd. · 2026-09-30Financial instruments measured at fair value are classified into one of three levels in the fair value hierarchy according to the significance of the inputs used in making the measurement.
ASX Announcements – Benz Mining CorpBenz Mining Corp. · 2026-09-30Join our subscriber list:  Benz Mining Corporation 401 Bay Street, Suite 2100 Toronto ON M5H 2Y4 Ph: +61 8 6143 6702 Email: info@benzmining.
ASX Announcements - Argent MineralsArgent Minerals Limited · 2026-09-30First Name(Required) Last Name(Required) Email(Required) Subscribe - [Home](https://argentminerals.com.au/) - [Contact](https://argentminerals.com.au/contact/) - [Company](https://argentminerals.com.au/investors/asx-anno
1Argenta Silver Corp. · 2026-09-30Assay results from the Carolina structure include 18 m at 193 g/t Ag, 7.8% Pb, 4.5% Zn from 207 225 m in drill hole QVD-237.
Projects - Viscount Mining CorpViscount Mining Corp. · 2026-09-30Examination of PQ wireline core drilled in 1989 for a metallurgical sample, indicate; however, that faults with minor displacement are numerous. • In 2016 and 2017, a total of 1,367m were drilled across 19 holes with res
Half Yearly Report and AccountsForrestania Resources Limited · 2026-09-30Half Yearly Report and Accounts Published date: 11 Mar 2026, 21:06 Company Reports 1 / 1 Questions are answered by the IR team and, where appropriate, the MD directly.
Bullabulling Gold Project • Minerals 260Minerals 260 Limited · 2026-09-30This information is used to improve the user experience by providing more relevant search results in the future. - Cookie yt-remote-connected-devices - Duration Never Expires - Description YouTube sets this cookie to sto
ASX Announcements • Minerals 260Minerals 260 Limited · 2026-09-30This information is used to improve the user experience by providing more relevant search results in the future. - Cookie yt-remote-connected-devices - Duration Never Expires - Description YouTube sets this cookie to sto
Financial Reports | GR Silver MiningGR Silver Mining Ltd. · 2026-09-30These documents provide investors with transparent updates on company performance and operations. [Condensed Interim Financial Statements](https://grsilvermining.com/wp-content/uploads/2026/08/GR-Silver-2026-Q2-FS.pdf "C
Technical Reports - Goldsky ResourcesGoldsky Resources Corp. · 2026-09-30Learn more via our [Privacy Policy](https://goldskyresources.com/privacy-policy/)._ [](https://goldskyresources.com/) - [Company Overview](h
Projects – Silver Mines LtdSilver Mines Limited · 2026-09-30Multiple target styles and mineral occurrences have potential throughout the district including analogues to Bowdens Silver, high-grade silver-lead-zinc epithermal, volcanogenic massive sulphide (VMS) systems and copper-
Financial Reports – Silver Mines LtdSilver Mines Limited · 2026-09-30Web Design & Hosting By [Hi Tech Creative Mudgee](https://creative.htw.net.au/) [ | Cu (%) | Au (g/t) | Ag (g/t) | Cu (kt) | Au (koz) | Ag (koz) | | --- | --- | ---
Maverick SilverSun Silver Limited · 2026-09-30With a JORC Inferred Mineral Resource Estimate of **539Moz silver equivalent (AgEq) at 71g/t AgEq**, Maverick Silver is the **largest pre-production primary silver deposit on the ASX and within the US**. **Q4 2025 Resour
First Quarter 2026 – Download MD&ATRX Gold Corporation · 2026-09-30The PEA outlines average gold production of 62,000 oz per annum over 17.6 years at 3,000 tonnes per day of throughput capacity, and $1.9 billion pre-tax NPV5% at average life of mine gold price of $4,000/oz.
Front PageSotkamo Silver AB · 2026-09-30Part of the costs relate to drift development and stope preparation carried out to support future ore mining - CAPEX increased to 22 MSEK (16) to accelerate the underground mine development - The production amounted to 2
Financial Reports | Silver Tiger Metals Inc.Silver Tiger Metals Inc. · 2026-09-30Further, in accordance with Canadian rules, estimates of inferred mineral resources cannot form the basis of feasibility or other economic studies.
Preliminary Economic Assessment NI 43-101 Technical ReportGold X2 Mining Inc. · 2026-09-30This NI 43-101 Technical Report confirms the technical and economic viability of the Project with an annual average gold production of 265 Au koz and silver production of 374 Ag koz over 13 years of the life-of-mine (“LO
Minaurum | News ReleasesMinaurum Silver Inc. (formerly Minaurum Gold Inc.) · 2026-09-30The AL26-230 intercept is situated about 130 m up dip and 30 m north of hole **AL26-215, which also returned high-grade silver:** **5.95 m of 1,117 g/t AgEq** ( **953 g/t Ag**, 0.05 g/t Au, 1.22% Cu, 1.58% Pb, 0.41% Zn)
Management’s Discussion and Analysis (June 30, 2026)Kuya Silver Corporation · 2026-09-30Under the terms of the agreement, the Company is committed to deliver 100% of its lead and zinc concentrate production, the agreement includes a minimum delivery commitment of 15,000 tonnes of lead and 10,000 tonnes of z
Valor Gold Carve Out Financial Statements Three Months Ended March 31 2026Valor Gold Corp. · 2026-09-30Consideration under the Arrangement will consist of the issuance of an aggregate of 55 million new Valor shares and the payment of $5.1 million in cash.
Management’s Discussion and Analysis (March 31, 2026)Kuya Silver Corporation · 2026-09-30Under the terms of the agreement, the Company is committed to deliver 100% of its lead and zinc concentrate production, the agreement includes a minimum delivery commitment of 15,000 tonnes of lead and 10,000 tonnes of z
ReleasesSotkamo Silver AB · 2026-09-30Jul 26 | [Sotkamo Silver’s Q2/2026 Interim Report: Record net sales and strong cash flow](https://www.silver.fi/en/investors/releases/newsfeed?postid=5a5f1f8f-c13e-4311-809a-ebfafcf3d370) | | 21\.
Eloro Resources Ltd. | Why InvestEloro Resources Ltd. · 2026-09-30Drilled: 22,399m in 46 drill holes - ### September 28, 2021 160.22 g Ag eq/t over 194.14m in Santa Barbara Breccia Pipe Drilled: 30,014m in 57 drill holes - ### OCTOBER 21, 2021 Resource definition in progress on target
Valor Gold Corp Management's Discussion and Analysis Q2 2026 081326Valor Gold Corp. · 2026-09-30In addition, the grade of mineralization ultimately mined may differ from the one indicated by the drilling results and the difference may be material.
企业官网_企业要闻Shandong Gold Mining Co., Ltd. · 2026-09-3047 下一页 政府机构 [中华人民共和国国务院](https://www.gov.cn/) [山东省人民政府](http://www.sd.gov.cn/) [中华人民共和国自然资源部](https://www.mnr.gov.cn/) [中华人民共和国国家统计局](http://www.stats.gov.cn/) [中华人民共和国商务部](http://www.mofcom.gov.cn/) [中华人民共和国生态环境部](https
Investor Materials | GR Silver Mining – Presentations & Fact SheetsGR Silver Mining Ltd. · 2026-09-30Play Video Plomosas Mine Infrastructure Play Video 3D Plomosas Mine Model Play Video GR Silver Mining: Plomosas & San Marcial \| RCTV at The Mining Investment Event of the North Play Video San Marcial is a case study in
Santa Ana | Outcrop SilverOutcrop Silver & Gold Corporation · 2026-09-30The Frias Mine on the south-central part of the project, 12 kilometres south of the Royal Santa Ana Mines produced 7.8 million ounces of silver post-production in the Spanish colonial era at a recovered grade of 1.3 kg A
Sunshine Mine - Sunshine Silver MiningSunshine Silver Mining & Refining Company · 2026-09-30With a high-grade silver resource, significant operating history, existing infrastructure and an expanded land position in the Silver Valley, Sunshine is building the next chapter of American silver. [High-Grade Silver R
Financial Statements | Omai Gold Mines Corp.Omai Gold Mines Corp. · 2026-09-30All Rights Reserved.Website by [Proactive Digital Solutions.](https://proactivedigital.solutions/)  - [Home](https://omaigoldmin
PARIS SILVER PROJECT | Investigator SilverInvestigator Silver Limited · 2026-09-30Paris hosts a JORC (2012) Mineral Resource of 24Mt at 73g/t silver and 0.41% lead, containing 57 million ounces of silver and 99,000 tonnes of lead.
2026 04 / 27 2026 / 04 / 27 First Quarterly Report 2026 pdfZijin Mining Group Co., Ltd. · 2026-09-30For the gold segment, 23.5 tonnes of mine-produced gold were produced, representing an increase of 23% compared with the same period last year.
2026 04 / 27 2026 / 04 / 27 2025 Annual Report pdfZijin Mining Group Co., Ltd. · 2026-09-30The main reason for the increase in the gross profit margin of mineral products was the increase in prices and the effective management of cash cost per tonne of ore.
Resources Rising Stars – Turaco Emerging as a Gold Developer of Note in West AfricaTuraco Gold Limited · 2026-09-30Howard models a 10-year, 4Mt per annum open pit operation based on the current resource “Life-of-mine production averages 130,000oz per annum with 169,000ozpa averaged in the first five years of operations,” he said. “All-
SA Mining: Pot of Gold, July / August 2020Turaco Gold Limited · 2026-09-30RESOURCE FOR SALE TO A GOLD funded and able to respond quickly once 250 000oz Au annually, only has around years we will have been able to advance each measures, and the leadership of the However if that proves to be the
Valor Gold FactSheet June262026Valor Gold Corp. · 2026-09-30NWT, Canada | 100% Owned Reserves (PFS) ▶ 500km² prospective land holding covering 54km greenstone belt — 33.9Mt @ 2.61g/t Au 2.8 million oz Au substantially under-explored Marcus Adam ▶ Located in NWT; close proximity t
Financial Statements - YEAR ENDED - FEB 28, 2026Thesis Gold & Silver Inc. · 2026-09-30MATERIAL ACCOUNTING POLICIES (continued) d) Exploration and evaluation assets Expenditures incurred in the exploration for and evaluation of mineral resources are capitalized after the legal right to explore a specific a
20.08.2026 Troilus Drills 8.84 g/t AuEq Over 4.8 M at Z87, Confirming High-Grade Mineralization 400 M Beyond Current Resource Pit ShellTroilus Mining Corp. · 2026-09-30All five holes were extensions of existing drillholes originating from the J Zone and were designed to test the down-plunge continuity of high-grade Z87 mineralization beyond the existing mineral resource (see the 2023 M
Dec 31, 2025 – Year End Financial StatementsSilverco Mining Ltd. · 2026-09-30In assessing value in use, estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the
Gold Mining Journal – Turaco Set to Grow Well-studied LicenceTuraco Gold Limited · 2026-09-30Turaco can increase its stake to 65% by making “To be only an hour and a half out of Abidjan makes it a very a further $US2.5 million payment and delivering a PFS with a easy place to be working,” Tremain said. “That [hi
Download PFSThesis Gold & Silver Inc. · 2026-09-30Table 10-22: 2023 BV (Barite Vein) Drill Holes Year Type Drill Core Size Quantity Meters Drilled 2023 Diamond HQ/NQ2 11 1,079 Lawyers - Ranch Project Page 183 NI 43 - 101 Technical Report and Pre - feasibility Study Dece
Mining Americas Inc. Reports Second Quarter 2026 Gold ProductionMining Americas Inc. · 2026-09-30Since introducing the new mining contractor at the start of the year, mining rates at Pan successfully ramped up to over 80,000 tonnes per day, as compared with 55,000 tonnes per day previously.
https://sunshinesilvermining.com/wp-content/uploads/2026/07/Sunshine-Silver-Drill-Results-Table_v1.pdfSunshine Silver Mining & Refining Company · 2026-09-30Page 2 Sunshine Mine Exploration Drill Results (Continued) True From To Width AgEq1 AgEq1 Hole ID Vein Name Width Ag (gpt) Cu (%) Pb (%) Sb (%) (m) (m) (m) (gpt) (opt) (m) FS-ST18 CFault Vein 195.07 195.22 0.15 0.11 1,29
Q2 2026 - 10QSunshine Silver Mining & Refining Company · 2026-09-30As part of the Sunshine Mine Feasibility Study, the Company is advancing plans for a new mill designed to process up to 2,000 tonnes per day ("tpd"), providing flexibility to increase throughput beyond the current base c
MANAGEMENT’S DISCUSSION AND ANALYSISTroilus Mining Corp. · 2026-09-30The FS incorporates the initial mineral reserve estimate supporting a long-life, large scale, 50,000 tonnes per day (“tpd”) open-pit mining operation with total life-of-mine (“LOM”) payable metal consisting of 5.4 millio
Download PFS PresentationThesis Gold & Silver Inc. · 2026-09-30Refer to the news release dated December 1, 2025, entitled “Thesis Gold Announces Positive Prefeasibility Study for Lawyers-Ranch Project: After-Tax NPV5% of $2.37 Billion and 54.7% IRR.” 8 LAWYERS-RANCH PFS1 | PRODUCTIO
Management’s Discussion and AnalysisTalamore Mining Corp. · 2026-09-30Additionally in March 2026, a 40,000-metre drill program commenced, part of which will focus on infill drilling to convert a portion of the 0.8 Moz Inferred gold resource to the Indicated category for inclusion in the Fe
Sunshine Silver Mining & Refining Announces Second Quarter 2026 Earnings CallSunshine Silver Mining & Refining Company · 2026-09-30The new results, which follow Sunshine’s June 2026 initial public offering on the New York Stock Exchange, include multiple intercepts exceeding 1,000 grams per tonne (“gpt”) silver and support two key objectives: upgrad
QUARTERLY REPORT Q4 2022Sotkamo Silver AB · 2026-09-30Milled ore totaled Investments in the underground mine and the covenant relating to the Company's net 154 000 (182 000) tonnes including the environmental investments amounted to 11 debt in relation to EBITDA. marginal o
NI 43-101 Technical Report Preliminary Economic Assessment of the Cerro Las Minitas Project, Durango State, Mexico, Effective DateSouthern Silver Exploration Corp. · 2026-09-30Projected maximum cash outlay for the project is estimated to be $341.0 million and project payback is approximately 60 months.
ANNUAL REPORT 2021Sotkamo Silver AB · 2026-09-30CASH COST ALL IN CASH COST Produktionskostnad per producerad troy uns silver, efter att kostnaden reducerats med intäkter från Produktionskostnad per producerad troy uns silver, med hänsyn tagen till investeringar för at
CERTIFICATE OF REGISTRATIONSotkamo Silver AB · 2026-09-30ARTICLES OF ASSOCIATION Date of the latest change: 2022-12-28 FINANCIAL YEAR Registered financial year: 0101 - 1231 Latest annual report submitted covers financial period 20210101-20211231 SECONDARY BUSINESS NAME Silver
Management's Discussion and AnalysisSilver Tiger Metals Inc. · 2026-09-30Even in the event that mineralization is discovered on a given property, it may take several years in the initial phases of drilling until production is possible, during which time the economic feasibility of production
MANAGEMENT’S DISCUSSION AND ANALYSIS OFSilver X Mining Corp. · 2026-09-30Sustaining capital expenditures increased 110% to $2.0M in 1Q26, compared to $1.0M in 1Q25, and increased 34% from $1.5M in 4Q25, driven by increased mine development activities focused on higher-grade areas.
Dec 31, 2025 – Year End MD&ASilverco Mining Ltd. · 2026-09-30The following table summarizes the key results of the PEA: Units Base Case Silver price assumption US$/oz $44.58 (LOM avg.) Mine life years 8.3 Throughput tpd 1,200 Avg. annual AgEq production (2028–2033) Moz ~2.5 After-
Q2 2026 - Management’s Discussion and Analysis DownloadLunR Royalties Corp. · 2026-09-30Drill results continue to expand the known extent of mineralization to the north, south, and at depth, while also confirming high grades and continuity within the named and new high-grade zones.
Financial StatementSilver X Mining Corp. · 2026-09-30Management uses several criteria in its assessments of economic recoverability and probability of future economic benefit including geologic and metallurgic information, history of conversion of mineral deposits to prove
Management's Discussion and AnalysisSilver Tiger Metals Inc. · 2026-09-30Even in the event that mineralization is discovered on a given property, it may take several years in the initial phases of drilling until production is possible, during which time the economic feasibility of production
Mar 31, 2026 – Q1 MD&ASilverco Mining Ltd. · 2026-09-30Project Description and Mining Plan The PEA contemplates an approximately nine-year mine life at a steady-state throughput of 1,200 tonnes per day, with mining activities focused on three primary zones: Promontorio, San
MANAGEMENT’S DISCUSSION AND ANALYSIS OFSilver X Mining Corp. · 2026-09-30Sustaining capital expenditures increased by 87% from $812K in 4Q24 to $1.5M in 4Q25 and increased by 33% on a year-to-date basis, from $3.4M to $4.5M, driven by increased mine development activities during the current p
STOCKWORK ZONE PRE-FEASIBILITY STUDY AND UNDERGROUND PRELIMINARY ECONOMIC ASSESSMENT OF THE EL TIGRE SILVER-GOLD PROJECT SONORA, MEXICOSilver Tiger Metals Inc. · 2026-09-30The design of the mine required several steps, as listed below: • Create a diluted block model from the Mineral Resource model; • Complete pit optimization to select the optimal pit shell to be used for the mine design;
Q1 Financial StatementsSilver Mountain Resources Inc. · 2026-09-30The PEA highlighted a silver and base metals project with a pre-tax net present value of C$107 million using a 5% discount rate.
Silver One Resources Announces Major 25,000 Metre Drill Program at CandelariaSilver One Resources Inc. · 2026-09-30While not all results will form part of the PFS, the work will attempt to potentially expand the known resource, evaluate new targets across the district, and ensure we are planning future infrastructure with an informed
Q1 MD&ASilver Mountain Resources Inc. · 2026-09-30The information contained in this MD&A, including references to mine life, reserve levels, are based on technical studies and assumptions that may prove to be inaccurate.
Click here for the press releaseOmai Gold Mines Corp. · 2026-09-30The open pit operation is expected to extract 134.1 million tonnes (“Mt”) at 1.08 g/t Au containing 4.641 million ounces (“Moz”) of gold over the mine life.
Condensed Interim Consolidated Financial StatementsOutcrop Silver & Gold Corporation · 2026-09-30Basis of measurement These condensed interim consolidated financial statements have been prepared using the historical cost basis, except for certain financial instruments that are measured at fair value, using the accru
aaue 20251231 d2Allied Gold Corporation · 2026-09-30These expenditures are capitalized until the technical feasibility and commercial viability of extracting the mineral resource of a project are demonstrable.
Read MoreNorthIsle Copper and Gold Inc. · 2026-09-30The Canada Investment Summit and the Dealbook provide exactly the type of visibility and exposure necessary to attract global institutional capital to support sustainable resource development in Canada.
43-101 Technical Report and Prefeasibility Study (PFS) September 30, 2022Bunker Hill Mining Corp. · 2026-09-30Bunker Hill is projected to generate approximately $25 million of annual average free cash flow over an initial 5-year mine life based on the current Probable reserves.
NI 43-101 Technical Report AurMac Property Mayo Mining District, Yukon Territory, CanadaBanyan Gold Corp. · 2026-09-30In 2012, AXU carried out a diamond drill program consisting of 1,275 m in 5 holes with results indicating that gold mineralization within the skarn is generally of low tenor, with local higher-grade intervals associated
- Berenguela Silver-Copper-Manganese Property UpdateAftermath Silver Ltd. · 2026-09-30In addition, Silver Standard was required to carry out an exploration program estimated to cost a minimum of US$500,000 to expand the property Mineral Resource, complete a resource estimate in accordance with National In
Columba drilling returns 10 meters of 503 gpt silver, 0.1% lead, 0.6% zinc and 9.88 meters of 319 gpt silver, 0.1% lead and 0.6% zinc from the Columba Drill ProgramKootenay Silver Inc. · 2026-09-30This shows well on the long sections.” Drill results, CDH-25-228 to 235 est true From To Interval Silver Geologic Hole ID width1 Pb % Zn% (meters) (meters) (meters) gpt Intersection (m) B2 Vein (Lupe CDH-25-228 225.50 22
Management's Discussion and AnalysisOmai Gold Mines Corp. · 2026-09-30The PEA demonstrates an open pit operation with production of 1.84 million ounces (“oz”) of gold, averaging 142,000 oz annually over a 13 year mine life at an average grade of 1.51 g/t Au, giving an NPV5% of US$556 milli
For the three and six months endedMeridian Mining plc · 2026-09-30Cabaçal Mining and Economic Assessment Key elements of the PFS mining study and economic analysis are: • 10.6-year shallow open pit mining operation proposed with total feed inventory of 41.70 Mt; • Year 1 mill feed of 1
Read MoreNorthIsle Copper and Gold Inc. · 2026-09-30These results, in addition to improved commodity prices, have driven meaningful resource growth and provide a solid foundation for the North Island Project PFS, which remains on target for completion in Q1 2027.” The 202
Q3 2025 MD&AMako Mining Corp. · 2026-09-305 Management’s Discussion and Analysis For the three and nine months ended September 30, 2025 Cash Cost and AISC per gold ounce sold: Cash cost per oz of gold sold increased in Q3 2025 versus Q3 2024, driven by higher mi
Corporate PresentationSilver Mountain Resources Inc. · 2026-09-30Refer to the full text of the Reliquias Technical Report for the assumptions, qualifications and limitations relating to the Reliquias Project TSX: AGMR | OTCQB: AGMRF | BVL: AGMR CORPORATE PRESENTATION | 11 Ful l y Fund
2026 NOTICE AND ACCESS NOTIFICATION TO SHAREHOLDERSIMPACT Silver Corp. · 2026-09-30HOW TO OBTAIN COPIES OF THE MEETING MATERIALS Shareholders may request that paper copies of the Meeting materials be sent to them by postal delivery at no cost to them.
MMA 20260727Maronan Metals Limited · 2026-09-30Key upcoming value catalysts include: Drill results (ongoing); updated MRE (1Q 2027); Preliminary Feasibility Study and maiden Ore Reserve (mid-2027); and permitting and approvals (ongoing).
Management's Discussion and AnalysisOutcrop Silver & Gold Corporation · 2026-09-30The highlights of the Company’s activities in the three months ended November 30, 2025, and up to the date of this MD&A include: a) On September 3, 2025, Outcrop Silver released standout results from its delineation dril
Management's Discussion and AnalysisJaguar Mining Inc. · 2026-09-30The provisions are determined using expectations of future activities and the amount and timing of associated cash flows discounted to their present value using a pre-tax discount rate.
For the three and six months ended and 2025Meridian Mining plc · 2026-09-30Whilst the company has raised $76.2 million of equity in the year and holds a cash balance of $96.0 million at June 30 2026, as a pre-revenue Company, the Company continues to be reliant on the equity and debt markets fo
CONSOLIDATED FINANCIAL STATEMENTSOmai Gold Mines Corp. · 2026-09-30Provisions are measured at the present value of the expenditures expected to be required to settle the obligation using pre-tax rate that reflects current market assessments of the time value of money and the risk specif
Kootenay Silver Commences 3D-IP and AMT Geophysical Survey at the Columba Silver Project, Chihuahua, MexicoKootenay Silver Inc. · 2026-09-30Previous drilling has successfully delineated near-surface and intermediate-depth silver zones, culminating in the project’s maiden inferred category Mineral Resource Estimate (“MRE”) of 54.1 Moz silver within 5.92Mt at
Q1 2026 MD&AMako Mining Corp. · 2026-09-30Three months ended March 31, 2026 March 31, 2025 Change Tonnes mined (1) 1,550,906 – 1,550,906 Mineralized tonnes mined (1) 528,545 – 528,545 Ore stacked (1) 490,156 – 490,156 Gold grade (g/t) (1) 0.31 – 0.31 Ounces reco
Mining Americas Schedules Q2 2026 Results and Conference Call PresentationMining Americas Inc. · 2026-09-30The Company’s financial condition and prospects could differ materially from those currently anticipated in forward-looking information for many reasons such as: an inability to receive requisite permits for mine operati
Read MoreNorthIsle Copper and Gold Inc. · 2026-09-30Figure 22-2: Pre-Tax NPV, IRR Sensitivity Results 3,500.0 3,000.0 2,500.0 NPV (C$M) 2,000.0 1,500.0 1,000.0 500.0 – (25%) (20%) (15%) (10%) (5%) – 5% 10% 15% 20% 25% Commodity Price (+/-%) Total Opex (+/-%) Initial Capex
Heliostar Commences Open Pit Mining at La Colorada MineHeliostar Metals Ltd. · 2026-09-30The current technical report and operating plan for the mine show a six-year mine life averaging 46,100 ounces of annual gold production.
2025 - Annual Information Form DownloadLunR Royalties Corp. · 2026-09-30For example, at a 0.6% CuEq cut-off grade, Indicated Mineral Resources are estimated at 510 Mt averaging 0.56% Cu, 0.21 g/t Au, and 1.8 g/t Ag and containing 6.3 Blb of copper, 3.5 Moz of gold, and 30 Moz of silver. Th
Annual Report and Financial StatementsMeridian Mining plc · 2026-09-30Work completed within the VMS Belt during the year ended 31 December 2025 included: Cabaçal • 51 surface diamond holes for 5,815m for resource definition; • Initiation of Feasibility Study engineering reviews by Ausenco
Management’s Discussion and AnalysisIMPACT Silver Corp. · 2026-09-30Under NI43-101 the Company is required to disclose that it has not based its production decisions on NI43-101-compliant mineral resource or reserve estimates, preliminary economic assessments or feasibility studies, and
Hemlo Mining Corp. Reports Fourth Quarter and Year End 2025 Financial and Operating ResultsHemlo Mining Corp. · 2026-09-30Operating Highlights • Attributable gold1 production from November 26, 2025 to December 31, 2025 totalled 16,503 ounces of gold at an average grade of 4.71 g/t with average recoveries of 93.2%.
Kootenay to Showcase Columba Silver Project at the 2026 PDAC Core ShackKootenay Silver Inc. · 2026-09-30The extensive Columba vein system currently hosts an inferred Mineral Resource Estimate (“MRE”) totaling 54.1 Moz of silver based 5.92 Mt at a grade of 284 gpt. (The technical report entitled “Technical Report on the Mai
Q4 2025 MD&AMako Mining Corp. · 2026-09-30Cash cost and AISC: Cash costs and AISC increased in Q4 2025 compared to Q4 2024, and for the full year, primarily due to a higher stripping ratio, mining and processing of lower grade material, longer haul distances for
Fourth Quarter ReportJaguar Mining Inc. · 2026-09-30Once a site with mineralization is discovered, it may take several years from the initial phases of drilling until production is possible, during which time the economic feasibility of production may change.
Q1 2026 - Management’s Discussion and Analysis DownloadLunR Royalties Corp. · 2026-09-30HIGHLIGHTS DURING AND SUBSEQUENT TO Q1 2026 • On February 22, 2026, the Company announced that it had entered into a binding term sheet (the "Term Sheet") with Lundin Gold Inc. ("Lundin Gold") and Aureliean Resources Inc
Management's Discussion and AnalysisMinaurum Silver Inc. (formerly Minaurum Gold Inc.) · 2026-09-30The transaction was completed on December 18, 2025. • On October 16 and October 29, 2025, the Company released drill results from its 2025 resource-definition drill program at its Alamos (Quintera) project.
Q1 – Three months ended Mar. 31, 2026 - Form 10-QInternational Tower Hill Mines Ltd. · 2026-09-30Financial instruments measured at fair value are classified into one of three levels in the fair value hierarchy according to the significance of the inputs used in making the measurement.
Kootenay Commissions a Preliminary Economic Assessment on La Cigarra Silver Deposit and Continues to Aggressively Drill ColumbaKootenay Silver Inc. · 2026-09-30It is reasonably expected that most Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. (6) The La Cigarra mineral resource estimate is based on a validated database wh
Q2 2026 MD&AMako Mining Corp. · 2026-09-30The estimated life-of-mine sustaining capital expenditures(1) of $86 million is expected to be funded from operating cash flows.
Management's Discussion and Analysis Q1 2026Heliostar Metals Ltd. · 2026-09-30The Company plans to produce 50,000-55,000 ounces of gold at by-product cash costs of $1,850-$1,950/oz gold and a consolidated AISC of $2,025-$2,125/oz gold.
First Quarter ReportJaguar Mining Inc. · 2026-09-30This measure is used by the Company and investors to measure the cash flow available to fund the Company’s growth through investments and capital expenditures. ($ thousands, except where indicated) Three months ended Mar
Q1 2026 - Financial Statements DownloadLunR Royalties Corp. · 2026-09-30The Interim Financial Statements are prepared on a historical cost basis except for certain financial assets, which are measured at fair value.
corporate presentationHemlo Mining Corp. · 2026-09-30Tonnes Grade Cont. ▪ 2025 attributable production of ~121koz Au(1) (kt) (g/t Au) (koz Au) (kt) (g/t Au) (koz Au) (kt) (g/t Au) (koz Au) Current ▪ 2026 H1 attributable gold sold of ~60kozs Au(1) at Open Pit -- -- -- 71,92
Euro Hartleys: BNZ – Is This the Next Tropicana?Benz Mining Corp. · 2026-09-30G&A cost of $5 Royalty of 4.5% (Government 2.5% and Tembo 2%) Assume a 2.5Mtpa CIL Processing plant - A$190m (based on RMS recent PFS for Lake Rebecca which was A$190m for a 3Mtpa processing plant).
Q2 – Six months ended Jun. 30, 2026 - MD&AInternational Tower Hill Mines Ltd. · 2026-09-30On April 13, 2026, the Company announced that it had awarded Livengood Gold Project Feasibility Study Phase 1 contracts to a consortium comprised of BBA Consultants USA LP, (“BBA”), Hatch Ltd, (“Hatch”), Newfields Mining
Boab Metal Presentation Jul26Boab Metals Limited · 2026-09-30Tender process has indicated SAG Mill Ba ll Mill A$20M saving i n Processing Plant capital cost Ta ilin gs Thicken er 6 mon ths reduction i n construction timeline Figure: 3D Model of the Sorby Hills Process Plant produc
CONSOLIDATED FINANCIAL STATEMENTSIMPACT Silver Corp. · 2026-09-30The valuation incorporated key of the audit. assumptions related to future production volumes, operating • Professionals with specialized skill and knowledge in the costs, commodity prices, and an after-tax discount rate
Second Quarter ReportJaguar Mining Inc. · 2026-09-30Reconciliation of Cash Operating Costs, All-In Sustaining Costs and All-In Costs per Ounce Sold ($ thousands, except where indicated) Three months ended Six months ended June 30 June 30 2026 2025 2026 2025 Operating cost
MANAGEMENT’S DISCUSSION AND ANALYSISHeliostar Metals Ltd. · 2026-09-30The Company expects the results of the ongoing drilling and engineering programs to support future evaluations of resource expansion and mine life extension opportunities at the operations.
Iberian Belt West NI 43-101 Technical Report (Mineral Resource Estimate) 2025Emerita Resources Corp. · 2026-09-30Results included: • IN068: Weak anomaly between 220-230m; • LR065: Significant conductivity mass subvertical at 560m; • LR087: Positive polarity indicates that the edge of ore is far from the drillhole; • LR101: Polarity
Financial Statements Q4 2025 & Management’s Discussion and Analysis Q4 2025Goldsky Resources Corp. · 2026-09-30Highlight drill result releases from the first six months of 2018 include: hole RIS-17007 that yielded 32.0 metres grading 2.92 g/t gold and RIS-17005 that yielded 1.0-metre grading 248.0 g/t gold and expanding the Risbe
Third Quarter ReportJaguar Mining Inc. · 2026-09-3028 Reconciliation of Cash Operating Costs, All-In Sustaining Costs and All-In Costs per Ounce Sold ($ thousands, except where indicated) Three months ended Nine months ended September 30 September 30 2025 2024 2025 2024
Year ending December 31, 2025 - MD&AInternational Tower Hill Mines Ltd. · 2026-09-30The study utilized a third-party review by Whittle Consulting and BBA Inc. to integrate new interpretations based on an expanded geological database, improved geological modelling, new resource estimation methodology, an
Condensed Interim Consolidated Financial StatementsEloro Resources Ltd. · 2026-09-30During the 3 months ended June 30, 2026, the Company determined that there were indicators of impairment on La Victoria due to a lack of budgeted or planned substantive expenditures and insufficient data to support the t
Q1 – Three months ended Mar. 31, 2026 - FinancialsInternational Tower Hill Mines Ltd. · 2026-09-30Financial instruments measured at fair value are classified into one of three levels in the fair value hierarchy according to the significance of the inputs used in making the measurement.
Heliostar Presents Q2 2026 Financial and Operating Results with Record Gold P...Heliostar Metals Ltd. · 2026-09-30These results will be incorporated into the updated resource that will form the basis of the upcoming Feasibility Study.
CONSOLIDATED FINANCIAL STATEMENTSApollo Silver Corp. · 2026-09-30Provisions are measured at the present value of the expenditures expected to be required to settle the obligation using a pre-tax rate that reflects current market assessments of the time value of money and the risk spec
NI 43-101 - October 16, 2025Apollo Silver Corp. · 2026-09-306-14 TECHNICAL REPORT – CALICO SILVER PROJECT Pan American Estimate Pan American (2013) generated an internal resource estimate in 2013 that was based on the results of their 2012 RC drill program (234 holes, representin
MANAGEMENT DISCUSSION AND ANALYSISApollo Silver Corp. · 2026-09-30Furthermore, cost over-runs or unexpected changes in commodity prices in any future development could make the projects uneconomic, even if previously determined to be economic under feasibility studies.
Corporate PresentationSilverco Mining Ltd. · 2026-09-30LEVERAGED TO SILVER PRICE RANKS HIGHLY ON PERCENTAGE OF TOTAL M&I RESOURCE VALUE ATTRIBUTABLE TO SILVER 100% Every US$10/oz increase results 90% in approximately US$70M of 80% incremental NPV(5%) 70% 60% 50% 40% 30% 20%
Management's Discussion and AnalysisEloro Resources Ltd. · 2026-09-30The results confirm the significant scale and mineral endowment of the Iska Iska Project, with substantial resources defined in both the Indicated and Inferred categories.
- Mineral Resource Estimate for the Berenguela ProjectAftermath Silver Ltd. · 2026-09-30In addition, Silver Standard was required to carry out an exploration program estimated to cost a minimum of $500,000 to expand the Property Mineral Resource, complete a resource estimate in accordance with NI 43-101 and
2025 Annual Information FormEloro Resources Ltd. · 2026-09-30Evidently the sparsely drilled parts of the deposit reflect the lowest block grades. • Distribution of higher-grade zones at/close to surface offers an opportunity for a quick payback period when the deposit is eventuall
Financial Statements Q4 2025 (Audited)Goldsky Resources Corp. · 2026-09-30In assessing value in use, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to
Management Discussion & AnalysisBlackrock Silver Corp. · 2026-09-30This time period equated to approximately 1.0 to 1.5 million tonnes of material that would need to be mined to achieve the payback, and secondly, the amended PEA showed a 7.8 year mine life.
New Iska Iska DeckEloro Resources Ltd. · 2026-09-30Grade g/t - 40 65% increase in silver grades, moving from 24.3 g/t Zinc Mt - 1.03 100 Grade % - 1.21% Ag (2023 inferred) to 40 g/t Ag (2026 indicated) in the Lead Mt - 0.6 100 core zone.
Management's Discussion and AnalysisBanyan Gold Corp. · 2026-09-30Mineral Resources are reported at a cut-off grade of 0.30 g/t gold for all deposits, using a US$/CAN$ exchange rate of 0.73 and constrained within an open pit shell optimized with the Lerchs-Grossman algorithm to constra
exh 991TRX Gold Corporation · 2026-09-30Completion of Buckreef Gold Mine 1,000+ tonne per day Processing Plant Construction During September 2022, Buckreef Gold announced successful commissioning of the expanded 1,000+ tpd mill circuit, which was completed on
ele 20251231xexx993xmdaElemental Royalty Corporation · 2026-09-30The Company noted that the PFS will incorporate updated technical work and recent resource progress, supported by a strengthened financial position following recent equity financing.
INTERIM STATEMENT OF FINANCIAL POSITIONBanyan Gold Corp. · 2026-09-30In assessing value in use, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to
ssmr 20260630Sunshine Silver Mining & Refining Company · 2026-09-30As part of the Sunshine Mine Feasibility Study, the Company is advancing plans for a new mill designed to process up to 2,000 tonnes per day (" tpd "), providing flexibility to increase throughput beyond the current base
ele 20251231Elemental Royalty Corporation · 2026-09-30Accordingly, mineral resource and mineral reserve estimates, and other scientific and technical information, contained in the documents incorporated by reference into this Annual Report on Form 40‑F may not be comparable
Financial Statements Q2 2026 & Management’s Discussion and Analysis Q2 2026Goldsky Resources Corp. · 2026-09-30On December 31, 2025, the Company announced additional results from its 2025 diamond drill program at the Aida target ("Aida"), located within the Company's 100%-owned Paubäcken project. -6- Goldsky Resources Corp. secon
ssmr 20260723Sunshine Silver Mining & Refining Company · 2026-09-30On July 23, 2026, Sunshine Silver Mining & Refining Company issued a press release announcing drill results from its ongoing drilling program at the Sunshine Mine in Idaho’s Silver Valley.
Financial Statements Q1 2026 & Management’s Discussion and Analysis Q1 2026Goldsky Resources Corp. · 2026-09-30Highlight drill result releases from the first six months of 2018 include: hole RIS-17007 that yielded 32.0 metres grading 2.92 g/t gold and RIS-17005 that yielded 1.0-metre grading 248.0 g/t gold and expanding the Risbe
Management’s Discussion and Analysis Q4 2025 (Audited)Goldsky Resources Corp. · 2026-09-30Highlight drill result releases from the first six months of 2018 include: hole RIS-17007 that yielded 32.0 metres grading 2.92 g/t gold and RIS-17005 that yielded 1.0-metre grading 248.0 g/t gold and expanding the Risbe
Bunker Hill Announces Robust Restart PEA: $101M NPV, 46% IRR, 2.5 Year Payback, $42M Initial Capex, $20M Average Annual FCF Over 10 YearsBunker Hill Mining Corp. · 2026-09-30The PEA contemplates a $42 million initial capital cost (including 20% contingency) to rapidly restart the mine, generating approximately $20 million of annual average free cash flow over a 10-year mine life, and produci
Bunker Hill Announces Updated Drill Results, Including High Grade Silver-Lead Vein Extensions Outside Current ResourceBunker Hill Mining Corp. · 2026-09-30Combined with the ongoing compilation and re-interpretation of historic data, these results indicate some of the significant upside potential of the mine beyond its existing resource envelope.” A total of 16 holes
MD&A – Q1 Financial Statements & Management Discussion & Analysis MD&AElemental Royalty Corporation · 2026-09-30At full capacity, Viscaria expects to produce approximately 26,000 tonnes of copper per year over an initial 17 year mine life.
MD&A – Q4 Financial Statements & Management Discussion & Analysis MD&AElemental Royalty Corporation · 2026-09-30The Company noted that the PFS will incorporate updated technical work and recent resource progress, supported by a strengthened financial position following recent equity financing.
MD&A – Q2 Financial Statements & Management Discussion & Analysis MD&AElemental Royalty Corporation · 2026-09-30The updated resource will support the ongoing Definitive Feasibility Study, which is targeted for completion in the third quarter of 2026, with production remaining targeted to commence in 2027.
10 K Dec 31 2025Bunker Hill Mining Corp. · 2026-09-30In addition, the grade of ore ultimately mined, if any, may differ from that indicated by future feasibility studies and drill results.
Financial Statements June 30 2022 Q222Bunker Hill Mining Corp. · 2026-09-30Under ASC 470-50, Debt Modifications and Extinguishments, the Company performed a comparison of NPV’s of the pre-settlement Cost Recovery obligation to the post-settlement schedule of Cost Recovery obligation to determin
bunker hill intersects additional high grade silver in the cate 8 vein individual drill samples to 163 ozton silver 411 lead 741 zincBunker Hill Mining Corp. · 2026-09-30The latest drill results continue to confirm the continuity and scale of high-grade silver-polymetallic mineralization at the recently discovered Cate-8 zone while supporting the Company's objective of completing an init
NI CardChesapeake Gold Corp. · 2026-09-30By providing an e-mail address, you will be deemed to be consenting to the electronic delivery to you at such e-mail address of the financial statements and MD&A in Adobe PDF format, if electronic delivery is allowed by
MD&A – Q3 Financial Statements & Management Discussion & Analysis MD&AElemental Royalty Corporation · 2026-09-30MANAGEMENT’S DISCUSSION AND ANALYSIS For the three and nine months ended September 30, 2025 (Expressed in US Dollars, unless otherwise indicated) • On September 1, 2025, the Company acquired the Dugbe royalty for an init
exh 993TRX Gold Corporation · 2026-09-30LOM sustaining capital cost of $87 million is estimated for site and process plant, and $97 million for underground mining; · The PEA mine plan was developed from Measured and Indicated Mineral Resources of 10.8 m
exh 992TRX Gold Corporation · 2026-09-30The UOP method results in a depreciation charge based on the ounces of gold produced in a period as a portion of estimated total recoverable ounces of gold considered probable of economic extraction based on the current
ssmr 20260812Sunshine Silver Mining & Refining Company · 2026-09-30On August 12, 2026, Sunshine Silver Mining & Refining Company (the “Company”) issued a press release announcing its financial results for the quarter ended June 30, 2026.
ele 20251231 d2Elemental Royalty Corporation · 2026-09-30Dollars ($000s), except where indicated) Note 3 - Material Accounting Policies (continued) When the cost of the acquisition exceeds the fair values of the identifiable net assets acquired, the difference is recorded as g
Report updating its Mineral Resource estimate (“MRE”) with an effective date as of January 21, 2026. DianeHycroft Mining · 2026-09-30PO Box 3030 Winnemucca, NV 89446 NEWS RELEASE Hycroft Delivers 55% Growth in Mineral Resources 16.4 million gold ounces / 562.6 million silver ounces (M+I)` Initial High-Grade Silver Resource: 90.2 million silver ounces
Hycroft Mining source documentHycroft Mining · 2026-09-30PO Box 3030 Winnemucca, NV 89446 NEWS RELEASE Hycroft Extends High-Grade Silver at Brimstone and Vortex Vortex extends ~150 meters west, with 12.5 meters at 375.41 g/t silver, including 4.2 meters of 748.02 g/t silver WI
Hycroft Mining source documentHycroft Mining · 2026-09-30PO Box 3030 Winnemucca, NV 89446 NEWS RELEASE Vortex and Brimstone Continue to Expand With Higher Grades Vortex returns 30.5 meters at 780.53 g/t silver and 6.1 meters at 21.12 g/t gold Brimstone extends north with 5.5 m
Hycroft Files 2025 10-K and Provides Corporate UpdateHycroft Mining · 2026-09-30Engineering teams and independent consultants are currently incorporating: • Recent mine plan based on the new resource which contains in excess of one billion mineral resource tonnes • Infrastructure re-design specifica
Hycroft Reports Q2 2026 Results With Strong Balance SheetHycroft Mining · 2026-09-30Ranges of potential tonnage and grade (or quality) of an exploration target are conceptual in nature; there has been insufficient exploration of the relevant property or properties to estimate a mineral resource; and it
Hycroft Files First Quarter 2026 10-Q and Provides Corporate UpdateHycroft Mining · 2026-09-30First Quarter 2026 Highlights • Maintained injury free safety record with no lost-time incidents, 0.00 total recordable injury frequency rate (“TRIFR”) and more than 1.4 million work hours without a lost-time incident •
Management discussion and analyses for the second quarter endedAbcourt Mines Inc. · 2026-09-30The most significant intersection comes from channel 11, with 10.4 g/t gold over 12 meters, including 29 g/t gold over 4 meters.
Hycroft Delivers $10 Billion NPV from Technical Report at Spot PricesHycroft Mining · 2026-09-30PO Box 3030 Winnemucca, NV 89446 NEWS RELEASE Hycroft Delivers $10 Billion NPV from Technical Report at Spot Prices While Advancing High-Grade Brimstone and Vortex Silver Discoveries WINNEMUCCA, NV, June 2, 2026 – Hycrof
Management discussion and analyses for the Third Quarter endedAbcourt Mines Inc. · 2026-09-30The most significant intersection comes from channel 11, with 10.4 g/t gold over 12 meters, including 29 g/t gold over 4 meters.
Management discussion and analysis Three and nine months endedAbcourt Mines Inc. · 2026-09-30Royalties As at March 31, 2026, the following royalties are payable on production done on the Company mining properties: Properties Royalties Elder 2 to 3% NSR Vendôme 2% NSR on Xstrata claims Tagami 1 to 2% NSR Jonpol 2
Management discussion and analyses for the First Quarter endedAbcourt Mines Inc. · 2026-09-308 PEA Highlights Base Case Scenario: Gold Price : 1800 $ US/oz, Exchange Rate: 1.00 USD = 1.30 CAD, Discount Rate : 5 % NPV5% after taxes and mining duties (M CAD) 53.4 IRR after taxes and mining duties (%) 32.8 In
Condensed consolidated interim financials statements three months ended .Abcourt Mines Inc. · 2026-09-30The payments schedule was determined by taking into account the measured and indicated resources, the estimated annual production level and the estimated mine life.
Condensed consolidated interim financial statements Three and nine months ended (unaudited - in canadian dollars)Abcourt Mines Inc. · 2026-09-30The results of optimization studies and technical evaluations carried out to mitigate project risks, while maintaining all necessary permits and concluded that technical feasibility and commercial viability have been ach
Perpetua Resources Announces Third Quarter 2025 and Recent HighlightsPerpetua Resources Corp. · 2026-09-30EXIM on September 8, 2025 regarding the Company’s application for $2.0 billion in debt financing. • Conditional Notice to Proceed received from the USFS on September 19, 2025 authorizing Project development upon placemen
Perpetua Resources Announces First Quarter 2026 Financial ResultsPerpetua Resources Corp. · 2026-09-30EXIM Board in the amount indicated, the Company would have sufficient capital to fully finance the Project's estimated direct capital costs of $2,576 million — combining the U.S.
2025 Second Quarter ReportPerpetua Resources Corp. · 2026-09-30According to the Financial Update, as of December 31, 2024, the total initial capital cost estimate for the Project was approximately $2,215 million, excluding debt service and other financing costs.
2026 First Quarter ReportPerpetua Resources Corp. · 2026-09-30EXIM in the amount indicated, the Company would have sufficient capital, together with $669.5 million of cash on hand as of March 31, 2026, to finance the estimated direct capital costs of $2,576 million to construct the
Management's Discussion and AnalysisWest Red Lake Gold Mines Ltd · 2026-09-30The PFS validated the rationale to restart Madsen Mine by generating strong economic results, including almost $70 million in average annual free cash flow over 6 full production years.
2025 Third Quarter ReportPerpetua Resources Corp. · 2026-09-30According to the Financial Update, as of December 31, 2024, the total initial capital cost estimate for the Project was approximately $2,215 million, excluding debt service and other financing costs.
CONSOLIDATED FINANCIAL STATEMENTSWest Red Lake Gold Mines Ltd · 2026-09-30These expenditures are expensed until such time as the technical feasibility and commercial viability of extracting a mineral reserve for a particular property are demonstrable or the property is disposed of, either thro
2025 Annual ReportPerpetua Resources Corp. · 2026-09-30Early Production Life-of-Mine Component Years 1-4 Years 1-15 Recovered Gold Total (Koz) 1,852 4,223 Recovered Antimony2 Total (Mlbs) 69 106 Recovered Gold Annual Average (Koz) 463 296 Cash Costs (net of by-product credit
Perpetua Resources Reports New High-Grade Gold and Antimony Discoveries and a New Gold-Tungsten Zone at StibnitePerpetua Resources Corp. · 2026-09-30These results collectively demonstrate further opportunities to grow and unlock the 3.1 million ounces of indicated and inferred gold resources and 99.8 million pounds of antimony resources that are located outside curre
Report – Financial Report and Commentary 6 months to 30 June 2025Serabi Gold plc · 2026-09-30In assessing value in use, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to
Carangas Project Preliminary Economic Assessment – August 27, 2026New Pacific Metals · 2026-09-30This second LOM composite sample represented an average mill feed composition during the first eight years of commercial production, and consisted of 17.0% oxidized domain, 3.0% transitional domain and 80.0% fresh (sulfi
Quarter Management’s Discussion and Analysis (MD&A)New Pacific Metals · 2026-09-30Management’s Discussion and Analysis For the three and nine months ended March 31, 2026 (Expressed in United States dollars, unless otherwise stated) ▪ 13 years mine life, excluding the 2 years pre-production period, pro
Jun 30, 2026 Fourth Quarter & Year-End Management’s Discussion and Analysis (MD&A)New Pacific Metals · 2026-09-30Highlights of the Silver Sand PFS Technical Report are as follows: Post-tax NPV at a 5% discount rate of $740 million and IRR of 37% at a base case price of $24.00/oz silver; 13 years mine life, excluding the 2 years
March 31, 2026 Third Quarter Consolidated Interim Financial StatementsNew Pacific Metals · 2026-09-30The following table sets forth the Company’s financial assets that are measured at fair value on a recurring basis by level within the fair value hierarchy as at March 31, 2026 and June 30, 2025 that are not otherwise Pa
Jun 30, 2026 Year-End Audited Consolidated Financial StatementsNew Pacific Metals · 2026-09-30Exploration and evaluation costs, incurred associated with specific mineral rights and properties prior to demonstrable technical feasibility and commercial viability of extracting a mineral resource, are capitalized.
Dec 31, 2025 Second Quarter Consolidated Interim Financial StatementsNew Pacific Metals · 2026-09-30The following table sets forth the Company’s financial assets that are measured at fair value on a recurring basis by level within the fair value hierarchy as at December 31, 2025 and June 30, 2025 that are not otherwise
Management’s Discussion and Analysis of FinancialAya Gold & Silver · 2026-09-30The updated mine plan released in Q4-2025 extends the operation’s life to 2036, supporting an average annual production profile of approximately 6 Moz of silver over the life of mine (“LOM”).
Technical Report - Galena Complex, Idaho, USAAmericas Gold & Silver · 2026-09-30Galena Complex Technical Report, Page | 21 Shoshone Co., Idaho 1.5 Capital and Operating Cost Estimates Capital cost for the Galena modernization project totals $45.9M (Table 1-3).
aaue 20251231Allied Gold Corporation · 2026-09-30The SEC has indicated that the designation of a person as an audit committee financial expert does not make such person an “expert” for any purpose, impose on such person any duties, obligations or liability that are gre
Download (opens in new window) PDF 666 KBAllied Gold Corporation · 2026-09-30For three months ended Sadiola Key Performance Information September 30, (100% Basis) 2025 Operating Ore mined (M tonnes) 0.82 Waste mined (M tonnes) 6.79 Ore processed (M tonnes) 1.24 Gold Production (Ounces) 42,174 Sal
alliedgoldmda2025yeAllied Gold Corporation · 2026-09-30In addition to operational factors, the increased waste removal in 2025 allows for less reliance on short-term resource conversion to support production levels in 2026, creating a bridge to focus additional exploration s
FrançaisWallbridge Mining Company Limited · 2026-09-30Highlights of the PEA are as follows: • Average annual gold production of 127,000 oz per year during the first five years and an average annual gold production of 107,000 oz per year with a 96% average gold recovery over
wmcl Financial Statements q4 2024Wallbridge Mining Company Limited · 2026-09-30These financial statements have been prepared on an historical cost basis except for certain financial assets and liabilities which are measured at fair value.
FrançaisWallbridge Mining Company Limited · 2026-09-30These financial statements have been prepared on an historical cost basis except for certain financial assets and liabilities which are measured at fair value.
Annual ReportSEABRIDGE GOLD INC · 2026-09-30Ore delivery to the mill is pit production with a rapid payback thanks in part to a very increased from an initial 130,000 tonnes per day (“tpd”) to low strip ratio (approximately 1:1) for such a large mine.
Regis Resources Ltd Modern Slavery Statement FY25Regis Resources Ltd · 2026-09-30WA 1 Duketon 2 Tropicana Kalgoorlie Perth NSW McPhillamys 3 Sydney STRONG PLATFORM IN A TIER-1 LOCATION Total Resources1 Total Reserves1 7.5 Moz 1.7Moz 1 DUKETON (100%) 2 TROPICANA (30%) 3 MCPHILLAMYS (100%) • FY25 produ
Drilling results Apollo 101125Collective Mining Ltd · 2026-09-30123.1 165.35 42.25 1.24 18 0.04 0.001 - - - 1.54 - From 217.00m hole abandoned before reaching target depth APC-86 13 53 143.3 90.3 1.65 10 0.03 0.001 - - - 1.81 - Incl.
Quarterly Report Q2 December FY25St Barbara Ltd · 2026-09-30Simberi gold production for Q2 Dec FY25 was 10,262 ounces at AISC of A$5,916 per ounce, in line with the lower production, but exacerbated by higher than anticipated fixed and mobile plant maintenance costs.
factsheet caribooOsisko Gold Group Inc. · 2026-09-302025 FEASIBILITY: ROBUST FREE CASH FLOW PROFILE1,2 after-tax, C$ millions Gold payable production (koz) 223 207 207 199 176 181 183 177 171 +$163 112 Incremental Free Cash Flow US$3,300/oz Au +$141 +$244 +$138 +$121 +$13
Osisko Gold Group Inc. source documentOsisko Gold Group Inc. · 2026-09-30The six drill hole fans reported herein comprise an additional ~5,043 meters (" m ") of underground infill drilling, bringing the total tally of drilling with full results to 11,025 m, or ~80% of the planned total.
Q4 Highlights Infographic PDFBarrick Mining · 2026-09-30This infographic provides a summary of Barrick Mining's Q4 2025 performance, highlighting financial results, production achievements, capital allocation, and project updates. It includes group-level gold and copper produ
